Sixteen HRERA-registered housing projects (counting each multi-phase community once) sit in Sectors 58 to 66 on Golf Course Extension Road (GCER), the stretch the proposed Sector 56-Pachgaon metro is reported to run along before it turns onto SPR at Vatika Chowk. Verified prices run from ₹4.91 crore (Godrej Verano, builder’s page) to ₹18 crore and up (Oberoi Three Sixty North, launch report), and RERA completion dates run from 31 December 2026 to 1 January 2034. The metro itself is still a proposal: a 35-35.25 km, 28-station elevated line whose revised DPR was being finalised in October 2026.

Updated 20 November 2026. We read every row of the HRERA Gurugram register of registered projects for Sectors 58-66 and kept only active registrations with a completion date after today, checked launch facts against dated developer and news reports, and re-checked the metro’s status in the latest reports we could find. No station-level list has been published, so we map projects to the sectors the line is reported to serve, not to stations.

Summary table: projects near the Sector 56-Pachgaon metro route

Ordered by sector, north to south. Format: Project — Builder — Sector — HRERA no. — Configs — Price (verified only) — RERA completion.

  • Three Sixty North — Oberoi Realty — Sector 58 — RERA-GRG-2240-2026 to 2245-2026 — large apartments — from ₹18 Cr (BSP ₹35,000/sq ft) — 31 Dec 2033
  • The Bungalows Phase 1 — Max Estates — Sector 59 — HARERA RC/REP/HARERA/GGM/1099/831/2026/71 — 4-bed homes, townhouses, penthouses — not published — not yet on the public register list
  • The Aravallis — Puri Constructions — Sector 61 — RERA-GRG-1049-2022 — apartments — not verified — 30 Jun 2029
  • Alura — Pioneer Urban — Sector 62 — RERA-GRG-2049-2025 — 7,000-15,000 sq ft residences — not published — 1 Jan 2034
  • Amaris — Emaar India — Sector 62 — RERA-GRG-1790-2024 — apartments — not verified — 30 Aug 2030
  • The Aureva — DLF — Sector 63 — RERA-GRG-2265-2026 — 4 BHK senior living — sold out, avg about ₹11.5 Cr — 31 Oct 2033
  • Samsara Avasa / Samsara Ivana 2.0 — Adani Brahma Synergy — Sector 63 — RERA-GRG-1150-2022 / 2024-2025 — low-rise floors — not verified — 31 Dec 2026 / 30 Sep 2030
  • Godrej Verano — Godrej Properties — Sector 63A — RERA-GRG-2274-2026 — 3, 4, 5 BHK — from ₹4.91 Cr — 2 Jun 2033
  • Sobha Crescent Phase 1 — Sobha — Sector 63A — RERA-GRG-2185-2026 — 3 and 4 bed, 2,277-2,966 sq ft — not published — 31 Mar 2033
  • The Estate One — Anant Raj — Sector 63A — RERA-GRG-2197-2026 — group housing — not published — 21 Jul 2033
  • Birla Navya (Anaika, Avik 1, Avik 2) — Birla Estates — Sector 63A — RERA-GRG-1012-2022 / 1233-2022 / 1829-2024 — low-rise — not verified — 31 Dec 2026 to 30 Apr 2030
  • Trump Towers Delhi NCR — Tribeca / M3M — Sector 65 — RERA-GRG-1388-2023 — ultra-luxury apartments — not verified — 28 Jun 2027
  • M3M Altitude — M3M — Sector 65 — RERA-GRG-1607-2024 — apartments — not verified — 31 Jul 2031
  • Emerald Hills Phase 2 — Emaar India — Sectors 62 and 65 — RERA-GRG-1342-2023 — plots — not verified — 10 Aug 2027
  • Marbella (Phase 2, Phase 7, Terraces) — Emaar India — Sectors 65-66 — RERA-GRG-755-2020 / 2230-2026 / 2228-2026 — villas and plotted phases — not verified — 31 Dec 2026 to 31 Dec 2031
  • The Edition / Downtown 66 — Smartworld / BPTP — Sector 66 — RERA-GRG-1395-2023 / 2009-2025 — apartments — not verified — 1 Feb 2031 / 31 Oct 2032

Is the Sector 56-Pachgaon metro approved?

