For plots in Sarjapura, Attibele, Chandapura, Jigani and the Anekal side of Electronic City, ‘BMRDA approved’ normally means approved by the Anekal Planning Authority (APA). The APA is one of the 12 local planning authorities that BMRDA lists. Ask for the APA’s draft layout approval under KTCP Act Section 17 and the release order for your site. Then check the Anekal master plan land use, the conversion, the K-RERA registration and the khata from the local body.
Updated 17 November 2026. We opened the APA website (master plan page updated 24 July 2026), BMRDA’s list of local planning authorities and its Section 17 service procedure, the e-Swathu and e-Aasthi portals, and K-RERA certificates for two registered projects in Anekal taluk.
Is the Anekal Planning Authority the approver for Sarjapur and Attibele?
BMRDA lists the Anekal Planning Authority at Anna Building, No. 430, Hennagara Gate, Hosur Main Road, Bangalore 560099 (phone 080-27836569, anekalplanning80@gmail.com). K-RERA certificates place Sarjapura and Attibele hobli villages in Anekal taluk. Purva Kensho Hills sits in Adigarakallahalli and S. Medahalli villages, Sarjapura hobli. Sobha Manhattan Towers sits in Yadavanahalli village, Attibele hobli.
Taluk and planning area are not always the same thing, though. Some survey numbers near the city edge may sit in another authority’s planning area. Check the APA’s Local Planning Area map or ask the office for your survey number.
What does the APA publish online?
- Master Plan page: one file, ‘39 Proposed Landuse Consolidated.pdf’ (43.5 MB). The page was updated on 24 July 2026 but does not state the plan year or approval order.
- Projects/TP Schemes page: a Change of Land Use (CLU) notification dated 3 May 2025.
- Local Planning Area map, notifications, government orders and a notice board.
- No searchable list of approved layouts. Verification is by order copy and an office check.
How do I check an Anekal layout step by step?
- Step 1: Get the RTC for each survey number and note the village and hobli.
- Step 2: Find the survey number on the APA land-use map and confirm the zone allows residential layouts.
- Step 3: Ask for the APA draft approval order (Section 17(1), (2), (2-A); decided within 90 days under Sakala) and the release order (Section 17(2-B); within 60 days after works are certified).
- Step 4: Check that the release order lists your site number. Ask whether sites were released in one go or in phases.
- Step 5: Ask for the conversion order or the planning authority’s conversion certificate under the 2025 rules.
- Step 6: For layouts over 500 sq m or more than eight plots, open the K-RERA certificate and match the survey numbers.
- Step 7: Pull the Kaveri 2.0 EC and confirm the khata source.
Who issues khata in Sarjapura, Attibele, Chandapura and Jigani?
Khata comes from the local body, not the APA. Areas under an urban local body use the municipal e-khata system, e-Aasthi (Urban Development Department). Gram panchayat villages use e-Swathu 2.0 (RDPR). Since 2025, an RDPR rule reported by The Realty Today says a panchayat should not issue a PID for building sites in a layout that does not have prior planning-authority approval.
Local-body boundaries in Anekal taluk have been changing. Our report on panchayats proposed for the Greater Bengaluru area is Anekal, Jigani, Attibele Into Greater Bengaluru? October 2026, and water jurisdiction is in BWSSB New Areas 2026: Sarjapur, Anekal, Jigani Water Explained.
Which RERA-registered projects in Anekal taluk can I compare?
- Purva Kensho Hills (plotted development): PRM/KA/RERA/1251/308/PR/210324/006719, Adigarakallahalli and S. Medahalli villages, Sarjapura hobli, Anekal taluk; certificate completion date 30 June 2028. A broker listing shows 700 plots on 71 acres. See Purva Kensho Hills.
- Sobha Manhattan Towers – Town Park Phase 2 (apartments): PRM/KA/RERA/1251/308/PR/210518/004151, Yadavanahalli village, Attibele hobli, Anekal taluk; completion date 30 September 2028. See Sobha Manhattan.
- Area hubs: Sarjapur, Bangalore, Attibele, Bangalore, Chandapura, Bangalore and Attibele.
- For a price-led list of Sarjapur layouts, see our separate post Plots in Sarjapur Road 2026: Gated Layouts and Prices.
What infrastructure is planned around Anekal taluk?
- Satellite Town Ring Road: Sarjapura, Attibele and Anekal are among the 12 towns on the 280.8 km alignment. The 20.9 km package from the Tamil Nadu border to Hoskote was at contract stage when the tracker was last updated (7 September 2024).
- Metro: Attibele and Sarjapur lines are proposals only. See Jigani–Attibele–Sarjapur Metro: Proposed 69 km Line (2026).
How is ‘APA approved’ different from ‘RERA approved’ in Sarjapur ads?
Ads often join these words together, but they are separate things from separate offices. Keep a copy of each.
- APA approval: the planning authority sanctions the layout plan (Section 17 draft approval) and later releases sites (Section 17(2-B)). It decides whether the land can be a layout at all.
- RERA registration: K-RERA registers the promoter’s project and its disclosures (land, approvals, completion date). It does not replace the APA approval. RERA asks for it.
- Conversion: the land must be converted for non-agricultural use, through the planning authority under the 2025 rules where the master plan zone fits.
- Khata: the local body records your individual site after the layout is approved. It is the last link, not the first.
- Bank loan: lenders usually ask for all of the above. If a bank declines a layout, ask which document it found missing.



