To increase your sanctioned load with DHBVN in Gurgaon, apply on econnection.dhbvn.org.in and choose “Extension of Load” under “Application For”. DHBVN's charges PDF says you must deposit the Advance Consumption Deposit on the additional load: ₹750 per kW for a home. So going from 5 kW to 8 kW means a ₹2,250 deposit, plus processing and any meter or line charges in your demand notice. The bigger cost is often the tariff. Under the FY 2026-27 schedule, a home above 5 kW pays ₹6.50 per unit from the first unit and ₹75 per kW a month in fixed charges.
Updated 18 November 2026. We opened DHBVN's live application form, its “Charges for New Connections” and “Connected load calculation” PDFs, the Right to Service (RTS) timelines notification, and Sales Circular D-06/2026, which applies the HERC tariff order of 25 March 2026 from 1 April 2026. HERC's own website did not load on 18 November 2026, so the tariff is taken from DHBVN's circular.
When do you need a DHBVN load extension?
- You add a third or fourth AC, a second geyser, or a lift in a builder floor or independent house.
- You install a home EV charger. DHBVN's load rules don't name EV chargers, so declare the charger's nameplate rating.
- You add a floor or convert a single-phase supply to three-phase.
- The meter or DHBVN's “Load Graph” in your online account shows demand regularly above the sanctioned load.
- Flat owners in single-point societies do not apply to DHBVN. Their load is set by the society or developer's sub-meter; see Single Point Connection Gurgaon: DHBVN Society Power Rules 2026.
How do you work out the load you need?
DHBVN's “Procedure for Determination of Connected Load” sets the counting rules for homes:
- Light points: 11 W each, counting 50% of points (rounded up). Fan points: 60 W each, counting 50%.
- ACs: full rating for up to two ACs; with more than two, 70% of the total rating of all ACs.
- Geysers: the same rule, full rating for up to two and 70% of the total above that.
- 5 A sockets: 200 W each, counting one-third. 15 A sockets (other than AC or geyser points): 1,000 W each, counting one-third.
- Any other motive load, such as a central AC plant, is added at its rating.
Example: a home with three 2 kW ACs (70% of 6 kW = 4.2 kW), two 2 kW geysers (4 kW), 30 light points (15 × 11 W = 0.17 kW), 8 fan points (4 × 60 W = 0.24 kW) and 12 small sockets (4 × 200 W = 0.8 kW) totals about 9.4 kW. Add a 7 kW-class EV charger and the figure passes 16 kW. Appliance ratings here are illustrative; use your own nameplates.
How do you apply for a load increase online?
- Open econnection.dhbvn.org.in, click “Apply for New Connection”, set Applicant Type “Consumer” and Application For “Extension of Load”.
- Enter your 10-digit account number, then verify with your Family ID or Aadhaar OTP.
- Enter the new total connected load in kW. Above 5 kW, plan for a three-phase supply.
- Upload a photo, proof of ownership, ID and a fresh wiring test report from a licensed electrical contractor (the form's declaration requires tested wiring).
- Pay the demand within the deadline. The portal states that charges must be paid within 7 days of applying or the application is cancelled.
- To lower the load, use “Reduction of Load” on the same form.
What are the DHBVN load extension charges per kW?
DHBVN's charges PDF spells out one item for extensions: the ACD of ₹750 per kW (or part of a kW) on the extra load. The other one-time items in the same schedule apply when your demand notice includes them:
- Processing fee: ₹50 up to 2 kW; ₹25 per kW above 2 kW in the table (the PDF's example uses ₹50 per kW, so check your notice).
- Three-phase meter security ₹1,430, three-phase MCB ₹350, testing ₹330 and installation ₹200, if a single-phase meter is replaced.
- Fixed service connection charge: ₹1,000 per kW for three-phase domestic supply above 5 kW. The PDF doesn't say whether this applies to the whole load or only the added kW on an extension, so your demand notice decides.
- Network augmentation is outside these charges and is billed only if your local network needs work.
How does a higher load change your monthly bill?
This is where most people get surprised. The FY 2026-27 domestic tariff in Sales Circular D-06/2026 has three bands:
- Category I (up to 2 kW, low use): ₹2.20 per unit for 0–50 units and ₹2.70 for 51–100 units; no fixed charge.
- Category II (up to 5 kW): ₹2.95 for 0–150 units, ₹5.25 for 151–300, ₹6.45 for 301–500, ₹7.10 above 500, plus ₹50 per kW a month in the 301–500 and above-500 slabs.
- Category III (above 5 kW): ₹6.50 for 0–500 units, ₹7.15 for 501–1,000, ₹7.50 above 1,000, plus ₹75 per kW a month in every slab.
Worked example at 400 units a month. At 5 kW (Category II), energy is ₹442.50 + ₹787.50 + ₹645 = ₹1,875, plus a ₹250 fixed charge, so ₹2,125. At 6 kW (Category III), energy is 400 × ₹6.50 = ₹2,600, plus a ₹450 fixed charge, so ₹3,050. Same usage, about ₹925 more a month, before electricity duty, municipal tax and fuel surcharge (which the circular says are extra). If you are close to 5 kW, trim the declared load before you extend it. If you clearly need more, the extension is cheaper than unauthorised load.
Prepaid smart-meter users get a 5% rebate on both energy and fixed charges under the same circular. Our smart meter guide covers that.
How long does a load extension take?
DHBVN's RTS notification groups “release of new connection/additional load/demand” together: 30 days from a complete application, charges and documents where the existing network can supply, and 71 days for LT connections needing network expansion. Converting single-phase to three-phase is listed at 30 days from payment. If the deadline passes, escalate to the SDO and then the XEN (Operation) named in the notification, or call 1912.