Not yet. The Haryana Mass Rapid Transport Corporation sent the DPR to the state government in mid-2026: 35 km, 28 elevated stations, estimated cost ₹10,428 crore, with the Centre expected to cover about 10% and Haryana about 20% (Indian Infrastructure, 2 July 2026). On 11 September 2026 the Chief Secretary reviewed progress and asked agencies to finalise the revised DPR so it can move to the next approval stage (ThePrint/PTI). On 13 October 2026 the DPR was still described as being finalised (Nativeplanet).

So there is no sanction, no construction tender and no opening date. Buy for the project and the road network that exists today; treat the metro as a possible later addition. We make no price-growth claim from it.

Which sectors does the line pass, and why do the lengths differ?

  • Areas named by PTI (11 Sep 2026): Sectors 56, 61, 65, 66, 50 and 49, Kherki Daula, Global City, New Gurugram Sectors 84, 86 and 90, IMT Manesar and Panchgaon.
  • Interchanges named by Nativeplanet (13 Oct 2026): Sector 56 (Rapid Metro), Vatika Chowk, Kherki Daula near the Dwarka Expressway cloverleaf, IMT Manesar and Panchgaon.
  • Length: 35.2 km (Swarajya, Sep 2025), 35 km (Indian Infrastructure, Jul 2026), 35.25 km (PTI, Sep 2026), 36 km (Nativeplanet, Oct 2026). These describe the same alignment; the official DPR figure we found is 35 km.
  • Cost: ₹8,500 crore in 2025 reports; ₹10,428 crore in the 2026 DPR figure. Use the later figure.
  • System: medium-capacity metro, 90 km/h design speed, CBTC signalling (PTI, 11 Sep 2026).

Three Sixty North, Sector 58

Oberoi Realty’s first NCR project, registered as six towers (A, B, C, E, F, G) under RERA-GRG-2240-2026 to RERA-GRG-2245-2026 on 26 June 2026 in village Ghata, Sector 58. RERA completion date: 31 December 2033. Phase 1 is 832 homes on 14.8 acres at a basic selling price of ₹35,000 per sq ft, with apartments from ₹18 crore; first-week gross bookings were about ₹8,109 crore (PTI, 6 July 2026). Sector 58 sits near the Sector 56 start of the line. Our page: Oberoi Three Sixty North; sector guide Sector 58 Gurgaon, Gurgaon.

The Bungalows, Sector 59

Max Estates launched Phase 1 on 15 November 2026: 243 residences in two standalone towers on 7.25 acres, as four-bedroom apartments, larger four-bedroom homes, townhouses and penthouses. HARERA registration RC/REP/HARERA/GGM/1099/831/2026/71 was granted on 6 November 2026 (Realty Today, 16 November 2026); the RERA-GRG project number was not yet on the public register list when we checked. No price or completion date has been published. Check the certificate on haryanarera.gov.in before paying anything. Sector guide: Sector 59 Gurgaon, Gurgaon.

The Aravallis, Sector 61

Puri Constructions’ group housing project in village Ullawas, Sector 61, registered under RERA-GRG-1049-2022 (registration dated 18 July 2022). RERA completion date: 30 June 2029. Sector 61 is one of the GCER sectors named on the metro route. Our page: Puri The Aravallis.

Alura, Sector 62

Pioneer Urban’s serviced residences in Pioneer District, village Ghata, registered under RERA-GRG-2049-2025 on 16 October 2025. About 250 homes in two towers, sized about 7,000 to 15,000 sq ft (signature residences, duplexes and penthouses). The developer targets completion in Q2 2031 (Constro Facilitator, 4 November 2026); the RERA completion date is 1 January 2034. Our page: Pioneer Alura.

Amaris, Sector 62

Emaar India’s Sector 62 group housing project, registered under RERA-GRG-1790-2024 on 14 November 2024. RERA completion date: 30 August 2030. Our page: Emaar Amaris; sector guide Sector 62 Gurgaon, Gurgaon.

The Aureva, Sector 63

DLF Home Developers’ senior-living tower next to The Arbour, registered under RERA-GRG-2265-2026 on 14 September 2026. One G+45 tower of 172 four-bedroom homes on about 4.17 acres, with an on-site medical centre and three parking spaces per home. All 172 homes sold for about ₹1,985 crore (Business Today, 4 October 2026). RERA completion date: 31 October 2033. Resale only from here. Our page: DLF The Aureva.

Samsara Avasa and Samsara Ivana 2.0, Sector 63

Two low-rise phases by Adani Brahma Synergy. Samsara Avasa (Block L, village Ullahawas) is RERA-GRG-1150-2022 with a RERA completion date of 31 December 2026. Samsara Ivana 2.0 (Block I, village Maidawas) is RERA-GRG-2024-2025, registered 16 October 2025, completion 30 September 2030. Our page: Adani Samsara Ivana 2.0; sector guide Sector 63 Gurgaon, Gurgaon.

