Jigani hobli has seven K-RERA-registered housing projects (plus one plotted layout). Six have completion dates still ahead, from 31 January 2028 (Skyline Haven) to 28 October 2031 (Sattva Amritya, registered on 30 October 2026). 1 BHKs are available in new projects: at Sattva Amritya, NoBroker listings ask about ₹71 lakh for a 650 sq ft 1 BHK (approx, portal). Resale 2 BHKs in older Jigani complexes ask ₹45–90 lakh, about ₹4,300–9,500 per sq ft (approx, portal). The nearest metro is the Yellow Line terminal at Delta Electronics Bommasandra, about 8.8 km by road from Jigani.
Updated 20 November 2026. We opened the K-RERA registration certificate of every project named and used its village as K-RERA records it. We also read NoBroker's Jigani listings, the Yellow Line page and the DOSL Jigani page, and measured road distances with OSRM. Progress and plan-approval details come from the K-RERA project pages (Q2 2026-27 reports filed 14–15 October 2026).
Which RERA projects are in Jigani? (summary table)
Project — promoter — K-RERA village (all Jigani hobli, Anekal taluk) — K-RERA no. — K-RERA completion. Ordered by completion date.
- Skyline Haven — SV Infra Homes — Bandenallasandra — PRM/KA/RERA/1251/308/PR/270924/007096 — 31 January 2028
- Aiikya Forestscape — Swagatham Constructions — Vadera Manchanahalli — PRM/KA/RERA/1251/308/PR/031025/008136 — 30 September 2028
- Prestige Suncrest — Prestige Estates Projects — Tirupalya (560099) — PRM/KA/RERA/1251/308/PR/170225/007512 — 30 September 2028; 21% built (Q2 2026-27)
- Skyline Haven-2 — SV Infra Homes — Jigani village — PRM/KA/RERA/1251/308/PR/061026/008994 — 30 August 2029
- DS Max Sky Stanza — DS Max Properties — Haragadde — PRM/KA/RERA/1251/308/PR/281125/008287 — 31 October 2030
- Sattva Amritya — Sattva Resi — Jigani village (560105) — PRM/KA/RERA/1251/308/PR/301026/009061 — 28 October 2031
- Sreenidhi E-City — Sreenidhi Developers — Maragondanahalli, near Shikaripalya — PRM/KA/RERA/1251/308/PR/091123/006402 — registered 9 November 2023; check the latest quarterly report
Sattva Amritya, Jigani Main Road: the newest launch
K-RERA no. PRM/KA/RERA/1251/308/PR/301026/009061. The certificate shows an acknowledgement dated 19 October 2026, project approval on 30 October 2026 and a completion date of 28 October 2031. The address is Survey Nos. 271/1, 275/3 and others, Jigani village, Jigani hobli, Anekal taluk, PIN 560105.
A listing gives about 432 homes in three 31-floor towers on about 6.3 acres, in 1, 2, 2.5 and 3 BHK, from about ₹71 lakh to ₹1.91 crore or more (approx, portal). NoBroker listings under its earlier name, ‘Codename Jigani’, show a 650 sq ft 1 BHK at ₹71 lakh and a 1,400 sq ft 2 BHK at ₹1.52 crore, both about ₹10,900 per sq ft (approx, portal). That same listing names Cheemasandra village, but K-RERA says Jigani village, so use the certificate's survey numbers on your agreement. More detail: Sattva Amritya Jigani: RERA, 432 Homes, 1–3 BHK, 2031.
Prestige Suncrest, Tirupalya (Jigani–Anekal Road)
K-RERA no. PRM/KA/RERA/1251/308/PR/170225/007512, approved 17 February 2025, promoter Prestige Estates Projects Ltd. Address: Sy. Nos. 30/24B and others, Tirupalya village, Jigani hobli, PIN 560099. K-RERA lists 437 homes: 49 one-bed (40.1 sq m carpet, about 432 sq ft), 96 two-bed (66.2 sq m, about 713 sq ft) and 292 three-bed (91.8 sq m, about 988 sq ft). The Q2 2026-27 report, filed 14 October 2026, shows 21% built against a K-RERA completion date of 30 September 2028. Its building plan approval on K-RERA is from the BDA. Our page: Prestige Suncrest.
Other registered projects: Skyline Haven, DS Max Sky Stanza, Aiikya Forestscape
Skyline Haven, Bandenallasandra (PRM/KA/RERA/1251/308/PR/270924/007096), was approved on 27 September 2024 with a K-RERA completion date of 31 January 2028. Its second phase, Skyline Haven-2, is in Jigani village (PRM/KA/RERA/1251/308/PR/061026/008994). It was approved on 6 October 2026 and is due 30 August 2029. Phase-2 detail: SV Skyline Haven 2, Jigani: Price, RERA, Sizes, 2029.
DS Max Sky Stanza, Haragadde village (PRM/KA/RERA/1251/308/PR/281125/008287), was approved on 28 November 2025 and is due 31 October 2030.
