In Nelamangala, layouts sold as ‘BMRDA approved’ are approved by the Nelamangala Planning Authority (NPA), which BMRDA lists among its 12 local planning authorities. Unlike most planning authorities around Bengaluru, the NPA publishes downloadable lists: an Approved Layout List for 2001–2023 and an Approved Single Plot Layout List for 2007–2023. Find your layout in the right list, then check its release order, conversion, khata and, for bigger layouts, its Karnataka RERA registration.

Updated 17 November 2026. We opened the NPA’s layout list page (last updated 8 July 2024), BMRDA’s Local Planning Areas page, BMRDA’s Section 17 service procedure, the e-Swathu portal and the K-RERA certificate of a registered plotted layout near Nelamangala toll.

Which authority approves layouts in Nelamangala?

BMRDA lists the Nelamangala Planning Authority at 2nd Main Road, Sadashivanagar, Nelamangala Town 562123, Bengaluru Rural district (phone 080-27726222, nelamangala.pa@gmail.com). BMRDA’s procedure sheet says the authority approves draft layouts under Section 17(1), (2) and (2-A) of the KTCP Act within 90 days. It then approves the final layout and release of sites under Section 17(2-B) within 60 days, once the works are certified.

Where is the Nelamangala approved layout list, and what does it cover?

The NPA’s ‘Layout List Approved’ page (nelamangala.tpa.gov.in/en/tec-opi-layout-appr) has two downloads:

  • Approved Layout List: 2001–2023.
  • Approved Single Plot Layout List: 2007–2023.
  • Page last updated: 8 July 2024. A layout approved in 2024 or later will not be in these files. For those, ask for the order copy and confirm it at the NPA office.
  • A single-plot approval covers one plot of land, not a multi-site layout. A seller offering many sites under a single-plot approval should explain why.

What is the buyer checklist for a Nelamangala plot?

  • Approval: the layout name or survey number appears in the NPA list, or you hold a certified copy of the draft approval order.
  • Release: a final layout or release order under Section 17(2-B) covers your site number. Draft approval alone does not.
  • Conversion: a conversion order or certificate for every survey number. Under the 2025 amendment rules (notification RD-LGP/6/2025, 17 September 2025), conversion in an approved master-plan zone runs through the planning authority.
  • Khata: for gram panchayat sites, the e-Swathu record (Form 9 search and registration-eligibility check). We explain the forms in Form 11A Meaning: e-Swathu 11A vs 11B Khata (Nov 2026).
  • RERA: if the land is over 500 sq m or the project has more than eight plots, a K-RERA certificate that names the same survey numbers.
  • EC: Kaveri 2.0 encumbrance certificate covering at least the years since the layout order.
  • Guidance value: compare the stamp-duty value at Bangalore guidance values.

What does a registered plotted layout near Nelamangala look like on K-RERA?

Sattva Green Groves is a plotted layout near Nelamangala toll, off Tumkur Road. Its K-RERA certificate (PRM/KA/RERA/1250/307/PR/040524/006863) names survey numbers in Gangadharapalya village and one in Basavanahalli village, Kasaba hobli, Nelamangala, Bengaluru Rural, with a completion date of 17 September 2026. Our project page lists 735 plots. See Sattva Green Groves and compare survey numbers the same way for any layout you shortlist.

What Tumkur Road infrastructure is confirmed?

  • Namma Metro Green Line: the Nagasandra–Madavara extension (3.14 km; Chikkabidarakallu, Manjunath Nagar and Madavara stations) opened on 7 November 2024. Madavara is the north-western terminus.
  • Satellite Town Ring Road: the Phase 1 package from Obalapura (Nelamangala taluk) to Somakkanamutta (Magadi taluk), 46.3 km, had bids re-invited in September 2024 (STRR tracker). It was not open when last reported.
  • Second airport: no site was confirmed in any official source we opened today. Reported shortlists are in Second Airport Bangalore Location: Harohalli vs Nelamangala 2026.
  • Closer to the city: Yeshwanthpur, Bangalore and Brigade Lumina.

What mismatches should make a Nelamangala buyer pause?

Most problems show up as a mismatch between two documents. None of these proves wrongdoing, but each needs a written answer before you pay an advance.

  • The layout is in the single-plot list, but the seller is selling many sites. A single-plot approval is for one plot.
  • The approval order covers different survey numbers from the sale deed schedule, or covers only part of the land.
  • There is a draft approval but no release order, or the release order lists phases and your site is not in the released phase.
  • The K-RERA certificate names a different promoter, different survey numbers or a different village from the brochure.
  • The khata shows a property number but the e-Swathu record cannot be found, or the registration-eligibility check fails.
  • The order date falls after July 2024 and the seller cannot give a certified copy. In that case, ask the NPA office directly.

Is a ‘BMRDA approved, NPA approved, RERA certified’ listing enough?

No. Those are three different documents and a listing is none of them. Ask for the order numbers and match the survey numbers yourself. Our wider explainer on approvals is BDA vs BMRDA vs BIAAPA Approved Layouts: Which Authority Governs Your Plot?, and area context is in Nelamangala, Bengaluru: Buyer's Guide 2026 — Prices, Metro, Projects and Risks. For price context across Bengaluru, see Bangalore.