Yes, in some cases. If the property already had a khata in the old manual registers, its e-khata is generated from those records and the occupancy certificate (OC) is not asked for. If you are applying for a new khata on the Greater Bengaluru Authority (GBA) e-Aasthi portal, an A-khata needs an approved building plan and an OC. Without them the portal issues only a B-khata, and only where the BESCOM connection and the sale deed are dated on or before 30 September 2024.

Updated 17 November 2026. We read the help text built into the GBA e-Aasthi portal, the GBA revenue chief's e-khata FAQ published by Citizen Matters, Deccan Herald's reports on the 2025 khata and OC rules, and Trilegal's note on the 5 June 2026 OC exemption. Most pages answer this with a flat yes or no. The portal shows the answer depends on which of its two routes you are on.

Does the e-Aasthi portal ask for an OC?

The portal has two routes. The OC question arises on only one of them.

  • Regular e-khata (existing khata): about 22 lakh manual khata records were digitised, and about 21.5 lakh draft e-khatas went online on 1 October 2024, roughly 15 lakh A-khata and 6.5 lakh B-khata, the then BBMP Special Commissioner (Revenue) told Citizen Matters in December 2024. His answer on OCs was: ‘Yes, you can apply for e-khata even without an OC.’ The A or B status comes from the register.
  • New Khata (property never had a city khata): the portal's eligibility note says you are considered for an A-khata if you have a valid building plan approval and a valid OC, and both must be uploaded with the application.
  • No plan and no OC: the portal says only a B-khata will be issued, and only for a building constructed before 30 September 2024, checked through the electricity meter connection.
  • Vacant plots: no OC question arises, but the portal says vacant plots are not eligible for B-khata. They can apply only for an A-khata.

What happens to a building without an OC?

For a New Khata on a building without plan approval or OC, the portal applies these tests, flat by flat or unit by unit:

  • Electricity: the BESCOM RR number is fetched from BESCOM, and the connection must have been issued on or before 30 September 2024. If the connection date is later, the system will not generate a B-khata for that flat or unit.
  • Sale deed: the deed must also be dated on or before 30 September 2024.
  • Names: the name on the BESCOM meter, the registered sale deed and the Aadhaar details must all match. Using someone else's BESCOM number is not permitted.
  • Deeds: a deed registered on or after 1 April 2004 is fetched from Kaveri by its number; an older deed has to be scanned and uploaded.

The cut-off is not new. Deccan Herald reported on 2 August 2025 that the Urban Development Department's notification of 25 July 2025 allowed B-khatas without plan approval or OC only for construction completed before September 2024, proven by a BESCOM connection, and that constructions after 30 September 2024 are not eligible.

Which buildings are exempt from the OC?

Small houses can be exempt, but the exemption is narrow. Our full explainer is OC Exemption in Bangalore 2026: Buying a House Without an OC. The essentials:

  • 2025: a government order exempted ground-plus-two or stilt-plus-three buildings on plots up to 1,200 sq ft, using Section 241(7) of the Greater Bengaluru Governance Act, 2024 (Deccan Herald, 10 September 2025, on an order issued the day before). Trilegal's note dates the earlier exemption to 13 October 2025, so sources differ on the date.
  • 5 June 2026: Notification UDD 334 MNY 2025 (Part) gave a one-time exemption to residential buildings on plots up to 2,400 sq ft, with up to 20% variance, and up to ground plus three or stilt plus four floors, in the five GBA city corporations (Trilegal, 1 September 2026).
  • Conditions, per Trilegal: the building must be complete, a power connection application must have been made on or before 31 May 2026, and the supply company must inspect and photograph the building before releasing the connection.
  • Limits: the exemption does not replace an approved building plan. Buildings without a sanctioned plan, and buildings on B-khata properties, fall outside it.

A gap no ranking page covers: the portal's published New Khata note still names plan approval plus OC as the A-khata test, and it does not say how an OC-exempt house is recorded. If your house is in this group, keep the sanctioned plan, the 2026 power-connection papers and the inspection record together, and ask the e-khata helpline or your Assistant Revenue Officer (ARO) before relying on an A-khata.

Does an e-khata mean the building is approved?

No. An e-khata is a property tax and ownership record. Whether a building is legal depends on its plan sanction and OC. The khata type tells you which side of that line the record sits on.

  • A-khata: the portal describes it as issued to properties fully compliant with planning and building rules, including an approved plan and OC, and eligible for legal transactions, bank loans and registrations.
  • B-khata: issued to properties that do not fully comply but meet cut-off conditions. The portal says it has restricted usage and does not confer full statutory compliance.
  • No regularisation: the GBA's December 2024 FAQ said e-khata does not regularise B-khata properties, and that khata is not issued for unauthorised constructions or floors beyond approved plans.
  • Zoning flags: under the July 2025 rules, a building that violates zoning rules or the Master Plan will have this noted on its A-khata (Deccan Herald, 2 August 2025).
  • OC and B-khata: Deccan Herald reported in September 2025 that OCs are not issued for B-khata sites.

Can a building without an OC get an A-khata later?

Usually only for the plot part. The portal's B-to-A FAQ says conversion covers vacant plots and the plot component of plots with buildings. Buildings without approved plans or OCs, including unauthorised multi-storey apartments, are not covered by that scheme. A Final e-khata is needed before you apply.

For apartments built without approvals, the July 2025 rules described by Deccan Herald need Section 17 approval under the Karnataka Town and Country Planning Act, 1961, then a building plan under Section 15, then an OC, before an A-khata can issue. On conversion fees and the 2027 window outside GBA, see B Khata to A Khata Conversion Till 2027: Bengaluru Guide and A-Khata, B-Khata and e-Khata in Bengaluru (2026): What a Buyer Must Check Now.

What should a buyer check?

  • Open the e-khata for the exact unit (steps at e-Khata guide, Bangalore) and read whether it is A or B. The word ‘e-khata’ alone tells you nothing about approvals.
  • Ask for the OC from the planning authority and match its floor and unit count with what is built. OC versus completion certificate: Occupancy Certificate vs Completion Certificate in Bengaluru: What to Demand Before You Take Possession
  • For a new flat, check the project's RERA registration through /rera-index and ask for the OC before registration. What the RERA mark shows: Rera Badge
  • For a resale unit on B-khata, check the BESCOM connection date and the seller's deed date against 30 September 2024. Resale checks: /resale
  • If a seller cites the OC exemption, ask for the sanctioned plan and the 2026 power-connection papers. A building without a plan is outside the exemption.
  • Have a lawyer read the title. No khata, A or B, is a title document.