Seventeen HRERA-registered housing projects sit close to the KMP Expressway’s Gurgaon-district exits and the IMT Manesar job hub: the Gurgaon International City (GIC) blocks in Manesar Sectors M9-M11, the Sector 80 group-housing plots on NH-48, Sidhrawali further south, and Sector 3 Farukhnagar. RERA completion dates run from 31 December 2026 (Express Greens, IMT Manesar) to 30 June 2034 (M3M Forestia West I and East I).

Updated 20 November 2026. We filtered the HRERA Gurugram register for Manesar, Sector 80, Sidhrawali and Farukhnagar, kept active residential registrations finishing after today, and grouped them by the KMP or NH-48 exit they use. Prices are not shown because none of these builders has published a verifiable price list; where configurations are stated by the developer we give them.

Summary table: projects near KMP Expressway and IMT Manesar

Grouped by exit, then by completion date. Project — Builder — Sector — HRERA no. — Configs — RERA completion.

  • Express Greens — HSIIDC (promoter on HRERA) — Sectors M1/M1A, IMT Manesar — RERA-GRG-1122-2022 / 1125-2022 — group housing — 31 Dec 2026
  • The Golden City / Floors / Golden Residences II — Worldwide Resorts and Entertainment — Sectors M9-M14 — RERA-GRG-1168-2022 / 1669-2024 / 1861-2025 — plots, floors — 15 Jun 2027 to 29 Sep 2027
  • Swastik Greens — Prominent Enterprises — Sectors M9-M10 — RERA-GRG-1446-2023 — plots — 26 Mar 2028
  • The Majestic (four registrations) — JMS Group — Sectors M9-M14 — RERA-GRG-1964-2025 / 2038-2025 / 1984-2025 / 2131-2025 — plots, floors, homes — 31 Mar 2028 to 31 Dec 2028
  • Smartworld Nature’s Court I — Smartworld (Svabhumi Realtors) — GIC, M9-M11 — RERA-GRG-2126-2025 — 2.5 BHK — 30 Jun 2033
  • M3M Forestia West I — M3M India Infrastructures — GIC, M9-M11 — RERA-GRG-2124-2025 — 3 BHK — 30 Jun 2034
  • M3M Forestia East I — M3M India Infrastructures — GIC, M9-M11 — RERA-GRG-2125-2025 — not published — 30 Jun 2034
  • Signature Global City of Colours NH-8 and Extn.-1 — Signature Global — Sidhrawali — RERA-GRG-1722-2024 / 1942-2025 — township — 31 Dec 2028
  • Eldeco Fairway Reserve — Eldeco — Sector 80 — RERA-GRG-1680-2024 — apartments — 30 Dec 2029
  • Sobha Aranya Phase 1 — Sobha — Sector 80 — RERA-GRG-1565-2024 — 3 and 4 bed, 2,836-4,285 sq ft — 31 Oct 2030
  • Eldeco Terra & Sol — Eldeco — Sector 80 (Plot 3A) — RERA-GRG-2160-2026 — apartments — 15 Jan 2031
  • Elaira Residences Phases 1, 2 and 2A — Conscient — Sector 80 — RERA-GRG-1863-2025 / 2101-2025 — apartments — 31 Mar 2031 / 30 Jun 2032
  • Parq — Keywest Eduinfra & Services — Sector 80 — RERA-GRG-1584-2024 — apartments — 31 May 2031
  • Omara — Trehan IRIS — Sector 80 — RERA-GRG-2092-2025 — apartments — 31 Dec 2032
  • Ashiana Aaroham Phases I-II — Ashiana Housing — Sector 80 (HSIIDC plot GH-04) — RERA-GRG-2020-2025 / 2134-2025 — apartments — 31 Oct 2033
  • Spiti Palm Estate — Spiti Projects — Sector 3, Farukhnagar — RERA-GRG-1520-2023 — plots — 28 Jul 2028
  • Golden Gate Residency I-II — Yashvi Homes / Builders — Sector 3, Farukhnagar — RERA-GRG-1444-2023 / 1809-2024 — plots — 31 Jul 2028 / 31 Jul 2029

Where are the KMP Expressway exits in Gurgaon district?

