Updated 27 October 2026. Only two reports cover the pilot, and both are short. This guide sets out what is confirmed, what is not, why metering matters in a city with a supply gap, and what Sector 45 residents and buyers elsewhere should ask.

What has MCG announced?

  • Where: Sector 45, Gurugram, as a pilot ahead of any wider rollout (The Tribune; PropNewsTime).
  • What: supply and installation of ultrasonic smart water meters for domestic consumers, plus handheld data-collection units (The Tribune).
  • When: installation window of 15 October to 14 December 2026 under the work order (The Tribune; PropNewsTime). Both reports also say meters have been installed, so work appears to be under way within that window.
  • Why: MCG Commissioner Pradeep Dahiya described it as a significant step towards technical improvements in the water supply system and said the corporation wants to measure consumption more systematically through modern metering (The Tribune; PropNewsTime).

What is an ultrasonic water meter?

An ultrasonic meter measures flow using sound waves rather than a spinning mechanical part, so it can give readings without some of the moving components of a conventional meter (PropNewsTime). The handheld units in the work order suggest readings will be collected by staff walking past homes rather than sent automatically over a network, though MCG has not said so explicitly.

What is not known yet

Anyone claiming that smart meters are coming to a particular sector on a fixed date, or that bills will rise or fall by a set amount, is going beyond what MCG has said.

  • Number of meters in the pilot and the contract value: not disclosed (PropNewsTime).
  • Billing: neither report says whether bills will change, whether the tariff will change or when the new readings will be used for billing.
  • Who pays for the meter: not stated.
  • Rollout: the pilot could inform a wider rollout, but any expansion depends on later decisions by the corporation (PropNewsTime).

Why metering matters in Gurugram

Gurugram's water problem is supply, not just measurement. A June 2026 Newslaundry report cited GMDA treatment capacity of 670 MLD against projected demand of 874.3 MLD and groundwater extraction at 326.52% of natural replenishment, and listed tail-end areas with chronic shortfalls including Sectors 21, 22, 23, 54, 55, 57, 59, 63, 63A, 70 and 95 (Newslaundry, 24 June 2026). Accurate meters do not add water, but they show where it goes, which is the starting point for fair billing and for finding leaks and unbilled connections.

Roles are split. GMDA runs bulk treatment and the trunk network, while municipal bodies such as MCG handle local distribution within their limits; in practice the boundary can blur (our earlier guide, drawing on Tribune reporting). Sector 45 is an MCG-served sector, which is why MCG is running this pilot.

If you live in Sector 45

  • Note your old meter's final reading and keep a photo with the date when the new meter is fitted.
  • Ask the installation team or MCG ward office for the new meter's serial number and whether your consumer account has been updated.
  • Compare the first two bills after installation with the same months last year; raise any jump in writing with MCG.
  • Check for leaks inside the home: a meter that measures accurately will also record water lost to a running cistern or dripping tank valve.

If you are buying a home in Gurugram

Metering is a small signal; supply reliability is the big one. Before you buy, in Sector 45 or anywhere else:

  • Ask the seller or RWA which agency supplies the property, MCG or GMDA, and for the last year of water bills.
  • Ask how many hours a day water arrives and what the society or household spent on tankers last summer.
  • For independent floors, check whether each floor has its own meter and connection, or whether one connection is shared.
  • Visit in May or June if you can, when shortfalls show.

Homes and guides on Property Point