Nagawara metro station is not open on 17 November 2026. It will be the northern terminus of the Pink Line, whose underground section BMRCL is targeting for May 2027, and a stop on the Blue Line’s KR Puram–Hebbal section, targeted for mid-2027 to late 2027 with the full Blue Line in March 2028. Nagawara is also a station on K-RIDE’s Mallige suburban line, so it is planned as a three-system transfer point.
Updated 17 November 2026. We checked BMRCL’s May 2027 target as reported on 10 November 2026, Construction World’s Blue Line section targets, the February 2026 progress report on the station, the November 2025 report on the commercial complex, K-RIDE’s May 2026 newsletter and Wikipedia’s station record. For the underground Pink Line as a whole, see Pink Line Underground: 12 Stations, Trials, March 2027 Target; this guide covers only Nagawara.
Where is Nagawara metro station and how is it built?
The station is at Nagawara Junction on the Outer Ring Road, near HBR Layout, Thanisandra and Hebbal (Wikipedia). The Pink Line platforms are underground with the concourse at ground level, and the Blue Line station is elevated. Swarajya’s November 2025 report said the two stations will have directly connected concourses for airport-bound passengers.
BMRCL is also building a four-storey commercial complex of 23,392.24 sq m above the Pink Line station on nearly six acres, with a 3,225.73 sq m multi-level parking block next to it (Swarajya, 22 November 2025). A proptech blog published on 13 November 2026 puts the complex at about 27,000 sq m; we use the earlier report’s exact figure.
When will Nagawara metro open?
- Pink Line (underground terminus): BMRCL target May 2027 for the underground corridor, subject to safety checks and clearances (Urban Acres, 10 November 2026). In February 2026 a BMRCL engineer said the underground station was about 98% complete (Oneindia, 9 February 2026); that report’s December 2026 target has since moved.
- Blue Line: Construction World (28 August 2026) gave mid-2027 for KR Puram to Nagawara and September or October 2027 for Nagawara to Hebbal and the airport, with the full line in March 2028. Wikipedia lists December 2027 to March 2028 for the Blue Line side.
- Minister’s view (11 November 2026): completing both Blue Line sections within 18 months is a challenging target (PTI via The Week).
- Mallige suburban line: Nagawara is in K-RIDE’s C2A station package, and a separate package awarded in April 2026 includes at-grade station boxes at Nagawara and Kanaka Nagar (K-RIDE, May 2026). No opening date was given.
Which stations are next to Nagawara?
- Pink Line: Kadugundanahalli is the next station south; the line runs on via Shivajinagar and MG Road to Dairy Circle and the open elevated stretch to Kalena Agrahara.
- Blue Line towards KR Puram: HBR Layout, Kalyan Nagar, HRBR Layout, Horamavu, Kasturinagara, KR Puram (6 stops).
- Blue Line towards the airport: Veerannapalya, Kempapura, Hebbal (3 stops), then eight more to KIAL Terminals.
How far is Nagawara metro from Manyata Tech Park?
BMRCL has not published a walking distance. The Blue Line stop built for Manyata is Veerannapalya, one stop north of Nagawara: it has a revised three-level design with a commercial floor aimed at Manyata Tech Park employees (Oneindia, 9 February 2026). A proptech blog gives about 1.5 km from Nagawara station to Manyata but is inconsistent within its own text, so measure your route. Homes and offices around the park: Manyata Tech Park
RERA-registered homes around Nagawara, Thanisandra and Hennur
Our project pages do not yet give a measured distance to the Nagawara station entrance, so these are listed by locality only.
- Lodha Mirabelle, off Thanisandra Main Road near Manyata, Nagavara: under construction; developer listing gives June 2030. K-RERA PRM/KA/RERA/1251/309/PR/131023/006321 and PRM/KA/RERA/1251/446/PR/230425/007688; 3.5 to 5 BHK, price on request. Lodha Mirabelle
- In That Quiet Earth, off Hennur Main Road near Manyata: under construction, 61% per the Q2 2026-27 RERA report. K-RERA PRM/KA/RERA/1251/446/PR/180519/001745; ₹2.33 crore to ₹4.5 crore. In That Quiet Earth
- Brigade Bricklane, off Thanisandra Main Road (Jakkur/Thirumenahalli): completed, first occupancy certificate 10 October 2022. K-RERA PRM/KA/RERA/1251/309/PR/180808/001981; 1 and 2 BHK, ₹71.61 lakh to ₹1.25 crore. Brigade Bricklane
- Area pages and rates: Nagawara, Bangalore, Thanisandra, Bangalore, Nagawara
What should a Nagawara buyer check?
- Which side of the junction the entry you will use is on. The Pink concourse is at ground level; the Blue platforms are elevated.
- Whether your commute needs the Pink Line (south to MG Road) or the Blue Line (east to KR Puram, north to the airport). They open on different dates.
- The full area picture in our buyer’s guide: Nagawara, Bengaluru: Buyer's Guide 2026 — Prices, Metro, Projects and Risks