Eight residential projects on the Old Madras Road (NH-75) belt between Budigere Cross and Hoskote received Karnataka RERA registration in 2026, from Brigade Belvedere on 24 March to Sanjeevini Aarka on 19 November. Official starting prices published by the builders run from ₹97 lakh (a 1 BHK at Brigade Belvedere) to ₹1.65 crore (Sobha OneWorld), and RERA completion dates run from 30 September 2029 to 30 September 2033.
Updated 20 November 2026. We opened each project's K-RERA registration certificate for its number, village and completion date, and the builder pages of Sobha, Brigade, Sattva, Assetz and Sumadhura for sizes and prices. Pages that only collect expressions of interest are not included.
Summary: Old Madras Road projects registered in 2026
Ordered by registration date. Format: project — builder — village — K-RERA no. — official price — RERA completion.
- Brigade Belvedere — Brigade Enterprises — Cheemasandra — PRM/KA/RERA/1251/446/PR/240326/008549 — from ₹97 lakh — 31 March 2031
- One Residences at Sobha OneWorld — Sobha — Amanidoddakere — PRM/KA/RERA/1250/304/PR/080526/008634 to 008639 — from ₹1.65 crore — 31 July 2032 to 30 September 2033 by phase
- Sattva Aangane — Sattva Resi — Bandapura — PRM/KA/RERA/1251/446/PR/180926/008944 — price on request — 21 October 2032
- Sumadhura Belfort — Sumadhura Infracon — Nadavathi — PRM/KA/RERA/1250/304/PR/230926/008960 — price on request — 31 August 2030
- Silver Horizon — Green Edge Infracon — Khajisonnenahalli — PRM/KA/RERA/1251/446/PR/071026/009002 — not published — 1 August 2030
- Assetz Naru & Nami Phase 1 — APG Projects (Assetz) — Dandupalaya — PRM/KA/RERA/1250/304/PR/081026/009004 — not published — 31 January 2032
- Bold Alturas — Bold Buildtech — Dandupalya and Kannurahalli — PRM/KA/RERA/1251/446/PR/171126/009106 — not published — 31 December 2029
- Sanjeevini Aarka — Sanjeevini Properties — Dandupalya — PRM/KA/RERA/1250/304/PR/191126/009117 — not published — 30 September 2029
Brigade Belvedere, Budigere Main Road
- K-RERA no.: PRM/KA/RERA/1251/446/PR/240326/008549, registered 24 March 2026; Cheemasandra village, Bidarahalli hobli (now Bengaluru East taluk).
- Brigade's page: 10.75 acres, five towers, 1,750 homes, 715–2,013 sq ft super built-up; construction ‘in its early phases’.
- Official prices (onwards, before government charges and taxes): 1 BHK ₹97 lakh; 2 BHK ₹1.45 crore; 3 BHK + 2T ₹1.75 crore; 3 BHK + 3T ₹2.13 crore; 3 BHK + 3T + study ₹2.56 crore.
- RERA completion date: 31 March 2031 (Brigade's page does not state one).
- Our project page: Brigade Belvedere
One Residences at Sobha OneWorld, Old Madras Road (Hoskote)
- K-RERA nos.: PRM/KA/RERA/1250/304/PR/080526/008634 to 008639 (six registrations, 8 May 2026). The certificate places Phase 1 in Amanidoddakere village under the Hoskote taluk code (304); Sobha markets the address as Greater Whitefield.
- Sobha's page: 48 acres 15.32 guntas, 3,484 homes, 2, 3 and 4 bed plus a few 1 bed, 1,063–2,415 sq ft, from ₹1.65 crore.
- Completion by phase (Sobha's page): Phase 1 (Wings 1–2) 31 July 2032; Phase 6 (Wings 12–14) 31 August 2032; Phase 4 (Wings 3–4) 30 November 2032; Phase 5 (Wings 9–11) 28 February 2033; Phases 2 and 3 (Wings 5–8) 30 September 2033.
- Our project page: ONE Residences At Sobha ONE World
Sattva Aangane, near Budigere Cross
- K-RERA no.: PRM/KA/RERA/1251/446/PR/180926/008944, registered 18 September 2026. Sattva's own page shows the same number, and the certificate names Sattva Resi Pvt Ltd as promoter (Bandapura village).
- Sattva's page: a 10.37-acre development beside Cheemasandra Lake, seven towers from G+29 to G+42, 997 homes, 3 and 4 BHK plus duplexes, 45,000 sq ft clubhouse. Price on request.
- RERA completion date: 21 October 2032.
- Our project page: Sattva Aangané
Sumadhura Belfort, Soukya Road–Hoskote side
- K-RERA no.: PRM/KA/RERA/1250/304/PR/230926/008960, registered 23 September 2026; Nadavathi village, Kasaba hobli, Hosakote; promoter Sumadhura Infracon Pvt Ltd.
- Sumadhura's page: new launch, 2 and 3 BHK (2.5 BHK in the page title), 22,000+ sq ft clubhouse, possession August 2030.
- RERA completion date: 31 August 2030.
