Hebbala metro station is not open on 17 November 2026. It is being built on the Blue Line, and the Nagawara–Hebbal–airport stretch was targeted for September or October 2027 in Construction World’s 28 August 2026 report, with the full Blue Line from Silk Board to the airport targeted for March 2028. Hebbal is also planned as the northern end of the Orange Line and the Red Line, and as a stop on the Mallige suburban rail line, which would make it one of the city’s largest transfer points.

Updated 17 November 2026. We checked the latest Blue Line target reports (28 August and 10–11 November 2026), BMRCL’s upcoming-projects page for the Red Line, the Phase 3 approval as reported, K-RIDE’s May 2026 newsletter for the Hebbal suburban station, Wikipedia’s station record and our own project pages for distances. None of the dates below is a confirmed opening.

Where exactly is Hebbal metro station?

Wikipedia gives the address as Vayunandana Layout, Hebbal Kempapura, Bengaluru 560024, and lists the Hebbala BMTC bus terminus as a connection. It is an elevated station. On the Blue Line its neighbours are Kodigehalli to the north (towards the airport) and Kempapura to the south (towards KR Puram and Silk Board).

Construction World reported that four elevated metro tracks are planned at Hebbal and that the work needs complex clearances along the Outer Ring Road. Wikipedia’s station record listed the status as casting of platform-level beams when we checked.

Which lines will stop at Hebbal, and when?

  • Blue Line (Phase 2B, KR Puram to airport via Hebbal): under construction. Construction World (28 August 2026): KR Puram to Nagawara expected by mid-2027; Nagawara to Hebbal and the airport in September or October 2027; full line March 2028.
  • Same Blue Line, newest comment: on 11 November 2026 the minister called completing the Silk Board–KR Puram and KR Puram–airport sections within 18 months a ‘challenging target’ (PTI via The Week).
  • Orange Line (Phase 3, JP Nagar 4th Phase to Kempapura and Hebbal): approved on 16 August 2024; the Phase 3 deadline is reported as 2032 (The Hans India, 22 April 2026). Not under construction yet.
  • Red Line (Phase 3A, Sarjapur to Hebbal): BMRCL lists 36.59 km and 28 stations, with a detailed project report being prepared; the minister said a 37.8 km proposal is awaiting Union approval.
  • Mallige suburban line (Corridor 2): Hebbal is in K-RIDE’s C2A station package; raft concrete was done at Hebbal station by May 2026 (K-RIDE newsletter). K-RIDE gave no opening date in that issue.

How will the interchange with rail work?

The Phase 3 approval, as reported by The Metro Rail Guy, lists Hebbal among 10 multi-modal integration points and promises direct links through foot overbridges or skywalks to two railway stations, Lottegollahalli and Hebbal. K-RIDE’s May 2026 newsletter also reports doubling works, a foot overbridge and a new platform at Hebbal railway station under its parallel projects. Exact walking routes between the metro and rail platforms have not been published, so do not assume a covered walk until the drawings are out.

Hebbal to the airport: how many stops?

From Hebbal heading north, the approved Phase 2B list has Kodigehalli, Jakkur Cross, Yelahanka, Bagalur Cross, Bettahalasuru, Doddajala, Airport City and KIAL Terminals, so the airport terminal is eight stops away (The Metro Rail Guy, Cabinet approval report of 20 April 2021). Heading south: Kempapura, Veerannapalya, Nagawara, HBR Layout, Kalyan Nagar, HRBR Layout, Horamavu, Kasturinagara and KR Puram. Station details for the airport stretch: Airport Metro Line Bangalore: 29 Stations, Oct 2026 Status

Homes within about 3 km of Hebbal metro station

Distances are straight-line figures from our project pages, checked on 17 November 2026. Walking distance will be longer.

  • Brigade Laguna, Hebbal: about 700 m from Hebbala station. K-RERA PRM/KA/RERA/1251/309/PR/170322/004775; 2 and 3 BHK; sold out with the builder, resale only. Brigade Laguna
  • Hiranandani Glen Gate, off Bellary Road near Kodigehalli: about 700 m from Hebbala station. K-RERA PRM/KA/RERA/1251/309/PR/171016/000952; ready to move; 2 and 3 BHK, indicative ₹1.98 crore to ₹2.88 crore. Hiranandani Glen Gate
  • Prestige Fairfield, RMV 2nd Stage, Sanjay Nagar (near Hebbal): ready to move. K-RERA PRM/KA/RERA/1251/309/PR/200211/003273; 3 to 4 BHK. Prestige Fairfield
  • Godrej Aveline, Yelahanka Airport Road: about 650 m from Jakkur Cross, two Blue Line stops north of Hebbal. K-RERA PRM/KA/RERA/1251/309/PR/020326/008501; new launch, RERA completion March 2031. Godrej Aveline

What should a Hebbal buyer do with these dates?