The Faridabad–Gurgaon Road is a 33.1 km state toll road through the Aravalli hills, linking Gurgaon with Faridabad via Gwal Pahari and Bandhwari. Its toll plaza is at Bandhwari. From 1 July 2024 a car paid ₹40 one way and ₹60 for a return within 24 hours, with a ₹800 monthly pass for local non-commercial cars. On 3 July 2026 the state said toll collection would continue ‘until further orders’. There is no metro on the road; a Gurugram–Faridabad–Noida Namo Bharat line is at the DPR stage.

Updated 18 November 2026. We read The Tribune’s 2024 reports on the toll rates, the June and July 2026 reports on the toll’s status, the 2026 reports on the Namo Bharat corridor, Gwal Pahari’s row in the official collector list and the HRERA register for projects along the road. The operator’s own toll page was behind a bot check today, so we could not confirm whether rates changed after July 2024.

Where does the Faridabad–Gurgaon Road run?

OpenStreetMap names the road ‘Faridabad-Gurgaon Road’ from the Sector 42 area of Gurgaon eastwards, past Gwal Pahari and the Bandhwari plaza in the Aravalli hills, into Faridabad. The Tribune puts the toll corridor at 33.10 km, managed by the state PWD (B&R), with GF Toll Road Private Ltd as the operating company. On OSRM routing, Bandhwari to Gwal Pahari is about 5.5 km, and Gwal Pahari to Millennium City Centre metro about 10.6 km.

What is the Bandhwari toll plaza rate?

Rates reported by The Tribune when the July 2024 revision took effect (latest we could verify):

  • Car, jeep, pick-up van or station wagon: ₹40 one way (was ₹30); ₹60 return within 24 hours.
  • Monthly pass, non-commercial car: ₹800.
  • Monthly pass, commercial car: ₹1,200.
  • The same rates apply on the Sohna–Ballabhgarh toll road (33.98 km), also run by the PWD.
  • Traffic: at least 50,000 vehicles a day use the two toll roads together (Tribune, 2024).
  • FASTag: the PWD said in July 2024 that FASTag was due to be introduced shortly at Bandhwari. Carry a card or UPI as a back-up.
  • Check the rate board at the plaza: we could not open a 2025 or 2026 rate notice.

Is the Bandhwari toll being removed in 2026?

Not as of the latest reports. In July 2024 The Tribune reported that the PWD would keep running the plaza until May 2026. In June 2026, residents and village representatives held a panchayat at the plaza asking for removal or relief for local users. Then on 3 July 2026, news24 reported that toll collection at Bandhwari, Pakhal, Ghamroj and Manesar would continue past 2 July ‘until further orders’, quoting a Gurugram PWD official. Any change will come by a government order, so treat social-media claims of ‘toll free from’ dates with care.

Is there a Gurgaon to Faridabad metro?

Not yet. The plan that is furthest along is a Namo Bharat (regional rail) corridor, not a metro line on this road:

  • Route: Gurugram to Greater Noida via Faridabad, about 63 km, ₹19,390 crore (Business Today, 30 June 2026).
  • Namo Bharat stations named in Gurugram: IFFCO Chowk, Sector 61 and Gwal Pahari; in Faridabad: Sainik Colony, Bata Chowk and Sector 87-88 Junction.
  • Extra metro-style stations proposed by HMRTC (Swarajya, 21 March 2026): eight in Gurugram and ten in Faridabad, including Sector 29, Millennium City Centre, Sector 52, Wazirabad and Sector 57.
  • Stage: NCRTC has submitted the DPR to HMRTC; it awaits approvals. No construction date is confirmed.
  • For all Gurgaon lines, see /metro/gurgaon.

Which Gurgaon sectors and projects are along this road?

On the Gurgaon side the road runs near the Golf Course Extension Road belt and through Gwal Pahari, which HRERA records place in Sector 2. HRERA lists several registered projects in ‘Village Gwal Pahari, Sector 2’, including Adani’s Lushlands (GGM/837/569/2024/64, registered 14 June 2024) and Veris (GGM/943/675/2025/46, registered 1 May 2025), The Billionaire Residences (GGM/793/525/2024/20) and The Manor (GGM/811/543/2024/38). See Adani Veris, Sector 2 Gurgaon, Gurgaon, Sector 58 Gurgaon, Gurgaon and Golf Course Extension Road, Gurgaon.

Collector rates for Gwal Pahari village land (Wazirabad list, 2026-27): agricultural chahi ₹6.40 crore per acre (up 30%), banjar ₹3.59 crore per acre, gair mumkin ₹7.20 crore per acre (up 60%).

What should you check before buying along the Faridabad road?

  • Land status: much of the Aravalli belt has forest and land-use restrictions. Ask for the project licence and, for any plot or farmhouse, check with the Divisional Forest Officer, Gurugram, that the khasra is not under a forest notification.
  • RERA: for a new home, check the HRERA registration number and validity on the project page.
  • Commute cost: a daily return at ₹60 is about ₹1,320 a month over 22 working days; the ₹800 monthly pass (2024 rate) is cheaper if you qualify.
  • Traffic: The Tribune has reported long peak-hour queues near the plaza. Drive the route at your office time before you decide.
  • Compare nearby homes on Golf Course Extension Road.