A partial occupancy certificate (partial OC) in Bangalore lets people lawfully occupy a completed part of a project, such as one tower or block, while the rest is still being built. You can take possession with one if the partial OC names your block (and your floors, where it is floor-wise). Bengaluru's 2003 building bye-laws forbid occupying any new building ‘or part of a new building’ without a certificate, and Bye-law 5.7 lets the authority allow partial occupancy in exceptional cases with recorded reasons. The Karnataka High Court held in 2013 that such a certificate must be unconditional and issued only when that part is complete in every respect.

Updated 18 November 2026. We read the Karnataka High Court's judgment of 1 October 2013 on a partial OC (as published on Indian Kanoon), the RERA Act's definitions and promoter duties, the RBI's rules on loans for built property, and two published OC explainers. The municipal server that hosts partial-OC letters refused connections when we tried it, so we describe how to find them rather than quoting one. General information, not legal advice.

What is a partial OC, and what law allows it?

  • The rule: Bye-law 5.7 of the Bangalore building bye-laws, 2003 says no person shall occupy, or let others occupy, a new building or part of one until the certificate is granted. In exceptional cases, with reasons recorded, the authority may allow partial occupancy for different floors of a building (as quoted by the Karnataka High Court, 1 October 2013).
  • The court's reading: a partial OC can be granted only if the authorised officer is of the opinion that the building, or the part concerned, is complete in every respect according to the sanctioned plan. A certificate with conditions attached was held to be outside Bye-law 5.7 and was quashed, as was one without the officer's recorded opinion.
  • The full OC: Bye-law 5.6 governs the full certificate and, the court noted, requires an inspection, an architect's or engineer's certificate and, for high-rises, fire clearance.
  • RERA's definition: an ‘occupancy certificate’ is any certificate, by whatever name, issued by the competent authority permitting occupation of a building with civic infrastructure such as water, sanitation and electricity (Section 2(zf)).

Partial OC vs full OC: what is the difference?

  • Coverage: a partial OC covers the completed block, tower or floors it names; the full OC covers the whole building or project as sanctioned. Sobha's explainer describes a partial OC as allowing occupation of the approved portion while remaining work continues.
  • Who moves in: only owners in the covered part. Sobha says a tower can be occupied only if the authority has approved that specific portion.
  • What follows: further partial OCs as other towers finish, or a final OC for the remaining work. Ask the promoter which it expects.
  • Versus a completion certificate: a CC says the building matches the sanctioned plan; the OC permits occupation. See Occupancy Certificate vs Completion Certificate in Bengaluru: What to Demand Before You Take Possession.

Can you take possession with a partial OC?

Yes, for a flat in the covered part. RERA Section 11(4)(b) makes the promoter responsible for obtaining the completion or occupancy certificate and making it available to allottees, and Section 19(10) requires allottees to take physical possession within two months of the occupancy certificate ‘issued for the said apartment’. That wording fits a partial OC that names your tower. If your tower is not in the certificate, the clock has not started for you, and moving in would be occupying without a certificate.

Before you accept the keys, use our handover list at Flat Possession Checklist: Bangalore Snag List and Documents. Construction will still be going on in other towers, so ask how site traffic, noise and safety will be separated from the occupied block.

How to find and verify a partial OC

  • K-RERA: open the project on rera.karnataka.gov.in and check its completion details and uploaded documents. Our walkthrough for downloading an OC: Occupancy Certificate Download Online in Bangalore: Check an OC.
  • Ask the promoter for the certificate PDF and the covering letter, and match the file or LP number with the sanctioned plan.
  • Read the scope line: block, tower and floor numbers covered. Your flat number must fall inside it.
  • Check that it is unconditional on its face. The 2013 ruling held that a partial OC must be absolute for the part it covers.
  • Ask for the utility papers for your block: the electricity and water connection letters, and the fire clearance where the block is a high-rise (see Fire NOC in Bangalore: Which Buildings Need It, How to Check).
  • If the documents conflict, write to the issuing town-planning office of the city corporation to confirm the certificate number and scope.

Partial OC and your home loan, khata and resale

  • Final disbursement: RBI para 92(5) requires the bank's architect to certify, before disbursement, that a built property follows the sanctioned plan or bye-laws. Ask your lender in writing whether it will release the last tranche against a partial OC covering your block; policies vary.
  • Khata: a new A-khata on the GBA e-Aasthi route asks for an approved plan and OC, and Sobha's explainer says that without a valid OC you would get a B-khata. Whether a partial OC is accepted for your block is decided on the application; keep the certificate and plan ready. Background: E-Khata Without Occupancy Certificate in Bangalore: The Rules.
  • Resale: a buyer's lender will run the same legal check, so a partial OC that clearly names your block is the document to keep with your sale deed.
  • Association matters: some duties under the Karnataka Apartment (Ownership and Management) Act, 2026 run from the OC; see Karnataka Apartment Act 2026 Notified: What Flat Owners Must Do and ask the promoter how it will apply them to a phased project.