If you want a new flat in JP Nagar, nearly all registered supply sits in the 7th Phase (Puttenahalli, Kothanur, Sarakki) and on the 9th Phase side around Anjanapura and Gollahalli. We checked nine K-RERA-registered projects there. Five are under construction, with K-RERA completion dates from 31 December 2026 (KK Luxura) to 31 December 2029 (Sattva Forest Ridge). Two are complete with an occupancy certificate. Phases 1 to 6 are mostly resale, where NoBroker listings opened today ask about ₹12,300–₹13,400 per sq ft (approx, portal).

Updated 20 November 2026. We opened the K-RERA registration certificate of every project named here and copied the address exactly as K-RERA records it. We also read the NoBroker JP Nagar listing page and the Wikipedia pages for the Green and Pink lines, and measured road distances from project pins to metro stations with OSRM. Prices for new projects appear only where the project is registered and a dated source exists.

Which RERA-registered projects are in JP Nagar? (summary table)

Project — promoter — K-RERA address — K-RERA no. — K-RERA completion or status. Ordered by phase, then by completion date.

  • KK Luxura — KK Buildcon — Kothanur Dinne Main Road, J.P. Nagar 7th Phase — PRM/KA/RERA/1251/310/PR/050924/006994 — 31 December 2026
  • Adarsh Lake Reserva Phase 1 — Adarsh Developers — Puttenahalli village, Uttarahalli hobli (560076) — PRM/KA/RERA/1251/310/PR/200123/005639 — 31 December 2027
  • Celestium — Vainavi Infrastructures — Puttenahalli Road, J P Nagar 7th Phase — PRM/KA/RERA/1251/310/PR/180424/006789 — 16 December 2028
  • Mahaveer Rarus — Reddy Structures — Sarakki Kere, Puttenahalli, J P Nagar 7th Phase — PRM/KA/RERA/1251/310/PR/220817/005160 — registered 17 August 2022; check the latest quarterly report
  • Adarsh Stratuss Phase 1 — Adarsh Developers — Sarakki Kere village, Ward 187 (560078) — PRM/KA/RERA/1251/310/PR/200305/003328 — registered 5 March 2020; check the latest quarterly report
  • Learning To Fly — Total Environment — 17th Cross, 29th Main, J P Nagar 7th Phase — PRM/KA/RERA/1251/310/PR/171014/000270 — completed; occupancy certificate 5 December 2023
  • Purva Coronation Square — Puravankara — Kothnur village, Ward 195 — PRM/KA/RERA/1251/310/PR/170916/000235 — completed; occupancy certificate 4 January 2020
  • Bhoomika Heritage — B M R Projects — Gollahalli village, Uttarahalli hobli (560062) — PRM/KA/RERA/1251/310/PR/110823/006149 — 31 December 2027
  • Sattva Forest Ridge — Sattva Resi — Anjanapura village, Anjanapura 80 Feet Road, Ward 196 (560062) — PRM/KA/RERA/1251/310/PR/241224/007315 — 31 December 2029; 18% built (Q2 2026-27)

JP Nagar phase by phase: where is new supply and where is it resale only?

JP Nagar's phases were laid out as BDA layouts in stages, so the older phases are built out. New K-RERA registrations cluster where land was still free: the 7th Phase pockets near Puttenahalli lake, Kothanur and Sarakki, and the 9th Phase edge toward Anjanapura. Use this map before you open a portal.

  • 1st to 4th Phase: resale only in our check. No current K-RERA registration with these phases in its certificate address. Expect older apartments and independent floors.
  • 5th and 6th Phase: mostly resale. Adarsh Stratuss Phase 1 sits at Sarakki Kere village (PIN 560078), on the 6th–7th Phase side.
  • 7th Phase: the main new-supply pocket. KK Luxura, Celestium, Mahaveer Rarus, Learning To Fly and Adarsh Lake Reserva (Puttenahalli) are here, with Purva Coronation Square at Kothnur.
  • 8th Phase: no certificate in our check names the 8th Phase. Portal ‘8th Phase’ listings are mostly resale.
  • 9th Phase and Anjanapura: Sattva Forest Ridge (Anjanapura village) and Bhoomika Heritage (Gollahalli village), both PIN 560062. Builders market this belt as ‘JP Nagar 9th Phase’; K-RERA records the revenue village.

Under-construction projects in JP Nagar: RERA numbers and completion dates

KK Luxura, J.P. Nagar 7th Phase. K-RERA no. PRM/KA/RERA/1251/310/PR/050924/006994, approved 5 September 2024. The certificate address is Kothanur village, Kothanur Dinne Main Road, behind the Ganesha temple. K-RERA completion date: 31 December 2026, the nearest of the group.

Celestium, J P Nagar 7th Phase. K-RERA no. PRM/KA/RERA/1251/310/PR/180424/006789, approved 18 April 2024, promoter Vainavi Infrastructures. The address is Survey No. 4/A2, Puttenahalli Road. K-RERA completion date: 16 December 2028.

Adarsh Lake Reserva Phase 1, Puttenahalli. K-RERA no. PRM/KA/RERA/1251/310/PR/200123/005639, approved 20 January 2023. The address is Puttenahalli village, Uttarahalli hobli, PIN 560076. K-RERA completion date: 31 December 2027.

Bhoomika Heritage, Gollahalli. K-RERA no. PRM/KA/RERA/1251/310/PR/110823/006149, approved 11 August 2023, promoter B M R Projects. Address: Site No. 114, Gollahalli village, PIN 560062. K-RERA completion date: 31 December 2027.

