On Magadi Road, the approver changes as you leave the city. Inside, properties carry city municipal numbers and PIDs. Out at Tavarekere and beyond, layouts can be approved by the Magadi Planning Authority (MPA), one of the 12 local planning authorities BMRDA lists. A ‘BMRDA approved site’ there should come with an MPA layout order (an ‘MPA/LAO’ reference) and a release order covering your site. Check both before paying.
Updated 17 November 2026. We opened BMRDA’s list of planning authorities and its Section 17 procedure, the K-RERA certificate and a portal record for a completed Tavarekere layout, the K-RERA certificate for a Magadi Road city project, and the Phase 3 metro approval report.
Which authority covers which stretch of Magadi Road?
Use this as a starting point, then confirm your own survey number.
- City stretch (Rajajinagar, Vijayanagar side): city corporation records. Purva Blubelle’s K-RERA certificate shows Municipal No. 74, PID 32-1-74, Ward 32 (new Ward 122), Kempapura Agrahara, Bengaluru South. Khata: city e-khata (e-Khata guide, Bangalore).
- Tavarekere hobli (Bengaluru South taluk): Banyan Tree, a 96-plot layout in Tavarekere village, carries Magadi Planning Authority approval MPA/LAO/08/2023-24, dated 14 August 2024. So a Bengaluru South taluk village can sit in the MPA’s planning area.
- Magadi town and taluk: Magadi Planning Authority, Government Complex, 2nd Floor, Thirumale Road, Magadi 562120 (080-27746981, mpa.magadi@gmail.com).
- Seegehalli and villages between NICE Road and Tavarekere: we found no official source today confirming the authority. Ask the MPA and the BDA in writing for your survey number.
What does a complete approval trail look like? A Tavarekere example
- Draft layout approval: MPA/LAO/08/2023-24, 14 August 2024 (Square Yards RERA record, portal source).
- Final release: a 100% final release order dated 19 August 2025 covering all 96 sites, as reported by a PropNewz review. Under KTCP Section 17(2-B), release follows completion NOCs for roads, water, power and parks.
- K-RERA: PRM/KA/RERA/1251/310/PR/110926/008939, survey numbers 132/2 and 132/3, Tavarekere village, Tavarekere hobli, Bangalore South taluk.
- What to copy for your own layout: the order number, its date, the survey numbers, and the site numbers in the release schedule.
How do I check a Magadi Road site before paying?
- Step 1: Get the RTC and confirm the village, hobli and taluk.
- Step 2: Ask for the draft approval order (KTCP Section 17(1), (2), (2-A); 90-day Sakala limit) and the release order (Section 17(2-B); 60 days).
- Step 3: Check the release covers your site. Some layouts are released in stages.
- Step 4: Confirm conversion. Under the 2025 rules, conversion in an approved master-plan zone is handled by the planning authority.
- Step 5: Open the K-RERA certificate for layouts above 500 sq m or eight plots.
- Step 6: For panchayat villages, check the e-Swathu record. Compare the stamp-duty value at Bangalore guidance values.
What is confirmed about the Magadi Road metro?
The Union Cabinet approved Namma Metro Phase 3 in August 2024. Corridor 2 runs from Hosahalli to Kadabagere along Magadi Road: 12.50 km with 9 stations. Corridor 1 is JP Nagar 4th Phase to Kempapura (32.15 km). Construction World (20 August 2024) put the total cost at ₹156.11 billion and the completion target at 2029. All of our metro coverage is at /metro/bengaluru.
Satellite Town Ring Road: the Phase 1 packages from Obalapura (Nelamangala) to Somakkanamutta (Magadi), 46.3 km, and on to Kunigal, 32.7 km, had bids re-invited in September 2024, according to the STRR tracker.
Where can I compare registered projects on Magadi Road?
- Purva Blubelle (apartments, Magadi Main Road): PRM/KA/RERA/1251/310/PR/290323/005829. See Purva Blubelle.
- Birla Tisya (Magadi Road, Rajajinagar): Birla Tisya.
- Nearby hubs: Vijayanagar, Bangalore and Nagarbhavi, Bangalore. Area guide: Magadi Road, Bengaluru: Buyer's Guide 2026 — Prices, Metro, Projects and Risks.
What should I ask a Magadi Road site seller?
- What are the MPA (or other authority’s) layout order number and date? Please share a certified copy.
- Is there a release order, is it 100% or phased, and does it list my site number?
- Which survey numbers does the order cover, and do they match my sale deed schedule?
- Which village and taluk does the RTC show? A Bengaluru South taluk village can still be in the MPA’s planning area, as Tavarekere shows.
- Is the layout on K-RERA? Which certificate number?
- Who issues the khata (city corporation, town body or gram panchayat), and is the record online?
- Where the layout sits close to the city edge, has the authority confirmed in writing that the survey number was in its area on the order date?