Thirteen HRERA-registered housing projects sit in the four sectors closest to the cloverleaf where the Dwarka Expressway meets NH-48 at Kherki Daula: Sectors 36/36A, 37D, 99A and 88A. Verified launch prices start at about ₹2.4 crore (The Terraces at Max Estates’ Estate 361) and ₹2.45 crore (Emperium Titan), and RERA completion dates run from 31 January 2027 to 30 September 2033.

Updated 20 November 2026. We filtered the HRERA Gurugram register for these sectors, kept only active registrations finishing after today, and matched each to our project pages. We also checked the GMDA tender for the elevated Southern Peripheral Road (SPR) that will start at this same cloverleaf.

Summary table: projects near the Dwarka Expressway-NH-48 cloverleaf

Ordered by sector. Project — Builder — Sector — HRERA no. — Configs — Price (verified only) — RERA completion.

  • Estate 361 — Max Estates — Sector 36 (HRERA) / 36A (marketing) — RERA-GRG-2093-2025 — township phases — The Terraces from ₹2.4 Cr — 30 Sep 2033
  • Estate 360 — Max Estates — Sector 36A — RERA-GRG-1675-2024 — apartments — not verified — 31 Aug 2030
  • Krisumi City (Waterside Residences, The Forest Reserve I-II, Waterfall Suites I-II) — Krisumi Corporation — Sector 36A — RERA-GRG-1562-2024, 1886-2025, 1901-2025, 1302-2023, 1573-2024 — apartments — not verified — 31 Dec 2028 to 30 Jun 2031
  • Signature Global City 37D Extn. — Signature Global — Sector 37D — RERA-GRG-1784-2024, 1803-2024, 1824-2024 — DDJAY floors — not verified — 31 Jan 2027
  • Sarvam at DXP Estate — Signature Global — Sector 37D — RERA-GRG-2083-2025 — apartments — not verified — 31 Dec 2032
  • De-Luxe DXP — Signature Global — Sector 37D — RERA-GRG-1507-2023 — apartments — not verified — 31 Mar 2031
  • The Amaario — BPTP — Sector 37D — RERA-GRG-1470-2023 — apartments — not verified — 30 Sep 2031
  • ATS Grandstand Phase 2 — ATS Homekraft — Sector 99A — RERA-GRG-2297-2026 — 362 apartments — not published — 31 Mar 2031
  • Tatva Estates — Alton Buildtech India — Sector 99A — RERA-GRG-1299-2023 — plotted — not verified — 4 Dec 2027
  • Signature Global Imperial — Signature Global — Sector 88A — RERA-GRG-1025-2022 — affordable apartments — not verified — 27 Feb 2027
  • Cocoa County Phases 02-04 — County Group (HRERA promoter Ashiana Landcraft Realty) — Sector 88A — RERA-GRG-2239-2026, 2270-2026, 2271-2026 — 3 and 4 BHK — not verified — 31 Dec 2032
  • Emperium Titan — Emperium Group — Sector 88A — RERA-GRG-2172-2026 — 3 BHK, 1,906 sq ft — ₹2.45 Cr flat — 31 Mar 2031
  • The Oryza — Aura Builders and Developers — Sector 88A — RERA-GRG-2158-2026 — group housing — not published — 30 Sep 2033

What is the Dwarka Expressway cloverleaf, and what is being built next?

The cloverleaf is a four-loop junction at Kherki Daula that links NH-48, the Dwarka Expressway and the SPR on the other side of NH-48. It is part of NHAI’s Package 4 of the Dwarka Expressway, built by L&T, and its loops run over 2 km (Swarajya, 6 September 2023). NHAI also planned four Miyawaki mini forests at its four points (The Tribune, 23 July 2023). The expressway runs from Mahipalpur in Delhi to Kherki Daula, with 18.9 km in Haryana and 10.1 km in Delhi.

The next piece is the elevated SPR. GMDA invited bids on 1 October 2026 for a ₹776 crore, 4.23-km first phase from Vatika Chowk to the cloverleaf: four elevated lanes each way, 3+3 primary and 2+2 secondary service roads, and a 30-month build after award (Swarajya, 3 October 2026). Bids were due 18 November 2026; the next steps are in SPR Elevated Road After 18 Nov 2026: What Happens Next.

Estate 361, Sector 36A

Max Estates’ township is registered as RERA-GRG-2093-2025 on 21 November 2025. HRERA lists it in village Harsaru, Sector 36, while the builder and our page use Sector 36A. RERA completion date: 30 September 2033. Its first phase, The Terraces, opened in May 2026 with 120 homes from ₹2.4 crore; the whole township is estimated at ₹9,000 crore of sales value (Sahi, 14 May 2026). Our page: Max Estate 361; sector guide Sector 36a Gurgaon, Gurgaon.

Estate 360, Sector 36A

The earlier Max Estates project next door, RERA-GRG-1675-2024, registered 16 August 2024 in village Harsaru. RERA completion date: 31 August 2030. Our page: Max Estate 360.

