Yes, you need permission before drilling a borewell in Bengaluru. BWSSB made prior permission compulsory from 15 March 2024, under the Karnataka Ground Water (Regulation and Control of Development and Management) Act, 2011. Owners of individual houses within the city limit apply on BWSSB's online ground-water portal, which has a 60-day service limit. Apartments, commercial and industrial premises apply to the Karnataka Ground Water Authority. Drilling without permission can bring legal action under the Act.

Updated 18 November 2026. We opened BWSSB's borewell permission portal, the March 2024 reports of BWSSB's order, and Citizen Matters' April 2025 guide to the Act and Rules. The Ground Water Authority's website did not load today, so fees and forms below are as reported by Citizen Matters from the Act and Rules.

Is permission required for a borewell in Bangalore?

  • BWSSB released an official note in March 2024 making permission compulsory before drilling, in force from 15 March 2024 (The News Minute, 11 March 2024).
  • Public borewells get priority. For private ones, the authority weighs groundwater level, need and expert opinion (The News Minute).
  • Private borewells need a site inspection by officials before approval (Oneindia, 12 March 2024).
  • BWSSB's chairman said drilling without permission would bring legal action under Section 11 of the 2011 Act (Oneindia).

Who gives permission: BWSSB or the Ground Water Authority?

  • BWSSB portal: 'Permission for drilling new borewell within BBMP limit towards residential houses only' (BWSSB ground-water portal).
  • Apartments, commercial and industrial premises: contact the Director or Deputy Director, Ground Water Authority, 13th Floor, Visvesvaraya Tower, Dr B.R. Ambedkar Veedhi, Bengaluru 560001 (BWSSB portal).
  • Applications can also be filed at the Director's office of the Karnataka Ground Water Authority or the jurisdictional BWSSB sub-division office (Citizen Matters, 8 April 2025).
  • Not sure whether your area is inside BWSSB's limits? See BWSSB New Areas 2026: Sarjapur, Anekal, Jigani Water Explained.

How do you apply for borewell permission online?

  • 1. Open BWSSB's ground-water portal (bwsajala.karnataka.gov.in/DBW) and sign up.
  • 2. Fill in the application for a new borewell for your house and upload the documents.
  • 3. Officials inspect the site and assess groundwater level and need.
  • 4. The decision is due within the 60-day limit the portal shows under the Public Service Guarantee Act.
  • 5. Hire a drilling agency registered with the Ground Water Authority, and drill only as permitted.
  • 6. Register the borewell after drilling (Citizen Matters).

Forms, documents and fees

As reported by Citizen Matters (8 April 2025) from the 2011 Act and the 2012 Rules:

  • Form 1A: drinking or agricultural use. Form 1B: industrial, commercial or entertainment use.
  • Form 4: registration of existing users in notified areas; the certificate is issued in Form 5A.
  • Form 6: drilling-agency registration; approved rigs get a Form 7A certificate valid for two years.
  • Fee for a new borewell: ₹500 per borewell plus ₹3,000 survey charges.
  • Registration of an existing borewell: ₹50 for drinking or agriculture, ₹500 for other uses.
  • Drilling agency: ₹5,000 per rig.
  • Domestic documents: khata certificate, survey number, address proof, ownership proof such as the sale deed, and the latest property tax receipts.
  • Decision time: 60 days for a new permit, 30 days for registering an existing borewell.

Is rainwater harvesting needed for borewell permission?

We found no published rule that makes rainwater harvesting a condition of a domestic borewell permit. Citizen Matters lists a rainwater harvesting plan only among the documents for industrial users. But RWH is compulsory anyway for new buildings on sites of 108 sq m and above under Section 72A of the BWSSB Act, and that section defines groundwater recharge to include recharging a borewell. A recharge pit next to the borewell meets both purposes. Rules and costs: Rainwater Harvesting Rules in Bangalore: BWSSB Norms, Penalty.

What is the penalty for drilling a borewell without permission?

Under the 2011 Act, as quoted by Citizen Matters:

  • Drilling without a permit, or obstructing the authority: fine up to ₹5,000, jail up to 6 months, or both, plus up to ₹100 a day for continuing obstruction.
  • Non-agency digging without a permit, or extraction in a notified area without registration: fine up to ₹2,000, jail up to 3 months, or both.
  • Other violations: fine up to ₹10,000, jail up to 1 year, or both.
  • Repeated violations: the authority may seize the well and equipment.

Buying a house with a borewell: what to check