Pachgaon (also written Panchgaon) is a village south-west of Manesar where the KMP Expressway meets NH-48, the Delhi–Jaipur highway. Its pin code is 122413: India Post lists a Pachgaon branch office under the Bhorakalan sub office, not under Manesar’s 122051 or IMT’s 122052. Three projects make it a name to know: a planned Sector 56–Pachgaon metro (28 elevated stations, DPR with the Haryana government since July 2026), a new NH-48 toll plaza near Pachgaon to replace Kherki Daula, and the proposed Greater SPR towards NH-48.

Updated 18 November 2026. We checked India Post’s PIN data, the Tehsil Manesar collector list for 2026-27, DHBVN’s Gurugram contact list and the latest reports on the metro, the toll plaza and the Greater SPR, each with its date below.

Is it Pachgaon or Panchgaon?

Both spellings refer to the same place. India Post spells its branch office ‘Pachgaon’, and the Tehsil Manesar collector list writes ‘Pachgaon-Tauru road’. The metro project’s official name in Indian Infrastructure’s report is ‘Sector 56 – Panchgaon (Manesar) Metro Rail Project’. Swarajya and Native Planet use ‘Pachgaon’. Search both spellings when you look up notices.

What is the pin code of Pachgaon?

  • 122413: Pachgaon branch office, under Bhorakalan sub office. The same pin covers Bhorakalan, Bilaspur Khurd, Dhani Chitarsain, Moklawas, Pathreri and Sidhrawali.
  • 122051: Manesar branch office, NSG Camp Manesar and Kasan. Not Pachgaon.
  • 122052: IMT Manesar sub office. Not Pachgaon.

Status board: what is planned at Pachgaon?

  • Sector 56–Panchgaon metro (DPR submitted): Haryana Mass Rapid Transport Corporation submitted the DPR to the Haryana government. It describes a 35 km network with 28 elevated stations, at a likely investment of ₹104.28 billion (₹10,428 crore); the Centre would bear about 10% and the state about 20% (Indian Infrastructure, 2 July 2026).
  • Same metro, earlier figures: Native Planet reported 35.2 km and ₹8,500 crore, with Kherki Daula and Pachgaon stations planned as RRTS interchanges and Sector 56 linking to the Rapid Metro (16 September 2025). We give the later DPR figure as current.
  • New NH-48 toll plaza (tender stage): NHAI floated a tender for a gantry-based multi-lane free-flow (MLFF) system at the proposed Kukdola plaza near Pachgaon, which will replace Kherki Daula about 12 km away. The Union transport ministry approved the relocation in May 2025. Technical bids were due to open on 23 October, with completion three months after the award. Kukdola and Bijwasan (Dwarka Expressway) will work as integrated plazas (Construction World, 6 October 2026).
  • Greater SPR (land acquisition): HSVP’s second phase runs from Sohna Road to the Delhi–Jaipur highway, with land in villages including Manesar, Nainwal, Naurangpur and Shikohpur (Daily Jagran, 17 December 2025). Togetherbuying names Pachgaon among places on the route (11 August 2026). The exact meeting point with NH-48 is not in the official phase description we found. See Greater Southern Peripheral Road Gurgaon: GSPR Route, Status.
  • KMP Expressway (operating): already passes through Pachgaon, giving links towards Faridabad and Palwal. See KMP Expressway Route Map: Gurgaon Exits, Toll and Speed Limit.

Where exactly is the new toll plaza: Pachgaon or Kukdola?

Reports use both names. Construction World’s tender report calls it the Kukdola toll plaza ‘near Pachgaon’ on the Delhi–Jaipur highway. Togetherbuying says the state approved relocating Kherki Daula ‘to Pachgaon’. Until the plaza opens, treat ‘Kukdola, near Pachgaon’ as the site named in NHAI’s tender. Tolls will follow NHAI’s annual fee notification. For the current Kherki Daula plaza and the NH-48 works, see NH 48 Gurgaon News 2026: Kherki Daula Toll Shift and Flyovers.

Is there a metro from Gurgaon to Manesar now?

No. There is no operating metro to Manesar or Pachgaon on 18 November 2026. The Sector 56–Panchgaon line is at DPR stage with the state government, and we found no report of final approval or a construction start. On the Gurgaon side, the line would start at Sector 56, where it is planned to link with the existing Rapid Metro. For the route and station list, see Sector 56 to Panchgaon Metro 2026: Route, 28 Stations, Status and /metro/gurgaon. For the separate Delhi–Gurgaon–Alwar RRTS, see Delhi Gurgaon Alwar RRTS 2026: Route, Status, Stations.

What should a buyer near Pachgaon check?

For RERA-registered homes in the wider Manesar belt, see Manesar, Gurgaon, Imt Manesar and New Gurgaon, Gurgaon.

  • Collector rate rule: the Tehsil Manesar list for 2026-27 says land on the Pachgaon–Tauru road is valued 10% higher, up to a depth of 2 acres from the road. We did not find a separate row named Pachgaon in the English text of the list, so ask the Manesar sub-registrar for your khasra’s row.
  • Planned projects are not built projects: do not pay a premium for a metro or toll plaza that is still at DPR or tender stage.
  • Land use: farmland near the junction needs a change of land use before building. Read Jamabandi Meaning: Read a Gurgaon Khewat, Khatoni, Khasra Nakal.
  • Power: DHBVN complaints on 1912. Its Gurugram-I list has a Bhorakalan sub-division (0124-2379527) and a Manesar sub-division (0124-2337209); your bill shows which serves you.
  • Police: the CJM Gurugram allocation order names Manesar, IMT Manesar and Bilaspur police stations in this belt. Emergency: 112.