Godrej Verano, Sector 63A

Godrej Properties’ project registered under RERA-GRG-2274-2026 on 11 August 2026. The builder’s page lists 3, 4 and 5 BHK homes in four towers from ₹4.91 crore, with possession shown as March 2031; the RERA completion date is 2 June 2033. Our page: Godrej Verano; full post Godrej Verano Sector 63A: Price, RERA, Sizes, Possession.

Sobha Crescent Phase 1, Sector 63A

Sobha’s first GCER project, in village Behrampur, registered under RERA-GRG-2185-2026 on 3 April 2026. Sobha’s Gurugram page lists it as a new launch with 3 and 4 bed homes of 2,277 to 2,966 sq ft. RERA completion date: 31 March 2033. Our page: SOBHA Crescent.

The Estate One, Sector 63A

Anant Raj’s new group housing registration, RERA-GRG-2197-2026, dated 20 August 2026, on about 5.09 acres. RERA completion date: 21 July 2033. It sits beside the same builder’s The Estate Residences (RERA-GRG-1423-2023, completion 31 March 2030). Our page: Anant Raj The Estate One; sector guide Sector 63a Gurgaon, Gurgaon.

Birla Navya, Sector 63A

Birla Estates’ low-rise community (promoter Avarna Projects LLP) has three registrations: Anaika RERA-GRG-1012-2022 (completion 31 December 2026), Avik Phase 1 RERA-GRG-1233-2022 (30 April 2027) and Avik Phase 2 RERA-GRG-1829-2024 (30 April 2030). Our page: Birla Navya.

Trump Towers Delhi NCR, Sector 65

Ultra-luxury towers by Tribeca Developers with M3M (HRERA promoter: Olive Realcon Pvt Ltd), registered under RERA-GRG-1388-2023 on 17 July 2023. RERA completion date: 28 June 2027. Sector 65 is named on the metro route. Our page: Trump Towers Delhi NCR (Gurgaon); sector guide Sector 65 Gurgaon, Gurgaon.

M3M Altitude, Sector 65

Registered under RERA-GRG-1607-2024 on 29 April 2024 (promoter Manglam Multiplex Pvt Ltd). RERA completion date: 31 July 2031. Our page: M3M Altitude; detail post M3M Altitude Sector 65 Gurugram: Price, RERA, Possession 2026.

Emerald Hills Phase 2, Sectors 62 and 65

Emaar India’s plotted phase across villages Badshahpur, Maidawas and Nangli Umarpur, registered under RERA-GRG-1342-2023 on 8 May 2023. RERA completion date: 10 August 2027. Our page: Emaar Emerald Hills.

Emaar Marbella, Sectors 65 and 66

Three live registrations: Marbella Phase 2 villas, RERA-GRG-755-2020 (completion 31 December 2027); Marbella Phase 7, RERA-GRG-2230-2026, registered 5 August 2026 (completion 31 December 2026); and Marbella Terraces, RERA-GRG-2228-2026, registered 25 June 2026 (completion 31 December 2031). HRERA’s page for Marbella Terraces says it was earlier named Marbella Phase 5 and covers about 20.24 acres of a licensed residential plotted colony. Our pages: Emaar Marbella and Marbella Terraces.

Smartworld The Edition and BPTP Downtown 66, Sector 66

Smartworld The Edition (promoter Etsy Realcon Pvt Ltd) is RERA-GRG-1395-2023, completion 1 February 2031. BPTP’s Downtown 66 is RERA-GRG-2009-2025, registered 19 September 2025, completion 31 October 2032. Sector 66 is named on the route. Our pages: Smartworld The Edition and BPTP Downtown 66; sector guide Sector 66 Gurgaon, Gurgaon.

How to verify a GCER project on HRERA before you book

  • Open haryanarera.gov.in, go to Registered Projects, choose Gurugram and search the RERA-GRG number. The row shows promoter, location and the RERA completion date.
  • Open the project page and read the registration certificate, the approved building plan and the quarterly progress report.
  • Match the promoter name on HRERA (often an SPV such as Olive Realcon or Avarna Projects LLP) with the name on your allotment letter and agreement for sale.
  • Pay only into the project’s RERA collection account named on the HRERA page.
  • Treat the builder’s possession date and the RERA completion date as two different promises; the RERA date is the legal one.