Bangalore has three open metro interchange stations on 17 November 2026: Nadaprabhu Kempegowda Station, Majestic (Purple and Green Lines), Rashtreeya Vidyalaya Road (Green and Yellow Lines) and Jayadeva Hospital (Yellow and Pink Lines). Jayadeva became the third when the Pink Line’s elevated stretch opened to the public at 6 am on 14 November 2026. Another five interchanges are being built on lines that are under construction, and nine more are planned on the approved Orange Line and the proposed Red Line.
Updated 17 November 2026. We checked the Pink Line opening reports of 11–14 November 2026, BMRCL’s upcoming-projects page, the Union Cabinet approvals for Phase 2A/2B (April 2021) and Phase 3 (August 2024) as reported, the latest Blue Line trial and target reports (10 November 2026), K-RIDE’s May 2026 suburban rail newsletter and Wikipedia’s station list. Each status below carries its source. Dates for lines not yet open are targets, not promises.
Which Bangalore metro interchanges are open now?
The Pink Line opening took the operational network from 96.1 km to 103.6 km (Metro Rail News, 13 November 2026). Fares on the new stretch were to be notified by BMRCL, so check the Namma Metro app for the fare of a journey that changes at Jayadeva.
- Majestic (Nadaprabhu Kempegowda Station): Purple and Green Lines. Open; Purple side since 29 April 2016, Green side since 18 June 2017 (Wikipedia station list).
- Rashtreeya Vidyalaya Road (RV Road): Green and Yellow Lines. Open; Yellow Line inaugurated 10 August 2025 (Wikipedia).
- Jayadeva Hospital: Yellow and Pink Lines. Open; Pink Line inaugurated 13 November 2026, public service from 6 am on 14 November 2026 (PTI via The Federal; Metro Rail News). Station guide: Jayadeva Interchange Bangalore: Yellow-Pink Metro Station Guide
Which interchanges are under construction?
Target dates: BMRCL’s target for the Blue Line’s Outer Ring Road section (Silk Board to KR Puram) and the Pink Line underground section is May 2027, subject to safety checks and clearances (Urban Acres, 10 November 2026). Swarajya’s report the same day gave mid-2027 for Silk Board to KR Puram and March 2028 for the full 58.19 km Blue Line to the airport.
- MG Road: Purple Line (open) and Pink Line underground (under construction). The minister said on 14 November 2026 the government would extend the Pink Line to MG Road and then Nagawara (IANS via NewKerala).
- Krishnarajapura (KR Puram): Purple Line (open since March 2023) and Blue Line Phase 2A. Trial trains ran through KR Puram from the Baiyappanahalli depot to Doddanekundi on 10 November 2026 (Urban Acres). Guide: KR Puram Metro Station Bangalore: Purple-Blue Interchange Guide
- Central Silk Board: Yellow Line (open) and Blue Line. The two stations are about 250 m apart; BMRCL tendered a ₹58.99 crore travelator and walkway in April 2026 (Oneindia). Guide: Silk Board Metro Station Bangalore: Yellow-Blue Interchange Guide
- Nagawara: Pink Line underground terminus and Blue Line Phase 2B, plus a Mallige Line suburban station (K-RIDE). Guide: Nagawara Metro Station Bangalore: Pink-Blue Interchange, Homes
- Dairy Circle: Pink Line underground; listed as a future Red Line interchange (Wikipedia).
Which interchanges are planned on the Blue, Orange and Red Lines?
Status of the planned lines. Phase 3 (Orange Line, JP Nagar 4th Phase to Kempapura, 32.15 km with 22 stations, plus Hosahalli to Kadabagere, 12.5 km with 9 stations) was approved by the Union Cabinet on 16 August 2024 at ₹15,611 crore (The Metro Rail Guy). On 11 November 2026 the state minister said the aim is to finish tendering and begin work within six months (PTI via The Week). The Red Line (Phase 3A, Sarjapur to Hebbal) is listed by BMRCL at 36.59 km with 28 stations and a detailed project report under preparation; the minister described it as 37.8 km and awaiting Union approval. We show both figures because they differ.
- Hebbala: Blue Line (under construction), Orange Line (approved) and Red Line (proposed); six platforms planned (Wikipedia). Guide: Hebbal Metro Station Bangalore: Interchange, Status, Homes
- Kempapura: Blue Line and Orange Line terminus (Wikipedia; Phase 3 approval as reported by The Metro Rail Guy).
- NS Palya-JP Nagar 4th Phase: Pink Line (open since 14 November 2026) and the start of the Orange Line. Guide: JP Nagar 4th Phase Metro Bangalore: Pink Open, Orange Line Status
- Jaya Prakash Nagar: Green Line and Orange Line (Wikipedia).
- Mysuru Road: Purple Line and Orange Line (Wikipedia).
- Peenya: Green Line and Orange Line (Wikipedia).
- Hosahalli (Sri Balagangadharanatha Swamiji Station): Purple Line and the Hosahalli–Kadabagere corridor of Phase 3 (Wikipedia).
- Agara and Ibbaluru (InMobi Ibbaluru): Blue Line and the proposed Red Line (Wikipedia). Ibbaluru guide: Ibbaluru Metro Station 2026: Blue-Red Interchange, Homes Nearby
- Marathahalli: Blue Line only for metro, but it is also an elevated station on the Kanaka suburban line (K-RIDE, May 2026). Guide: Marathahalli Metro Station Bangalore: Blue Line Status, Homes
Where does the metro meet suburban rail?
K-RIDE’s Bengaluru Suburban Rail Project adds rail-to-metro interchange nodes. These are planned, not open.
- Benniganahalli: Purple Line, Mallige Line (Corridor 2) elevated interchange station, and Kanaka Line (Corridor 4). K-RIDE says the Kanaka viaduct runs directly below the Blue Line viaduct for about 0.5 km near the Benniganahalli flyover (May 2026 newsletter).
- Nagawara and Hebbal: Mallige Line stations in K-RIDE’s C2A station package, alongside the metro stations (May 2026 newsletter).
- Yeshwanthpur: an elevated interchange for Corridors 1 and 2 under the C2B package (May 2026 newsletter).
- KSR Bengaluru and Srirampura: Sampige Line (Corridor 1) stations listed as Purple and Green Line interchanges (Wikipedia).
- Yelahanka: Kanaka Line elevated station and a Sampige Line station (K-RIDE; Wikipedia).
How should a homebuyer read an ‘interchange’ claim?
- Ask which lines are open today. Only Majestic, RV Road and Jayadeva let you change trains now.
- Check whether the change is inside one station or needs a walk outside. Silk Board is two stations about 250 m apart until the walkway is built.
- Treat Orange and Red Line interchanges as long-term. Phase 3’s deadline is reported as 2032 (The Hans India, 22 April 2026), and Phase 3A is still at the approval stage.
- Measure the walk from the project gate to the station entry, not to the ‘metro corridor’. Our station pages: /metro/bengaluru and Metro Stations Bangalore
- Read the evidence on metro price effects before paying a premium: Does a Metro Really Raise Property Prices? The Evidence, and the Bengaluru Caveats
Homes near open interchange stations
Total Environment Learning To Fly is on the Ring Road near Jayadeva Hospital in JP Nagar; it is complete, with a first occupancy certificate dated 5 December 2023 (K-RERA PRM/KA/RERA/1251/310/PR/171014/000270). Details: Total Environment Learning To Fly. For the Hebbal and KR Puram areas, see Hebbal, Bangalore and Kr Puram, Bangalore.