The Kanaka Line, Corridor 4 of the Bengaluru Suburban Rail Project, runs from Heelalige near Chandapura to Rajanukunte beyond Yelahanka, in two sections of 22.5 km (Heelalige–Benniganahalli) and 24.6 km (Benniganahalli–Rajanukunte). K-RIDE's revised timeline for Corridor 4 is June 2029, presented at a citizens' outreach programme (Metro Rail Today, 11 February 2026). The March 2027 date still seen on some pages comes from an older schedule.
Updated 10 November 2026. We reconciled Wikipedia's station table with K-RIDE's timeline as reported, and checked the October 2026 Chandapura girder news. Below: the station list, which station meets which metro line, the girder story set straight, and RERA-registered homes in station localities.
Kanaka Line station list, Heelalige to Rajanukunte
Station — note, in order from the south (Wikipedia's station table). Stations marked 'future' or 'new' are in the table but may not be in the first build:
- Heelalige — southern terminus
- Bommasandra — future station
- Singena Agrahara
- Huskur
- Ambedkar Nagar
- Carmelaram — planned Red Line interchange (Red Line is PROPOSED)
- Bellandur Road
- Marathahalli — a Blue Line metro station of the same name is under construction
- Bagmane — future station
- Doddanekundi — a Blue Line metro station of the same name is under construction
- Kaggadasapura
- Benniganahalli — Purple Line (open) and Mallige Line (under construction)
- Channasandra — Wikipedia marks a Blue Line link in this part of the table
- Horamavu
- Hennur
- Thanisandra
- R.K. Hegde Nagar
- Jakkur — new station
- Yelahanka — planned Sampige Line link
- Muddanahalli — new station
- Rajanukunte — northern terminus
How many stations does the Kanaka Line have: 17, 18 or 21?
All three numbers circulate. Wikipedia's infobox says 17, its table lists 21 names including two future and two new stations, and a Deccan Herald headline speaks of two firms bidding to build 18 stations. The difference is the optional and added stations. For a home decision, use the core list above and ask K-RIDE whether a particular station is in the current tender.
Wikipedia also gives two lengths, 47.74 km in the infobox and 35 km in the lead; K-RIDE's section lengths as reported, 22.5 km plus 24.6 km, add up to 47.1 km (Metro Rail Today).
Kanaka Line opening date: what is official?
- Corridor 4 revised timeline: June 2029 (K-RIDE, as reported by Metro Rail Today, 11 February 2026).
- Whole suburban project: March 2030, with Corridor 2 (Mallige) first at December 2028; four corridors, 148 km, 58 stations (same report).
- Older date still online: March 2027 in Wikipedia's text; the same page's infobox shows June 2029.
- Our status page for all four corridors: Bangalore Suburban Rail Stations: All 4 Lines, 2026 Status.
Are the Chandapura girders part of the Kanaka Line?
No. The two 61-metre open-web girders K-RIDE placed over NH-44 near Chandapura, on 10 and 28 October 2026, belong to the 48 km Baiyappanahalli–Hosur railway doubling project. Each weighs about 245 tonnes, they form Major Bridge No. 470, and K-RIDE has set January 2027 to finish the associated works (PTI via PropNewsTime, 3 November 2026). The doubling runs through the same south-east rail belt as Heelalige, which is why the two are often mixed up.
The four suburban corridors and their revised dates
K-RIDE's revised timeline, as reported by Metro Rail Today on 11 February 2026, covers four corridors, 148 km and 58 stations, with nine-coach air-conditioned trains:
- Corridor 1: Bengaluru City – Yelahanka (17.7 km) and Yelahanka – Devanahalli with the airport extension (29.5 km) — March 2030.
- Corridor 2 (Mallige): Chikkabanavara – Yeshwanthpur (7.4 km) and Yeshwanthpur – Benniganahalli (17.5 km) — December 2028, the first to be completed.
- Corridor 3: Kengeri – Bangalore Cantonment (16.9 km) — March 2030.
- Corridor 4 (Kanaka): Benniganahalli – Rajanukunte (24.6 km) and Heelalige – Benniganahalli (22.5 km) — June 2029.
What to check before you pay near a planned station
- Whether your land or building is in a K-RIDE land notice; our report on the Corridor 4 notice in Horamavu and Doddanekundi: Suburban Rail Corridor 4 Land Notice: Horamavu to Doddanekundi.
- The station's exact site: suburban stations sit on the railway line, and the station name can differ from the locality it serves.
- The project's K-RERA page, for its own completion date, which matters more than the rail date.
Homes in Kanaka Line station localities
Projects in localities named after Kanaka Line stations, on Property Point's listings (prices checked 10 November 2026). We give no distances: station footprints and exits are not published. Project — locality — status — price — K-RERA:
- Embassy Eden (villas) — Rajanukunte, Yelahanka — New Launch — around ₹25 crore — PRM/KA/RERA/1251/472/PR/311225/008368: Embassy Eden
- Shriram Serenity — Rajanukunte — Under Construction — ₹77 lakh–₹1.32 crore — PRM/KA/RERA/1251/309/PR/170924/007026: Shriram Serenity
- Mana Verdant — Jakkur — Under Construction — ₹95 lakh–₹1.39 crore — PRM/KA/RERA/1251/309/PR/260523/005947: Mana Verdant
- Purva Atmosphere — Thanisandra — Under Construction — from ₹2.99 crore — PRM/KA/RERA/1251/472/PR/190204/002350: Purva Atmosphere
- Concorde Sienna — Kannuru, Hennur Road — New Launch — ₹1.25–1.96 crore — PRM/KA/RERA/1251/446/PR/220626/008740: Concorde Sienna
- Sobha Victoria Park — Hennur Road — Under Construction — ₹1.60–1.75 crore — PRM/KA/RERA/1251/309/PR/310322/004800: Sobha Victoria Park
- Century Mirai — Marathahalli — New Launch — from ₹3.12 crore — PRM/KA/RERA/1251/446/PR/181025/008182: Century Mirai
Which fits whom
If you work along the ORR or in Whitefield and live in Hennur, Thanisandra or Yelahanka, the Kanaka Line is the planned rail link between the two belts, but on K-RIDE's revised timeline it is a 2029 story. Buy on today's roads and the metro lines with firmer dates, and treat the suburban station as a later bonus. Station-area hubs: Yelahanka, Bangalore, Hennur Road, Bangalore. The neighbouring Mallige Line: Mallige Line Stations: Kasturi Nagar to Hebbal, Nov 2026.