Sattva Forest Ridge, JP Nagar 9th Phase (Anjanapura). K-RERA no. PRM/KA/RERA/1251/310/PR/241224/007315, approved 24 December 2024. K-RERA lists 407 flats: 56 one-BHK (44.1 sq m carpet, about 475 sq ft), 111 two-BHK (72 sq m, about 775 sq ft), 2 two-and-a-half-BHK and 238 three-BHK (104.7 sq m, about 1,127 sq ft). The Q2 2026-27 progress report, filed 15 October 2026, shows 18% built against a K-RERA completion date of 31 December 2029. Our page: Sattva Forest Ridge.

Mahaveer Rarus (Sarakki Kere, 7th Phase, PRM/KA/RERA/1251/310/PR/220817/005160) and Adarsh Stratuss Phase 1 (Sarakki Kere village, PRM/KA/RERA/1251/310/PR/200305/003328) are both registered. Before booking a unit in either, read the latest quarterly progress report on K-RERA.

JP Nagar possession dates by year

K-RERA completion dates for the JP Nagar projects with a date still ahead, earliest first. Your agreement should carry the K-RERA date.

  • 2026: KK Luxura, 7th Phase (31 December)
  • 2027: Adarsh Lake Reserva Phase 1, Puttenahalli (31 December) and Bhoomika Heritage, Gollahalli (31 December)
  • 2028: Celestium, 7th Phase (16 December)
  • 2029: Sattva Forest Ridge, Anjanapura (31 December; 18% built at Q2 2026-27)
  • Ready now: Purva Coronation Square and Learning To Fly (occupancy certificates on record), and resale across Phases 1–8

Completed projects in JP Nagar with occupancy certificates

Two registered projects in the 7th Phase have an occupancy certificate on record, so any unit you buy there today is a resale.

Purva Coronation Square (Puravankara), K-RERA no. PRM/KA/RERA/1251/310/PR/170916/000235. The certificate address is Survey No. 102, Ward 195, Kothnur village, Uttarahalli hobli. First occupancy certificate: 4 January 2020. Our page: Purva Coronation Square.

Learning To Fly (Total Environment), K-RERA no. PRM/KA/RERA/1251/310/PR/171014/000270. Address: 17th Cross, 29th Main Road, J P Nagar 7th Phase. First occupancy certificate: 5 December 2023. Our page: Total Environment Learning To Fly.

For any resale flat, ask for the occupancy certificate, the e-khata in the seller's name and the society's no-dues letter. Our explainer on khata types: A-Khata, B-Khata and e-Khata in Bengaluru (2026): What a Buyer Must Check Now.

Can you buy a flat in JP Nagar under 50 lakhs?

Rarely, and only as a small resale unit. On NoBroker's JP Nagar page opened today, JP Nagar listings asked ₹1.99 crore for a 1,490 sq ft 2 BHK in the 3rd Phase (₹13,356 per sq ft) and ₹1.85 crore for a 1,500 sq ft 3 BHK (₹12,333 per sq ft), approx (portal). Another 2 BHK in JP Nagar was listed at ₹80 lakh for 1,200 sq ft (₹6,667 per sq ft).

Worked example: at ₹6,667 per sq ft, ₹50 lakh buys about 750 sq ft of built-up area. At ₹12,333 per sq ft it buys about 405 sq ft. That is a compact 1 BHK in an older building, not a 2 BHK in a new project. Stamp duty and registration add to that price.

The smallest new units we found are the 1 BHKs at Sattva Forest Ridge (about 475 sq ft carpet). The builder publishes no price, so we do not quote one. If your budget is firmly ₹50 lakh, our citywide guide shows what that buys and where: Flats in Bangalore under ₹50 Lakh and ₹75 Lakh (2026): What You Can Actually Buy, and Where.

How far are JP Nagar projects from the metro?

JP Nagar now touches three metro lines. The Green Line's Jaya Prakash Nagar and Yelachenahalli stations run along Kanakapura Road. The Pink Line's elevated stretch from Kalena Agrahara to S.G. Palya opened on 14 November 2026 with six stations, including N.S. Palya–JP Nagar 4th Phase on Bannerghatta Road. Wikipedia lists the Orange Line as approved, with interchanges at JP Nagar 4th Phase and at Jaya Prakash Nagar.

  • Purva Coronation Square → Yelachenahalli (Green): 2.8 km by road, about 33 minutes on foot
  • Purva Coronation Square → Jaya Prakash Nagar (Green): 2.9 km
  • Purva Coronation Square → N.S. Palya–JP Nagar 4th Phase (Pink): 3.6 km
  • Sattva Forest Ridge → Konanakunte Cross (Green): 3.9 km
  • Sattva Forest Ridge → Vajarahalli (Green): 4.1 km
  • Interchange details: JP Nagar 4th Phase Metro Bangalore: Pink Open, Orange Line Status

Address check: projects listed under JP Nagar that K-RERA places elsewhere

Portal searches for JP Nagar pull in projects from other areas. NoBroker's JP Nagar page opened today mixed BTM Layout, Varthur and Nagarbhavi listings into the JP Nagar results. Mythri Sapphire, which a ranking page lists under JP Nagar, has K-RERA no. PRM/KA/RERA/1251/446/PR/210323/004065. Its certificate gives the address as Chikkanayakanahalli, Varthur hobli, Bengaluru East. Always open the certificate and match the survey number and village to the sale agreement.

To check any project: open rera.karnataka.gov.in, search the project or promoter, open the registration certificate, and compare the address, promoter name and completion date with what the sales team gives you. Step-by-step guide: How to Check RERA Registration in Karnataka: 7 Steps. Locality context: JP Nagar Phases 1 to 9 Explained: Bangalore Buyer Guide, Jp Nagar, Bangalore and Jp Nagar.