- Our project page: Sumadhura Belfort
Silver Horizon by Green Edge, Khajisonnenahalli
- K-RERA no.: PRM/KA/RERA/1251/446/PR/071026/009002, registered 7 October 2026; survey nos. 127/3 and 128/4, Khajisonnenahalli village, Bidarahalli hobli, Bangalore East taluk; promoter Green Edge Infracon.
- RERA completion date: 1 August 2030.
- Project-level detail (carpet areas, tower height): Silver Horizon Budigere Cross: RERA, 33 Floors, Sizes 2026
Assetz Naru & Nami (Codename Sublime), Dandupalaya–Hoskote
- K-RERA no.: PRM/KA/RERA/1250/304/PR/081026/009004, registered 8 October 2026, as ‘Assetz Naru & Nami Phase 1’; Dandupalaya village, Hosakote; promoter APG Projects Pvt Ltd. The number appears in the footer of Assetz's Codename Sublime page.
- Assetz's page: about 11 acres; 3 BHK Type 7 is 1,945 sq ft super built-up (1,358 sq ft carpet plus balcony) and Type 8 is 1,735 sq ft (1,219 sq ft). When you book, quote the footer number and match it to the certificate.
- RERA completion date: 31 January 2032. A portal ranking page shows December 2030; the certificate date is the binding one.
- Our project page: Assetz Naru & Nami
Bold Alturas, Dandupalya Main Road
- K-RERA no.: PRM/KA/RERA/1251/446/PR/171126/009106, registered 17 November 2026 (application acknowledged 16 October 2026).
- Location on K-RERA: survey no. 62/1 of Dandupalya and 168/1, 168/2 and 168/4 of Kannurahalli, Kasaba hobli, Hoskote taluk; promoter Bold Buildtech Pvt Ltd.
- RERA completion date: 31 December 2029.
Sanjeevini Aarka, Dandupalya
- K-RERA no.: PRM/KA/RERA/1250/304/PR/191126/009117, registered 19 November 2026, the newest project on this list.
- Location on K-RERA: survey no. 130 (parts), Dandupalya village, Kasaba hobli, Hoskote taluk; promoter Sanjeevini Properties Pvt Ltd.
- RERA completion date: 30 September 2029, the earliest on this corridor list.
Old Madras Road new launch price per sq ft: what the official prices show
Only Brigade and Sobha publish prices for their 2026 Old Madras Road launches. Brigade's 1 BHK at ₹97 lakh and its smallest unit of 715 sq ft super built-up give an entry rate of about ₹13,570 per sq ft; Sobha's ₹1.65 crore against its 1,063 sq ft smallest size gives about ₹15,520 per sq ft. These are starting price divided by smallest size, so they are only a rough guide, and neither builder states which unit the starting price buys.
Brigade's ladder also shows what bathrooms and a study add: the 3 BHK goes from ₹1.75 crore with two bathrooms to ₹2.13 crore with three and ₹2.56 crore with three plus a study. For a citywide comparison see New Launch Projects Bangalore: Price per Sq Ft 2026, by Project and Old Madras Road.
Possession dates on Old Madras Road: RERA completion by year
- 2029: Sanjeevini Aarka (30 September), Bold Alturas (31 December).
- 2030: Silver Horizon (1 August), Sumadhura Belfort (31 August).
- 2031: Brigade Belvedere (31 March).
- 2032: Assetz Naru & Nami Phase 1 (31 January), Sobha OneWorld Phase 1 (31 July), Sattva Aangane (21 October).
- 2033: Sobha OneWorld Phases 2, 3 and 5 (28 February and 30 September).
- Nearby and further along: Sobha Galera's 40 row houses on Whitefield–Hoskote Road (K-RERA PRM/KA/RERA/1251/446/PR/050123/005601; Sobha's completion date December 2026; from ₹5.25 crore) — Sobha Galera
How to verify an Old Madras Road project on K-RERA
- Get the full number from the advert or the builder's page; Sattva, Sobha, Brigade, Assetz and Sumadhura all print it.
- Open rera.karnataka.gov.in/certificate?CER_NO= plus the number. Match the village and promoter to your sale agreement: the promoter is often a group company (APG Projects for Assetz, Sattva Resi for Sattva, Sumadhura Infracon for Belfort).
- Note the taluk code: 304 is Hoskote in Bengaluru Rural (1250); 446 is Bengaluru East in Bengaluru Urban (1251). Several Hoskote-side villages now sit under Bengaluru East.
- For phased projects such as Sobha OneWorld, ask which wing and which registration your flat falls under, because each phase has its own completion date.
- Step-by-step guide: How to Check RERA Registration in Karnataka: 7 Steps
Old Madras Road infrastructure: what is confirmed
A Purple Line extension from KR Puram to Hoskote is still at feasibility stage. Swarajya reported on 29 January 2026 that BMRCL is studying a 16 km metro-cum-double-decker structure with tentative stops including Budigere Cross, Kattamanallur Gate and Hoskote; there is no DPR, cost or timeline yet. Treat it as a study, not a plan.
For the corridor overview see Old Madras Road, Bangalore, Hoskote, Bangalore and Budigere Cross, Bangalore. Our 2027 pipeline lists are at Upcoming Projects in Hoskote 2027: New Launches with RERA and Upcoming Projects in Budigere Cross 2027: RERA List and Prices.