Five K-RERA-registered luxury projects (starting price ₹3 crore or more) in South and Central Bangalore have registered completion dates between 31 December 2026 and 31 December 2028: Brigade Nanda Heights (Padmanabhanagar), Purva Orient Grand (Lalbagh Road), Sattva Springs (Kanakapura Road), Purva Meraki (HSR Layout) and Tata's Promont Phase II (Banashankari 3rd Stage). Starting prices run from about ₹3.49 crore (portal) to ₹9 crore (builder). We did not find an OC for any of them on an official page yet, so these are near-possession homes.

Updated 20 November 2026. We opened each project's K-RERA registration certificate for its completion date, read Puravankara's and Brigade's project pages, and took approx prices from Square Yards (portal) where the builder does not publish one.

Ready to move luxury apartments in South Bangalore: summary table

Luxury here means a starting price of ₹3 crore or more. Ordered by K-RERA completion date. Format: Project — Builder — Area — RERA no. — Configs — Price — K-RERA completion.

  • Brigade Nanda Heights — Brigade Enterprises — Subramanyapura Main Road, Padmanabhanagar — PRM/KA/RERA/1251/310/PR/140622/004982 — 23-floor tower — about ₹3.49 Cr approx (portal) — 31 Dec 2026
  • Purva Orient Grand — Puravankara — Lalbagh Road — PRM/KA/RERA/1251/310/PR/210907/004299 — 3 and 4 BHK, 97 homes — ₹9 Cr onwards (builder) — 30 Jun 2027
  • Sattva Springs — Salarpuria Sattva (Sattva Resi Pvt Ltd) — Kaggalipura, Kanakapura Road — PRM/KA/RERA/1251/310/PR/240724/006948 — about ₹4.69 Cr approx (portal) — 18 Sep 2027
  • Purva Meraki — Puravankara — HSR Layout — PRM/KA/RERA/1251/310/PR/071022/005307 — 3 and 4 BHK, 44 homes — ₹3.90 Cr onwards, indicative (builder) — 31 Oct 2027
  • The Promont Phase II — Tata Housing (promoter Promont Hilltop Pvt Ltd) — Hosakerehalli, Banashankari 3rd Stage — PRM/KA/RERA/1251/310/PR/300724/006953 — 4 BHK low-rise — about ₹4.11 Cr onwards approx (portal) — 31 Dec 2028

Brigade Nanda Heights, Padmanabhanagar

  • RERA no.: PRM/KA/RERA/1251/310/PR/140622/004982, approved 14 June 2022. K-RERA completion date: 31 December 2026.
  • Land on the certificate: Survey 64/1B and 74/2A, Chikkallasandra village, Uttarahalli hobli, Subramanyapura Main Road.
  • Building: a 23-floor tower; Brigade's page puts it '10 minutes from JP Nagar Metro Station' (Green Line).
  • Price: about ₹3.49 crore, about ₹14,800 per sq ft approx (Square Yards, portal). Brigade's page did not show a price or RERA number when we opened it.
  • Our page: Brigade Nanda Heights

Purva Orient Grand, Lalbagh Road

  • RERA no.: PRM/KA/RERA/1251/310/PR/210907/004299, registered 7 September 2021. K-RERA completion date: 30 June 2027; Puravankara's page gives the same possession date.
  • Land on the certificate: Municipal No. 5, Lalbagh Road, Sudhamanagar, Ward 118.
  • Building: one G+24 tower with 97 residences on 1.15 acres; 3 and 4 BHK (Puravankara page). The builder's construction-status file is dated September 2026.
  • Price: ₹9 crore onwards (Puravankara page) — the highest entry price in this list.
  • Metro: Lalbagh Metro Station about 5 minutes and MG Road Metro about 10 minutes, per the builder's page.
  • Our page: Purva Orient Grand

Sattva Springs, Kanakapura Road

  • RERA no.: PRM/KA/RERA/1251/310/PR/240724/006948. K-RERA completion date: 18 September 2027.
  • Land on the certificate: Survey 179, 182/1 and 182/2 of Kaggalipura village, Uttarahalli hobli; promoter Sattva Resi Private Limited.
  • Price: about ₹4.69 crore, about ₹12,999 per sq ft approx (Square Yards, portal, listed under 'Badamanavarthekaval').
  • Our page: Sattva Springs

Purva Meraki, HSR Layout

  • RERA no.: PRM/KA/RERA/1251/310/PR/071022/005307, registered 7 October 2022. K-RERA completion date: 31 October 2027, matching Puravankara's possession date.
  • Land on the certificate: Survey 52/1A, Haralukunte village, Begur hobli — just off Somasundarapalya Main Road, per the builder.
  • Building: one tower of 2 basements + ground + 8 floors, 44 residences on about 1 acre (Puravankara page). 3 BHK homes are 2,519 to 2,770 sq ft; 4 BHK sizes are not published.
  • Price: ₹3.90 crore onwards, marked indicative (Puravankara page). That is about ₹15,500 per sq ft on the smallest 3 BHK (our arithmetic); Square Yards shows about ₹15,856 per sq ft (portal).
  • Travel times on the builder's page: Outer Ring Road 2 minutes, Silk Board Junction 5 minutes, Koramangala 10 minutes.
  • Our page: Purva Meraki

The Promont Phase II, Banashankari 3rd Stage

  • RERA no.: PRM/KA/RERA/1251/310/PR/300724/006953, approved 30 July 2024. K-RERA completion date: 31 December 2028.
  • Land on the certificate: Survey 168 (old Survey 7), Ward 160, Hoskerehalli village, Uttarahalli hobli; promoter Promont Hilltop Private Limited (Tata Housing's project).
  • Homes: 36 low-rise homes in three blocks inside a 14.23-acre site; 4 BHK of about 3,024 to 3,045 sq ft; the listing says the 3 BHK homes are sold out (booknewproperty listing).
  • Price: about ₹4.11 crore onwards for 4 BHK approx (portal listing), about ₹13,600 per sq ft (our arithmetic).
  • Not on our site yet.

South Bangalore luxury possession dates after 2028

Several newer luxury launches in the south are often listed next to the projects above, but their K-RERA dates are 2030 or later:

Metro access for these projects

  • Purva Orient Grand: Lalbagh station (Green Line) about 5 minutes, per Puravankara.
  • Brigade Nanda Heights: JP Nagar station (Green Line) about 10 minutes, per Brigade.
  • Purva Meraki: the builder lists Silk Board Junction at 5 minutes; Central Silk Board is the Yellow Line's interchange with the future Blue Line.
  • The Pink Line's elevated stretch from Kalena Agrahara opened on 14 November 2026; Sobha Magnus is the luxury project closest to that end of the line. See /metro/bengaluru/kalena-agrahara.

How to confirm possession and the OC

  • Search the RERA number on rera.karnataka.gov.in and read the latest quarterly progress report; near completion, the promoter uploads the OC with its closure filing.
  • Ask for the OC issued by the city authority before you take possession. Until then, GST at 5% applies to under-construction homes; after the OC, none.
  • Check the carpet area in the agreement against the K-RERA filing; luxury listings often quote super built-up area.
  • In central Bangalore, confirm the e-khata transfer process and the BESCOM connection on handover.
  • For other completed and near-completion homes, see Ready-to-Move Luxury Homes in Bangalore, Gurgaon and Chennai (2026): No GST, No Waiting and Sobha Indraprastha: Price, Possession, Is It Worth Buying?.