  • Manesar: junction with NH-48 and NH-352W.
  • Pachgaon: cloverleaf interchange with NH-48, with a planned multi-modal transit centre.
  • Farukhnagar: interchange with SH-15A.
  • The KMP is a 135.6-km, six-lane expressway from Kundli to Palwal; its Manesar-Palwal section opened in April 2016 and the Kundli-Manesar section on 19 November 2018. Car toll was notified at about ₹1.35 per km (Western Peripheral Expressway page). Exit details and toll points are in KMP Expressway Route Map: Gurgaon Exits, Toll and Speed Limit.

IMT Manesar as a job hub: what HSIIDC lists

HSIIDC’s IMT Manesar page lists Phase I (174.49 acres, 1997-98), Phase II (174.43 acres), Phase III (598.75 acres), Phase IV (662.65 acres), a 465.67-acre transport hub and a 285.02-acre warehousing hub, with Phases I-V developed and Phase VI under development. It names 23 MNC/FDI allottees including Maruti Suzuki, Honda Motorcycle and Scooter India, ITC, Denso and Nestlé’s R&D centre, a 55 MLD effluent plant, and Patli railway station 5 km away. The page gives the airport distance as 32 km in one place and 17 km in another; we quote neither as a commute time.

Express Greens, IMT Manesar Sectors M1 and M1A

Two registrations with HSIIDC named as promoter on HRERA: RERA-GRG-1122-2022 (Sector M1) and RERA-GRG-1125-2022 (Sector M1A), both dated 19 September 2022. RERA completion date: 31 December 2026, the nearest in this cluster. Sector guide: Imt Manesar.

Smartworld Nature’s Court I, Gurgaon International City

Registered to Svabhumi Realtors Pvt Ltd under RERA-GRG-2126-2025 on 2 January 2026, in Sectors M9, M10 and M11. 2.5 BHK homes; part of GIC Phase 1, which the developer said sold out within three days with about ₹2,000 crore of residential sales (Tribune/NewsVoir release, 25 February 2026). RERA completion date: 30 June 2033. Our page: Smartworld Nature's Court.

M3M Forestia West I, Gurgaon International City

RERA-GRG-2124-2025, registered 2 January 2026 to M3M India Infrastructures Pvt Ltd. 3 BHK homes in GIC Phase 1. GIC is a 150-acre master development launched in November 2025 with planned investment of about ₹7,200 crore (same release). The overall GIC registration is RERA-GRG-2058-2025 (completion 30 September 2034). Forestia West I RERA completion date: 30 June 2034. Our page: M3M Forestia West.

M3M Forestia East I, Gurgaon International City

The next GIC residential block, RERA-GRG-2125-2025, registered 21 January 2026. RERA completion date: 30 June 2034. Configurations had not been published in sources we could verify. Our page: M3M Forestia East.

JMS The Majestic, Manesar Sectors M9-M14

JMS Group has four registrations here: The Majestic (RERA-GRG-1964-2025, completion 30 June 2028), The Majestic Abode (RERA-GRG-2038-2025, 31 March 2028), The Majestic Floors (RERA-GRG-1984-2025, 30 June 2028) and The Majestic Homes (RERA-GRG-2131-2025, 31 December 2028). Our page: JMS The Majestic Homes.

The Golden City and Swastik Greens, Manesar Sectors M9-M14

Worldwide Resorts and Entertainment’s The Golden City (RERA-GRG-1168-2022, completion 29 September 2027), The Golden City Floors (RERA-GRG-1669-2024, 15 June 2027) and The Golden Residences II (RERA-GRG-1861-2025, 15 September 2027) are in villages Bansharia and Banskhusla. Prominent Enterprises’ Swastik Greens plots (RERA-GRG-1446-2023) are due 26 March 2028. Our page: Prominent Swastik Greens.

Sobha Aranya, Sector 80

Sobha’s Phase 1 in village Naurangpur, RERA-GRG-1565-2024, registered 1 April 2024. Sobha’s Gurugram page lists Aranya as a new tower launch with 3 and 4 bed homes of 2,836 to 4,285 sq ft. RERA completion date: 31 October 2030. Our page: Sobha Aranya; sector guide Sector 80 Gurgaon, Gurgaon.

