A plot loan in Bengaluru is a housing loan for buying a residential site that you intend to build on. RBI allows banks to finance a plot only if the borrower declares an intention to build a house on it, within a period the bank sets. A composite loan covers the plot and the construction in one loan. SBI's plot product, SBI Realty, lends up to ₹15 crore and requires the house to be completed within 3 years of sanction or disbursement. Lenders typically fund about 70–75% of the plot's value (approx), and only for sites with clear approvals, an A-khata or e-khata, and a clean encumbrance record.
Updated 18 November 2026. We read RBI's Master Circular on Housing Finance, SBI's Realty product page and two ranking guides. Interest rates change often, so we give no bank rates. The EMI example below uses an assumed rate and is not a quote.
Plot loan, composite loan or construction loan: what's the difference?
- Plot loan: finances the site only. You must declare that you will build a house on it (RBI Master Circular). SBI Realty is an example.
- Composite (plot plus construction) loan: one sanction for the site and the house, with construction money released in stages. SBI lists a 'Combo Home Loan for plot purchase plus construction' (SBI).
- Construction loan: for building on a site you already own. SBI also allows a separate home loan for construction on a plot financed under SBI Realty.
- Ranking guides give plot-loan tenure of about 15 years and up to 30 years for home and composite loans (PropNewz, approx). SBI's own Realty page gives both 15 years and 10 years in different places, so confirm with the branch.
How much will a bank lend on a plot? RBI's LTV rules
RBI's Master Circular on Housing Finance (1 April 2022) sets these loan-to-value limits for individual housing loans:
- Loan up to ₹30 lakh: up to 90% of the property value (above 80% carries a higher risk weight for the bank).
- Loan above ₹30 lakh and up to ₹75 lakh: up to 80%.
- Loan above ₹75 lakh: up to 75%.
- Stamp duty, registration and documentation charges are not counted in the property cost, except for units costing up to ₹10 lakh.
- Where land is the collateral, it is valued at the current market price only.
- For plots, lenders often stay below these caps: about 70% (Uday Sagar Mortgage Broker, March 2026) or 70–75% of assessed land value (PropNewz). These are approximate market reports, not RBI limits.
What approvals do banks check for a site in Bangalore?
Lenders check the plot against the sanctioned layout (PropNewz) and usually ask for the sale agreement, sale deed, khata certificate, encumbrance certificate, property tax receipts and approved layout documents, plus a construction estimate and building plan approval for the construction part (Uday Sagar Mortgage Broker). Our checklist by layout type, built on our existing guides:
- BDA layouts: the allotment and possession papers and the BDA-approved layout. Background: BDA vs BMRDA vs BIAAPA Approved Layouts: Which Authority Governs Your Plot?.
- BMRDA or other planning-authority layouts: the approved layout plan, the land-use (DC) conversion order and the release of your site by the authority. What a site release order is: Site Release Order BMRDA: Which Bangalore Plots Can Be Sold. Approved projects: BMRDA Approved Plots in Bangalore 2026: Project List.
- Khata: an A-khata or e-khata in the seller's name. Uday Sagar says B-khata eligibility depends on lender policy; our guide: Home Loan on B Khata Property in Bangalore: What Banks Accept.
- Encumbrance certificate for the full period, and the RTC or survey records for converted land: Bangalore Property Survey Number, 11E Sketch and Podi Explained.
When must construction start or finish?
- RBI: the build must happen within the period the bank itself sets.
- SBI Realty: house completed within 3 years of sanction or disbursement (SBI).
- PropNewz reports HDFC requires construction to begin within 5 years of first disbursement (approx, not checked on HDFC's site today).
- RBI also says construction loans should be disbursed only after the borrower has the required government clearances, and that the borrower should get a completion certificate within 3 months of finishing, failing which the bank may recall the loan.
- Plan approval in Bengaluru: Nambike Nakshe 2.0: 30-Minute Building Plan Approval (2026).
Worked example: EMI on a plot loan
Illustration only, at assumed rates. A ₹50 lakh site, financed at 70% = ₹35 lakh, over 15 years:
- At 8.5% a year: EMI about ₹34,466; total interest about ₹27.0 lakh.
- At 9.0% a year: EMI about ₹35,499; total interest about ₹28.9 lakh.
- At 9.5% a year: EMI about ₹36,548; total interest about ₹30.8 lakh.
- Composite case: plot ₹50 lakh plus a ₹60 lakh build (for the build cost, see House Construction Cost in Bangalore per Sq Ft (2026)) is ₹1.10 crore. RBI's cap for loans above ₹75 lakh is 75%, so the maximum is ₹82.5 lakh. Over 20 years at an assumed 9.0%, the EMI is about ₹74,227. Your bank may lend less on the plot portion.
- Run your own numbers: /calculators.
Tax on plot loan interest
PropNewz says a land-only loan gets no interest deduction until the house is built, that pre-construction interest is then claimed in five instalments, and that the principal deduction starts only after construction. We could not confirm the current rules on an official tax page today, so check with a tax adviser before counting on any deduction. Our guide to the old and new regimes: Home Loan Tax Benefit 2026: Old vs New Regime, Bangalore.





