Three residential projects in Hoskote taluk show an occupancy certificate (OC) on the Karnataka RERA portal as of 20 November 2026: Birla Alokya on Soukya Road (OC 18 May 2024), Encore in the Shire at Mallasandra (18 September 2024) and Sowparnika Ashiyana Phase II at Samethanahalli (17 March 2025). Fifteen more Hoskote and Old Madras Road registrations have K-RERA completion dates between 15 December 2026 and 31 December 2027, led by SOBHA Galera's row houses on Whitefield–Hoskote Road (31 December 2026).
Updated 20 November 2026. We pulled the K-RERA register for Hosakote taluk (Bengaluru Rural district), opened each shortlisted project's K-RERA detail page and read its ‘Occupancy certificate received’ field, and opened Sobha's Galera page. We call a project OC-received only where K-RERA shows it. Most listing sites mix resale stock and old possession years; this list is registration-led.
Summary: Hoskote projects with an OC on K-RERA
Ordered by OC date. Format: project — promoter — village — K-RERA no. — OC date (K-RERA).
- Birla Alokya — Birla Estates Pvt Ltd — Koraluru and Thirumalashettyhalli, Soukya Road — PRM/KA/RERA/1250/304/PR/190724/002725 — 18 May 2024
- Encore in the Shire — Sai Srinivasa Constructions — Mallasandra, Kasaba hobli — PRM/KA/RERA/1250/304/PR/071022/005305 — 18 September 2024
- Sowparnika Ashiyana Phase II — Sowparnika Projects and Infrastructure — Samethanahalli, Anugondanahalli hobli — PRM/KA/RERA/1250/304/PR/201215/003748 — 17 March 2025
SOBHA Galera, Whitefield–Hoskote Road (near Kannamangala)
Galera is the branded near-possession project on this corridor. Sobha's page lists 40 four-bedroom row houses (32 duplex, 8 triplex) of 3,009–4,340 sq ft on 4.08 acres, each with two car parks, from ₹5.25 Cr, and says the project ‘will be completed by December 2026’. K-RERA shows the same: 31 December 2026. Note its number carries 1251/446 (Bengaluru Urban, Bengaluru East), not Hoskote's 1250.
- K-RERA no.: PRM/KA/RERA/1251/446/PR/050123/005601
- Our page: Sobha Galera
Near possession in Hoskote: K-RERA dates to December 2027
Ordered by K-RERA completion date. All are in Hosakote taluk (code 1250/304) unless noted.
- Whispers of Bliss (Venkateswara Creators), Muthsandra — PRM/KA/RERA/1250/304/PR/110725/007910 — 15 December 2026
- SOBHA Galera, Whitefield–Hoskote Road (Bengaluru East) — PRM/KA/RERA/1251/446/PR/050123/005601 — 31 December 2026
- Purva Oakshire (plots, Puravankara), Rampura off Avalahalli Road (Bengaluru East) — PRM/KA/RERA/1251/446/PR/150323/005796 — 31 December 2026. Our page: Purva Oakshire
- Godrej Woodland and Woodland Phase 2 (plots), Thiruvaranga — PRM/KA/RERA/1250/304/PR/210208/003856 and …/020922/005201 — 31 December 2026
- Triaxis Splendour +, Dandupalya — PRM/KA/RERA/1250/304/PR/210312/004001 — 31 December 2026
- Misty Winds (Chennam Rangaswamy), Hosakote village — PRM/KA/RERA/1250/304/PR/180319/001492 — 31 December 2026
- JP Lavender Blocks A and B (JP Housing Corporation), Hoskote — PRM/KA/RERA/1250/304/PR/180524/006898 and …/006896 — 31 December 2026
- VR Sapphire (VR Builders and Developers), Kannurahalli — PRM/KA/RERA/1250/304/PR/270924/007086 — 31 December 2026
- Isha Hilife (Isha Corp), Thirumalashettihalli — PRM/KA/RERA/1250/304/PR/030524/006836 — 31 December 2026
- Bold Aspire (Bold Developers) — PRM/KA/RERA/1250/304/PR/210924/007058 — 31 December 2026
- Adarsh Paradise (A1 Builders) — PRM/KA/RERA/1250/304/PR/130723/006063 — 31 December 2026
- Sowparnika Indradhanush Phase I — PRM/KA/RERA/1250/304/PR/230522/004913 — 31 May 2027
- Sowparnika Indradhanush Phase II — PRM/KA/RERA/1250/304/PR/200123/005641 — 30 November 2027
- Sthitha Nature Walk, Dandupalya — PRM/KA/RERA/1250/304/PR/210525/007766 — 31 December 2027
- JP Hibiscus (JPHC Pvt Ltd) — PRM/KA/RERA/1250/304/PR/301224/007328 — 31 December 2027
Why do Hoskote RERA numbers start with 1250, and Old Madras Road ones with 1251?