Aiikya Forestscape, Vadera Manchanahalli (PRM/KA/RERA/1251/308/PR/031025/008136), was approved on 3 October 2025 and is due 30 September 2028. Confirm the unit type on its K-RERA page, as it is a low-rise project.
Sreenidhi E-City, Maragondanahalli near Shikaripalya (PRM/KA/RERA/1251/308/PR/091123/006402), is registered; read its latest quarterly report on K-RERA before booking.
Want a plot rather than a flat? Prestige King's County (PRM/KA/RERA/1251/308/PR/290624/006936) is a registered layout across Jigani and Rajapura villages. Its Q2 2026-27 report, filed 15 October 2026, shows 73% progress. See Prestige Kings County.
1 BHK and 2 BHK flats in Jigani: what budget do you need?
1 BHK: the new supply is at Sattva Amritya (listed at about ₹71 lakh for 650 sq ft, approx, portal) and Prestige Suncrest, which has 49 one-bed units of about 432 sq ft carpet with no price on a page we could open. Older resale 1 BHKs are rare on the portals.
2 BHK: NoBroker's Jigani page opened today showed resale 2 BHKs of 920–1,100 sq ft at ₹45–62 lakh (about ₹4,300–6,700 per sq ft), and newer 2 BHKs of about 940 sq ft at ₹80–90 lakh (about ₹8,500–9,500 per sq ft). All approx (portal). The same page mixed in a Jayanagar flat, so filter by locality.
Worked example: a 940 sq ft resale 2 BHK at ₹5,000 per sq ft is ₹47 lakh. The same size at the Amritya listing rate of about ₹10,900 per sq ft would be about ₹1.02 crore. New and resale here are close to two separate markets.
Jigani possession dates: when each project is due
K-RERA completion dates by year, earliest first. These are the legal dates in each registration; a builder's marketing date can be earlier. For an under-construction flat, the K-RERA date is the one your agreement should carry.
- 2028: Skyline Haven (31 January), Aiikya Forestscape (30 September), Prestige Suncrest (30 September; 21% built at Q2 2026-27)
- 2029: Skyline Haven-2 (30 August)
- 2030: DS Max Sky Stanza (31 October)
- 2031: Sattva Amritya (28 October)
- If you need to move in within a year, look at resale in completed Jigani complexes or at completed projects nearer Electronic City: Electronic City, Bangalore.
How to check a Jigani project on K-RERA before you pay
Names vary across listings in Jigani. Sattva Amritya also appears on portals as ‘Codename Jigani’, and two names that ranking portals show for Jigani could not be matched to any K-RERA registration in Jigani hobli, so we left them out. Some older complexes on the resale lists predate the register. Run these checks on any listing:
- Search the project or promoter on rera.karnataka.gov.in and download the registration certificate (URL format: rera.karnataka.gov.in/certificate?CER_NO=<number>).
- Match the village and survey numbers on the certificate to the sale agreement. Amritya's listing says Cheemasandra; K-RERA says Jigani village.
- Open the latest quarterly progress report and the plan-approval number on the project page.
- Pay booking money only to the project's RERA-designated account named in the agreement, never to a channel partner.
- For a resale flat, ask for the occupancy certificate, the e-khata and the latest tax receipt from the local body.
- Full walkthrough: How to Check RERA Registration in Karnataka: 7 Steps
How far is Jigani from the Yellow Line metro?
The Yellow Line opened on 10 August 2025 from RV Road to Delta Electronics Bommasandra, its southern terminal. Biocon Hebbagodi is the station before it. Jigani has no station; proposals for lines toward Jigani and Attibele are covered in Jigani–Attibele–Sarjapur Metro: Proposed 69 km Line (2026) and Bommasandra–Attibele Metro: Proposed 11 km Yellow Line Link.
- Jigani (OpenStreetMap point) → Delta Electronics Bommasandra: 8.8 km by road
- Jigani → Biocon Hebbagodi: 8.7 km
- Prestige Suncrest → Delta Electronics Bommasandra: 3.5 km
- Prestige Suncrest → Biocon Hebbagodi: 3.6 km
Khata and plan approvals in Jigani: what is different?
Jigani sits in Anekal taluk, outside the Greater Bengaluru city corporations. OpenStreetMap places Uttarahalli and Begur under the Bengaluru South City Corporation, but Jigani only under Anekal. Property tax and e-khata therefore come from the local urban body, not the GBA. Read E-Khata in Jigani, Anekal, Attibele, Chandapura (Bangalore) before you compare documents, and Anekal, Jigani, Attibele Into Greater Bengaluru? October 2026 on the reported proposal to add the area to Greater Bengaluru.
Plan approvals also differ. On K-RERA, Prestige King's County lists a Local Planning Authority approval (LAO/158/22-23), while Prestige Suncrest lists a BDA approval. Ask which authority sanctioned your building, and check that the sanction number on the K-RERA page matches the one in your agreement. Area background: Jigani, Bengaluru: Buyer's Guide 2026 — Prices, Industrial Belt, Projects and Risks and Anekal, Bengaluru: Buyer's Guide 2026 — Prices, Connectivity, Schools and Risks.