Eldeco Fairway Reserve and Eldeco Terra & Sol, Sector 80

Eldeco Fairway Reserve is RERA-GRG-1680-2024 (registered 23 October 2024, completion 30 December 2029). Eldeco Terra & Sol, on Plot 3A, is RERA-GRG-2160-2026 (registered 11 March 2026, completion 15 January 2031). Our pages: Eldeco Fairway Reserve and Eldeco Terra & Sol.

Conscient Elaira Residences and Parq, Sector 80

Elaira Residences Phase 1 is RERA-GRG-1863-2025 (completion 31 March 2031) and Phases 2 and 2A are RERA-GRG-2101-2025 (30 June 2032), both filed by Conscient Infrastructure in village Naurangpur. Parq, filed by Keywest Eduinfra & Services, is RERA-GRG-1584-2024 with a completion date of 31 May 2031. Our pages: Conscient Elaira Residences and Conscient Parq.

Trehan IRIS Omara, Sector 80

Filed by Trehan Promoters & Builders under RERA-GRG-2092-2025, registered 22 January 2026. RERA completion date: 31 December 2032. Our page: Trehan IRIS Omara.

Ashiana Aaroham, Sector 80

Ashiana Housing’s project on HSIIDC group-housing plot GH-04 has Phase 1 (RERA-GRG-2020-2025, registered 25 November 2025) and Phase II (RERA-GRG-2134-2025, registered 27 January 2026), both with a RERA completion date of 31 October 2033. Our page: Ashiana Aaroham.

Signature Global City of Colours, Sidhrawali (NH-48)

South of Manesar on NH-48, Signature Global’s City of Colours NH-8 (RERA-GRG-1722-2024) and Extn.-1 (RERA-GRG-1942-2025) in village Sidhrawali both have a RERA completion date of 31 December 2028. Our page: Signature Global City of Colours.

Farukhnagar exit: Sector 3 plotted colonies

Near the KMP-SH-15A exit, Spiti Palm Estate (RERA-GRG-1520-2023, completion 28 July 2028) and Golden Gate Residency I and II (RERA-GRG-1444-2023 and 1809-2024, completions 31 July 2028 and 31 July 2029) are registered plotted projects. Our pages: Spiti Palm Estate, Yashvi Golden Gate Residency and Golden Gate Residency II. Area guide: Farrukhnagar and the KMP Corridor: Buyer's Guide 2026 — DDJAY Floors, Build-and-Rent Maths and a 194-Acre Farmhouse Project.

Possession dates near KMP and IMT Manesar

  • 31 Dec 2026: Express Greens (IMT Manesar M1/M1A)
  • 2027: The Golden City Floors (15 Jun), Golden Residences II (15 Sep), The Golden City (29 Sep)
  • 2028: Swastik Greens, The Majestic group, Spiti Palm Estate, Golden Gate Residency, City of Colours
  • 2029-2031: Golden Gate Residency II, Eldeco Fairway Reserve, Sobha Aranya Phase 1, Eldeco Terra & Sol, Elaira Phase 1, Parq
  • 2032-2034: Elaira Phases 2-2A, Omara, Ashiana Aaroham, Nature’s Court I, Forestia West I and East I

What should KMP-corridor buyers check?

  • Plots versus apartments: many Manesar and Farukhnagar registrations are plotted colonies. Confirm whether you are buying a plot, a floor or an apartment in the HRERA filing.
  • Licence area: the sector names M9-M14 are Manesar master-plan sectors, not Gurgaon city sectors. Check the village names on the HRERA page.
  • Commute: map your own route to your workplace through the Manesar or Pachgaon exits at peak hour before booking; no official source publishes sector-wise times.
  • Proposals: the Greater SPR and metro to Pachgaon are proposals, not built roads. See Greater Southern Peripheral Road Gurgaon: GSPR Route, Status and Sector 56 to Panchgaon Metro 2026: Route, 28 Stations, Status.