In DHBVN's area, including Gurgaon, a smart meter does not have to run in prepaid mode. DHBVN's own new-connection form asks you to pick a “Smart Meter Type”, either PREPAID or POSTPAID. On 2 April 2026, the Union Power Minister told the Lok Sabha that prepaid smart meters are not compulsory. If you choose prepaid, the FY 2026-27 tariff gives a 5% rebate on both energy and fixed charges. The widely shared July 2026 story about smart meters switching back to postpaid with a fresh security deposit was about Ghaziabad in Uttar Pradesh, not DHBVN.

Updated 18 November 2026. We opened DHBVN's live application form and smart-meter portal link, Sales Circular D-06/2026 (tariff), DHBVN's charges and RTS notifications, the All India Radio report of the minister's statement, a report on the Central Electricity Authority's 1 April 2026 metering amendment, and the news stories that rank for this search, checking which state each one is about.

Is a prepaid smart meter compulsory in Gurgaon?

  • DHBVN's application form at econnection.dhbvn.org.in has a required “Smart Meter Type” field with two options: PREPAID and POSTPAID.
  • Union Power Minister Manohar Lal told the Lok Sabha on 2 April 2026 that prepaid smart meters are “not compulsory for all consumers” (All India Radio News).
  • A report dated 7 April 2026 says the Central Electricity Authority's 1 April 2026 amendment to the meter installation and operation regulations removed the mandatory prepaid billing requirement, keeping prepaid as an optional feature.
  • Haryana keeps the incentive: Sales Circular D-06/2026 notes a 5% rebate on fixed and energy charges for consumers on prepaid smart meters, under Regulation 5 of the HERC (Prepaid Smart Metering) Regulations, 2022.

What was the 2026 ‘back to postpaid’ security deposit news?

A Business Today report of 28 July 2026 described about 2.45 lakh smart-meter households being asked for a fresh security deposit of ₹400 per kW in four instalments after prepaid meters were scrapped. The officials quoted are from Zone-I, Ghaziabad. It is an Uttar Pradesh story, not a DHBVN rule. We found no DHBVN circular among its 2026 sales circulars announcing a similar switch.

For DHBVN consumers, the deposit that applies is DHBVN's own Advance Consumption Deposit: ₹750 per kW for domestic connections in its charges schedule. DHBVN pays 5.50% a year interest on consumption security deposits for FY 2026-27 under Sales Circular D-08/2026.

How far has the smart meter rollout reached?

  • Gurgaon: DHBVN's website hosts the detailed project reports for its Smart Grid Project in Gurgaon city, including sectors 1 to 57, and links a dedicated “Smart Meter Portal”.
  • An August 2023 trade report said about 2.5 lakh consumers had smart meters under DHBVN's smart grid project, and only about 650 of 3.7 lakh city consumers had chosen prepaid. That was the position in 2023; we found no newer official count.
  • Faridabad: a Tribune report of 8 July 2024 put DHBVN's target at about 5.30 lakh old meters to be replaced. It said the Rs 5,000–7,000 cost per meter is borne by DHBVN, not the consumer.
  • Defective meters: during the FY 2026-27 tariff hearing, HERC flagged over one lakh defective meters across DHBVN's area, and DHBVN said a new procurement tender had been placed (The Tribune, 26 February 2026).

How do you recharge or track a DHBVN smart meter?

DHBVN's homepage links a “Smart Meter Portal” (dhbvn.eeslsmartmeter.in), and the e-connection portal links the DHBVN mobile app on Android and iOS. Log in with your 10-digit account number and the OTP on your registered mobile. Your online account also shows bill summary, consumption history and a load graph, which helps you spot unusual use before a bill arrives. If your mobile number has changed, DHBVN asks you to call 1912 or 1800-180-4334 to reset the account.

What should you do if the smart meter bill looks high?

  • Compare the reading on the meter display with the bill and the app's daily consumption. A single spike is often a billing estimate, not the meter.
  • Check the tariff band. Homes above 5 kW pay ₹6.50 per unit from the first unit plus ₹75 per kW a month. Homes up to 5 kW pay ₹2.95 for the first 150 units. A load extension can change your bill even if usage hasn't.
  • Register a complaint on 1912, WhatsApp 8813999708 or DHBVN's grievance portal and ask for a meter test. DHBVN's RTS notification commits to inspecting and checking a meter within 7 days of receiving the meter testing fee, and to replacing slow, fast, stuck or defective meters within 7 days. DHBVN's charges schedule lists meter testing at ₹90 (single-phase) and ₹330 (three-phase).
  • If it stays unresolved, take it to the Consumer Grievance Redressal Forum. DHBVN's ‘Procedure & Forms’ page has the grievance form and the Ombudsman representation form.

Prepaid or postpaid: which suits a Gurgaon home?

Prepaid saves 5% on the full energy and fixed charge and shows daily use, which suits tenants, second homes and anyone budgeting tightly. Postpaid avoids sudden disconnection if a top-up is missed, which matters more for homes with elderly residents or medical equipment. Either way, the meter hardware is the same smart meter. Society flats on single-point supply follow the society's or developer's sub-metering system instead; see Single Point Connection Gurgaon: DHBVN Society Power Rules 2026. For context on supply disputes this year, see Gurugram Power Strike October 2026: Outages and the Licence, and for water, Smart Water Meters Gurugram: MCG's Sector 45 Pilot (2026).