Krisumi City, Sector 36A

Krisumi Corporation has five live residential registrations in Sector 36A: Waterfall Suites (RERA-GRG-1302-2023, completion 31 December 2028), Waterfall Suites-II (RERA-GRG-1573-2024, 31 December 2029), Waterside Residences (RERA-GRG-1562-2024, 14 October 2029) and Waterside Residences The Forest Reserve I and II (RERA-GRG-1886-2025 and 1901-2025, both 30 June 2031). Our pages: Krisumi Waterside Residences, Krisumi Waterside Residences The Forest Reserve and Krisumi Waterfall Suites.

Signature Global City 37D Extn., Sector 37D

DDJAY independent floors in village Gadauli Kalan, registered on 28 March 2025 under RERA-GRG-1784-2024, RERA-GRG-1803-2024 and RERA-GRG-1824-2024 (City 37D-1A). RERA completion date: 31 January 2027, the nearest possession date in this cluster. No project page on our site yet; compare Sector 37D options in Sector 37D Gurgaon Projects 2026: Prices, Elevated Road and Sector 37d Gurgaon, Gurgaon.

Sarvam at DXP Estate and De-Luxe DXP, Sector 37D

Two more Signature Global registrations in Gadauli Kalan. Sarvam at DXP Estate is RERA-GRG-2083-2025, registered 7 November 2025, completion 31 December 2032. De-Luxe DXP is RERA-GRG-1507-2023, registered 7 February 2024, completion 31 March 2031. Our pages: Signature Global Sarvam and Signature Global De Luxe DXP.

The Amaario, Sector 37D

BPTP’s project (HRERA promoter Countrywide Promoters Pvt Ltd), registered under RERA-GRG-1470-2023. RERA completion date: 30 September 2031. Our page: BPTP The Amaario.

ATS Grandstand Phase 2, Sector 99A

ATS Homekraft’s second phase (promoter Homekraft Infra Pvt Ltd), registered under RERA-GRG-2297-2026 on 17 August 2026. RERA completion date: 31 March 2031, the same date HRERA shows for Phase 1 (RERA-GRG-379-2019). The Phase 2 filing lists 362 apartments in two carpet types of about 112 and 152 sq m. Our page: ATS Grandstand Phase 2; sector guide Sector 99a Gurgaon, Gurgaon.

Tatva Estates, Sector 99A

A plotted project registered to Alton Buildtech India Pvt Ltd under RERA-GRG-1299-2023 (registration dated 2 March 2023). RERA completion date: 4 December 2027. Our page: Adani Tatva Estates. Check the promoter name on HRERA against your allotment papers.

Signature Global Imperial, Sector 88A

Affordable-housing apartments in village Harsaru, RERA-GRG-1025-2022, registered 21 March 2022. RERA completion date: 27 February 2027. Our page: Signature Global Imperial; sector guide Sector 88a Gurgaon, Gurgaon.

Cocoa County, Sector 88A

County Group’s new project, registered in three phases (Phase 02, 03 and 04) under RERA-GRG-2239-2026, RERA-GRG-2270-2026 and RERA-GRG-2271-2026, all dated 11 September 2026 and filed by Ashiana Landcraft Realty Pvt Ltd in village Harsaru. RERA completion date for all three: 31 December 2032. Our page: Cocoa County; detail post Cocoa County Sector 88A Gurgaon: Price, HRERA, Sizes (2026).

Emperium Titan, Sector 88A

A compact project on 1.03 acres: 74 fully air-conditioned 3 BHK homes of 1,906 sq ft each, plus 20 high-street shops, at a flat ₹2.45 crore per home (Realty N More, 4 April 2026). HRERA registration: RERA-GRG-2172-2026, dated 25 March 2026. RERA completion date: 31 March 2031. Our page: Emperium Titan.

The Oryza, Sector 88A

Registered to Aura Builders and Developers Pvt Ltd under RERA-GRG-2158-2026 on 24 February 2026. RERA completion date: 30 September 2033. Configurations and price had not been published in sources we could verify. Our page: The Oryza.

Possession dates near Kherki Daula: which projects finish first?

  • January 2027: Signature Global City 37D Extn. (31 Jan 2027)
  • February 2027: Signature Global Imperial (27 Feb 2027)
  • December 2027: Tatva Estates (4 Dec 2027)
  • 2028-2029: Krisumi Waterfall Suites (31 Dec 2028), Waterfall Suites-II (31 Dec 2029), Waterside Residences (14 Oct 2029)
  • 2030-2031: Estate 360 (31 Aug 2030), Emperium Titan (31 Mar 2031), De-Luxe DXP (31 Mar 2031), ATS Grandstand Phase 2 (31 Mar 2031), Krisumi Forest Reserve (30 Jun 2031), The Amaario (30 Sep 2031)
  • 2032-2033: Sarvam (31 Dec 2032), Cocoa County (31 Dec 2032), Estate 361 (30 Sep 2033), The Oryza (30 Sep 2033)

How to verify a Dwarka Expressway project on HRERA

  • Search the RERA-GRG number on haryanarera.gov.in under Registered Projects, Gurugram. Check the promoter name and village, not just the brand name.
  • Note that HRERA can show a different sector label from the brochure (Estate 361 is Sector 36 on HRERA, 36A in marketing). The village and khasra numbers in the licence decide the location.
  • Download the latest quarterly progress report and the building plan from the project page.
  • For DDJAY floors, check that the floor you are buying is in the registered plot list.
  • Use /calculators/gurgaon-total-cost to add stamp duty, registration and other charges to the base price.