Updated 21 October 2026. We read the project's K-RERA registration and its latest quarterly progress report, the developer's project page and the company's FY26 results coverage. Unlike most pages that rank for this project, we give the registered completion date, the full unit mix with RERA carpet areas, the latest progress figure and the distances the developer publishes, each with its source.
Fact file
- Developer: Birla Estates (Aditya Birla Real Estate); RERA promoter Vardhita Properties Private Limited (K-RERA).
- Location: Sy. Nos. 64/1, 64/2, 65/3, 68/3 and 68/4, Kodathi Village, Varthur Hobli, Bengaluru East Taluk, 560035 (K-RERA).
- Land: 1,04,053 sq m, about 25.7 acres (K-RERA); the developer says 25 acres with 75% open space.
- Towers and homes: 13 towers, 1,594 apartments. Towers 1–4 have 24 floors, 5–8 have 25, 9–12 have 27 with two basements, and Tower 13 has 4 floors (K-RERA).
- Home types: 1, 2, 3 and 4 BHK in the RERA filing; only 3 and 4 BHK are marketed on the developer page today.
- Price as published: from ₹2.08 Cr*, indicative, excluding stamp duty, registration and GST (Birla Estates, read 21 October 2026).
- RERA number and status: PRM/KA/RERA/1251/446/PR/060225/007487, APPROVED, registered 6 February 2025 (K-RERA).
- Possession (registered): proposed completion 25 December 2031; project start date 25 May 2025; no extension recorded (K-RERA).
- Plan approval: BDA plan no. 41/2024-25 dated 21 December 2024; FAR sanctioned 2.246 (K-RERA).
- Progress: 12% overall completion, as per the latest RERA quarterly update (Q2 FY2026-27, submitted 14 October 2026).
What is the price of Birla Evara?
The developer publishes one figure: from ₹2.08 Cr* for its 3 and 4 BHK homes. The asterisk matters. Birla Estates says the price is indicative and excludes stamp duty, registration and GST (project page, read 21 October 2026). It does not publish a tower-wise or size-wise price list.
The same page lists two payment-plan offers: a 20:20:60 plan on 3 BHK homes and a 10:10:80 plan on 4 BHK homes. Ask for the written cost sheet for the exact unit, floor and facing you want, and for the payment schedule that will go into the agreement.
Booking pace is a matter of record at company level. Birla Evara clocked over ₹1,044 crore of bookings in FY26, the year to March 2026, out of Birla Estates' total of ₹8,136 crore (Investywise, reporting the company's FY26 results, 23 April 2026). That is a reported figure, not a RERA filing.
Floor plans: sizes and unit mix from the RERA filing
The K-RERA filing lists carpet areas in square metres for every unit type. We converted them to square feet and averaged them by type. These are carpet areas, which are smaller than the super built-up figures used in most advertisements.
- 1 BHK · 140 units · about 450 sq ft carpet (average)
- 2 BHK · 135 units · about 825 sq ft carpet
- 3 BHK Compact · 273 units · about 1,051 sq ft carpet
- 3 BHK Regular · 250 units · about 1,172 sq ft carpet
- 3 BHK + servant room · 417 units · about 1,330 sq ft carpet
- 4 BHK + servant room · 303 units · about 1,613 sq ft carpet
- Totals: carpet area of all floors 1,75,208 sq m; built-up area 3,61,413 sq m; 1,778 covered and 185 open parking spaces (K-RERA).
Possession date and construction status
The only possession date that binds the promoter is the one on the RERA registration: 25 December 2031 (K-RERA). Dates on third-party sites vary and are not official.
As per the latest RERA quarterly update, overall completion stood at 12% for Q2 FY2026-27, submitted on 14 October 2026. The earlier quarters read 4% (Q3 FY26), 6% (Q4 FY26) and 9% (Q1 FY27). The project started on 25 May 2025, so these are early-stage figures, as you would expect.
Location and connectivity
The site is in Kodathi, in the Sarjapur Road belt between Carmelaram and Dommasandra. The developer publishes these distances (Birla Estates, read 21 October 2026):
- Proposed Carmelaram metro station · 5 km
- Carmelaram railway station · 5 km
- Outer Ring Road · 8 km
- RGA Tech Park · 5 km; Wipro SEZ · 6 km; Electronic City · 6 km; RMZ Ecoworld · 10 km
- Primus Public School · 1 km; National Public School East · 3 km; Delhi Public School East · 4 km
- Cloudnine Hospital · 7 km; Manipal Hospital · 8 km
Who Birla Evara suits
On the facts, it suits a family that wants a large gated community with two clubhouses, is comfortable with a registered completion date at the end of 2031, and works in the Sarjapur Road, Outer Ring Road or Electronic City belts. The unit mix is weighted to larger 3 and 4 BHK homes: 940 of the 1,594 homes are 3 BHK and 303 are 4 BHK (K-RERA).
The developer lists a North Club (cafe, badminton, spa, squash, mini theatre) and a South Club (pool and kids' pool, gym, yoga, jacuzzi, indoor badminton), plus tennis, basketball, an amphitheatre and a pet park. The RERA filing lists the water source as the local authority, Kodathi Grama Panchayath.
What to check before you book
- Open the project on the K-RERA portal and match the registration number, promoter name and completion date to your agreement.
- Read the latest quarterly progress report for your tower, not just the project total.
- Ask for the sanctioned plan and confirm your unit and tower appear in it.
- Get the carpet area of your unit written into the agreement, separate from any super built-up figure.
- Ask for a written cost sheet: base price, floor-rise, parking, club, maintenance deposit, GST, stamp duty and registration.
- Match the payment plan to construction stages, and keep the booking amount within the RERA limit of 10% before the agreement for sale is registered.
- If you need a loan, confirm which banks have approved the project.
Similar homes nearby
Other projects we list in the same Kodathi–Sarjapur Road pocket, for comparison:
- Godrej Lakeside Orchard, Kodathi, off Sarjapur Road · Godrej Properties · under construction · Godrej Lakeside Orchard Kodathi Off Sarjapur Road East Bengaluru
- Mana Dale, Kodathi, Sarjapur Road · Mana Projects · under construction · Mana Dale Kodathi Sarjapur Road
- Sobha Altair, Sarjapur Road · Sobha Limited · under construction · Sobha Altair Sarjapur Road East Bengaluru
- The Birla Evara project page: Birla Evara Kodathi Sarjapur Road
- Related reading: Gated Community 3 BHK on Sarjapur Road: 2026 Prices, Red Line Metro Bangalore: Hebbal–Sarjapur Stations and 2033 Date and How to Check RERA Registration in Karnataka: 7 Steps. All Sarjapur Road homes: Sarjapur Road, Bangalore