NICE Road is Bengaluru’s tolled semi-ring road on the south and west of the city. Its Peripheral Road runs 40.8 km from Hosur Road at Electronic City to Tumakuru Road near BIEC, and a separate 8.1 km Link Road runs towards the city. It has eight interchanges: Hosur Road, Bannerghatta Road, Kanakapura Road, the Clover Leaf, Hosakerehalli, Mysuru Road, Magadi Road and Tumakuru Road. Tolls were last revised on 1 July 2026, when single-journey charges for two-wheelers and cars rose by at least 10%, depending on the stretch.
Updated 18 November 2026. We listed every interchange in order with nearby areas and metro stations, dated each toll table we could find, and checked the operator’s notices on the two-wheeler question that other guides get wrong. The operator’s website did not load for us, so check the toll plaza board or your FASTag statement for today’s exact charge.
What is the full form of NICE Road?
NICE stands for Nandi Infrastructure Corridor Enterprises, the company that built and runs the road as part of the Bangalore–Mysore Infrastructure Corridor (BMIC) project, under a concession agreement signed with the Karnataka government on 4 September 2000. Wikipedia and Deccan Herald’s July 2025 report use that name. Deccan Herald’s 1 July 2026 report on the latest toll notice calls it Nandi Economic Corridor Enterprises Limited, so you will see both names.
What are the NICE Road exits, in order?
From Hosur Road in the south-east to Tumakuru Road in the north-west, with the nearest areas and metro links:
- 1. Hosur Road junction at Electronic City: Electronic City, Hosur Road; Yellow Line (Electronic City station). See Electronic City, Bangalore.
- 2. Bannerghatta Road junction at Gottigere: Bannerghatta Road, Hulimavu; Pink Line terminal Kalena Agrahara, formerly called Gottigere. See Bannerghatta Road, Bangalore.
- 3. Kanakapura Road junction at Talaghattapura: Kanakapura Road; Green Line (Thalaghattapura, Silk Institute). See Kanakapura Road, Bangalore.
- 4. Clover Leaf intersection.
- 5. Hosakerehalli junction near Nayandahalli: Purple Line (Pantharapalya–Nayandahalli).
- 6. Mysuru Road junction at Kengeri: Kengeri, RR Nagar; Purple Line (Kengeri, Challaghatta). See Kengeri, Bangalore.
- 7. Magadi Road junction at Gollarahatti.
- 8. Tumakuru Road junction near BIEC: Green Line terminal Madavara (BIEC).
How much is the NICE Road toll for a car?
NICE revises tolls every 1 July. On 1 July 2026 two-wheeler and car charges went up by at least 10% depending on stretch and distance, rounded up to the next rupee (Deccan Herald, 1 July 2026, citing the NICE public notice). The reports we could open did not print the new segment-wise table. The last full segment table we could open is the one in force from 1 July 2023. Read it as a floor: rates rose again by ₹3–5 per single journey in July 2025, and by at least 10% in July 2026.
- Hosur Road – Bannerghatta Road: car ₹50; two-wheeler ₹25 (1 July 2023).
- Bannerghatta Road – Kanakapura Road: car ₹40; two-wheeler ₹15 (1 July 2023).
- Kanakapura Road – Clover Leaf: car ₹30; two-wheeler ₹10 (1 July 2023).
- Clover Leaf – Mysuru Road: car ₹25; two-wheeler ₹10 (1 July 2023).
- Mysuru Road – Magadi Road: car ₹55; two-wheeler ₹25 (1 July 2023).
- Magadi Road – Tumakuru Road: car ₹45; two-wheeler ₹15 (1 July 2023).
- Link Road: car ₹60; two-wheeler ₹20 (1 July 2023).
- Full Hosur Road – Tumakuru Road run in 2023: car ₹245, two-wheeler ₹100 (our sum of the six segments). Expect more today.
Are two-wheelers allowed on NICE Road?
Yes, on payment of toll. One popular guide (HexaHome, updated 19 August 2025) says two-wheelers are not permitted, but NICE’s own toll notices set and revise two-wheeler charges: ₹3–5 more per single journey from 1 July 2025, and at least 10% more from 1 July 2026 (Deccan Herald). Some sites also mention a night-time ban for two-wheelers; we could not find it in an official notice, so check the signboards at the toll plaza before riding late.
How far is NICE Road from Hosur?
NICE Road starts at Hosur Road in Electronic City, not in Hosur town. From Electronic City to Hosur is about 21 km in a straight line by our calculation; by road along Hosur Road (NH 44) it is longer. That stretch is not NICE Road. The Electronic City elevated expressway and the NH 44 section to the Tamil Nadu border are run by a different operator, Bangalore Elevated Tollway Pvt Ltd. From 1 July 2026, a car pays ₹100 for multiple journeys in a day on the flyover (₹1,960 for a monthly pass) and ₹60 for multiple journeys at the Attibele plaza, which is on the NH 44 stretch (Deccan Herald, 1 July 2026).
Which areas gain from NICE Road for home buyers?
NICE Road matters most if you live on one radial road and work on another, for example Kanakapura Road to Electronic City, or Mysuru Road to Bannerghatta Road, without going through the city centre. Factor the toll into your monthly cost the way you would fuel. For how NICE fits with the STRR, the Peripheral Ring Road and the 134 km road, read Bangalore Ring Roads Compared: STRR vs PRR vs 134-km Road. For Mysuru Road and Kengeri, see Bangalore Mysore Expressway Exit Points Near Kengeri, Bidadi.
RERA-registered projects in our catalogue close to NICE junctions include Provident Equinox 4 and Century Central.