The four-digit code after PRM/KA/RERA/ is the district: 1250 for Bengaluru Rural and 1251 for Bengaluru Urban. The next code is the taluk: 304 for Hosakote, 446 for Bengaluru East. So a project on the Hoskote side of the city limits (Birla Alokya, Sowparnika Ashiyana) reads 1250/304, while one just inside Bengaluru East along Old Madras Road or Whitefield–Hoskote Road (SOBHA Galera, Purva Oakshire, or Brigade Belvedere at Budigere Cross, PRM/KA/RERA/1251/446/PR/240326/008549, Brigade Belvedere) reads 1251/446. The difference also tells you which district's sub-registrar and planning authority handle the property; see Bangalore Rural District Taluks: Devanahalli, Hoskote Explained.
New launches on the same corridor (for comparison)
If none of the ready or near-ready homes suit you, these registered 2026 launches on Old Madras Road and Hoskote are years from handover; dates are K-RERA completion dates.
- One Residences at SOBHA OneWorld (PRM/KA/RERA/1250/304/PR/080526/008634 and five more): Phase 1 31 July 2032; from ₹1.65 Cr (Sobha). ONE Residences At Sobha ONE World
- Assetz Naru & Nami Phase 1, Dandupalya (PRM/KA/RERA/1250/304/PR/081026/009004): 31 January 2032. Assetz Codename Sublime Is Now Naru & Nami: RERA, Units, 2032
- Bold Alturas, Dandupalya Main Road (PRM/KA/RERA/1251/446/PR/171126/009106, registered 17 November 2026): 31 December 2029
- Sumadhura Belfort, Soukya Road (PRM/KA/RERA/1250/304/PR/230926/008960): 31 August 2030. Sumadhura Belfort
Flats, row houses or plots: what is nearly ready in Hoskote?
The near-possession list mixes three formats, and each needs a different completion check.
- Apartments (most of the list): Triaxis Splendour +, Misty Winds, JP Lavender, VR Sapphire, Isha Hilife, Bold Aspire, Adarsh Paradise, Sowparnika Indradhanush, Sthitha Nature Walk, JP Hibiscus and Whispers of Bliss. Check the OC for your block once the K-RERA date nears.
- Row houses: SOBHA Galera's 40 duplex and triplex homes (3,009–4,340 sq ft). When the OC is issued, confirm it lists your row-house number.
- Plotted layouts: Purva Oakshire near Avalahalli and Godrej Woodland at Thiruvaranga. For plots, ask for the layout's completion or site-release papers and the khata for your plot rather than an OC.
- Ready now: Birla Alokya, Encore in the Shire and Sowparnika Ashiyana Phase II, which already show OCs on K-RERA.
What to check before buying ready to move in Hoskote
- OC for your block, and for plotted layouts the site release or completion papers.
- Khata: Hoskote town, gram panchayat and BMRDA-area properties are documented differently; read BMRDA Approved Plots in Hoskote, Bangalore: How to Check Approval.
- Water, sewage and power handover status from the association.
- Commute: the metro does not reach Hoskote yet; route status is in KR Puram to Hoskote Metro Plan (Nov 2026): 11 Stops, Status.
- Area context: Hoskote, Bengaluru: Buyer's Guide 2026 — Prices, Metro, Projects and Risks and, for villas, Villas in Hoskote 2026: Gated Projects and Prices
How do you check an OC on K-RERA?
- Go to rera.karnataka.gov.in → Project Status and search the full registration number.
- Choose ‘View Project Details’ and look for ‘Occupancy certificate received?’ with its date.
- If you are searching by area instead, pick district ‘Bengaluru Rural’ and taluk ‘Hosakote’ to see every registration.
- If the field is missing, ask the builder for the OC copy. Guide: Occupancy Certificate Download Online in Bangalore: Check an OC
More Hoskote and Old Madras Road pages
- Area pages: Hoskote, Bangalore, Old Madras Road, Bangalore, Hoskote, Old Madras Road
- Sowparnika's other Hoskote project: Sowparnika The Native Hoskote: RERA, 1,117 Homes, Sizes 2026
- All new projects: /new-launches