In a single-point connection, DHBVN supplies the whole society or colony through one high-tension connection at 11 kV or higher, and the society or developer owns and runs the internal network and the flat meters. For 2026–27 DHBVN bills that connection under ‘Bulk Supply (Domestic)’: 580 paise (₹5.80) per unit where monthly use is up to 800 units per flat, 660 paise (₹6.60) per unit above that, plus a fixed charge of ₹150 per kW per month of recorded demand. With an individual connection, your flat has its own DHBVN meter and you pay the domestic tariff directly.
Updated 17 November 2026. We read DHBVN's Sales Circular D-06/2026 (dated 13 May 2026) carrying HERC's FY 2026–27 tariff, DHBVN's category-of-supply note, its new-connection documents and timelines, and its list of 2026 circulars. The HERC website did not respond today, so the regulation is quoted as DHBVN states it; check herc.gov.in for any later amendment.
Single-point vs individual DHBVN connection: what is the difference?
- Single point: one HT connection at 11 kV or above for the whole colony or group housing society; distribution inside ‘shall be owned and managed by the Colony / Group Housing Society’ (DHBVN). You pay the society or its agency, not DHBVN.
- Which rule: DHBVN applies Bulk Supply (Domestic) to colonies and group housing societies covered by the HERC (Single Point Supply to Employers' Colonies, Group Housing Societies and Residential or Commercial cum Residential Complexes of Developers) Regulations, 2013 that opt for single-point supply, and to other societies that opt in.
- Common areas: lifts, pumps and other common facilities can be billed at the bulk domestic rate only up to 17.64% (15 × 100 ÷ 85) of the total residential load. Any common load above that, and any shop or commercial load, is billed at the non-domestic rate.
- Individual connection: DHBVN meters and bills each flat, and you apply to DHBVN yourself.
- For the separate 2026 news on a parallel distribution licence in Gurugram, see Eleven Power Gurugram: Second Power Supplier Licence, Explained.
What are the DHBVN rates for 2026–27?
HERC approved the 2026–27 tariff on 25 March 2026, effective 1 April 2026 (DHBVN circular D-06/2026). The rates that matter to flat owners:
- Bulk Supply (Domestic), up to 800 units per flat per month: 580 paise per kWh + ₹150/kW/month of recorded demand.
- Bulk Supply (Domestic), above 800 units per flat per month: 660 paise per kWh + ₹150/kW/month of recorded demand.
- Prepaid smart meters: 5% rebate on both fixed and energy charges for consumers on prepaid smart meters, under Regulation 5 of the HERC (Prepaid Smart Metering) Regulations, 2022.
- The tariff excludes electricity duty, municipal tax and fuel surcharge adjustment, which are added on the bill.
- Individual domestic slabs are in the same circular; the scanned table was too unclear to quote reliably here, so read them on DHBVN's site before comparing.
How do I check what my society charges me?
- Ask for the society's latest DHBVN bill and its per-unit rate to residents. Compare it with the 2026–27 bulk rates above plus duties.
- Ask how common-area load is split and whether any part is billed at the non-domestic rate because it exceeds 17.64%.
- Ask whether flat meters are prepaid; if DHBVN's 5% prepaid rebate does not apply to your society's meters, ask how the society prices prepaid units.
- Get the DG (power backup) rate in writing: we found no HERC or DHBVN figure for DG backup charges, so it is set in your maintenance agreement. Ask for the per-unit DG rate, the fixed backup charge per kVA and how often they are revised.
How do I apply for a new DHBVN connection or change the name?
- Apply online at econnection.dhbvn.org.in (linked from dhbvn.org.in as ‘New Connection’).
- Proof of ownership or legal occupation: sale deed, allotment letter, lease or rent deed, or property tax receipt/demand notice with proof of tenancy.
- Proof of identity: any one of voter ID, passport, driving licence, ration card, government photo ID, PAN or Aadhaar. Companies apply through an authorised signatory with a board resolution.
- DHBVN timelines: acknowledgement within 2 days; site inspection within 7 days; demand notice within 7 days for LT (14 days at 11 kV); release within 3 days for LT after the work is done.
- Name change after resale: check DHBVN's connection-related instructions or ask at your sub-division office; in a single-point society, the society updates its own records instead.
What should a buyer ask before buying a flat?
- Is the society on single-point supply or individual DHBVN meters?
- What is the sanctioned load per flat, and what does it cost to raise it?
- What is the per-unit resident rate today, and what is the DG backup rate?
- Are there pending electricity dues on the flat? Ask for a no-dues letter from the society or DHBVN.
- Include these costs when you compare total ownership cost; see /calculators/gurgaon-total-cost and Gurgaon property tax calculator.