Jayadeva Hospital metro station is now an open interchange between the Yellow Line and the Pink Line. The Pink Line’s 7.5 km elevated stretch from Kalena Agrahara to SG Palya was inaugurated on 13 November 2026 and opened to the public at 6 am on 14 November 2026. Pink Line trains run every 8 minutes at weekday peak, and you change to the Yellow Line at Jayadeva for Silk Board, Electronic City or RV Road.
Updated 17 November 2026. We checked the inauguration reports (PTI, Metro Rail News, Swarajya), the published Pink Line timetable (13–14 November), the Centre’s approval of three station names (12 November), Wikipedia’s station and Yellow Line records and BMRCL’s stated average train speed. Our 8 November pre-opening guide (Jayadeva Interchange: Hulimavu to E-City and Silk Board) covers stop counts to Silk Board and Electronic City; this guide adds what changed on opening day.
Where is Jayadeva metro station and how is it laid out?
The station is at Jayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru 560076, on the Outer Ring Road beside Jayadeva Hospital (Wikipedia). It is a multi-level elevated station built after the old Jayadeva flyover was demolished in 2020, with the Yellow Line platforms on one level and the Pink Line platforms on a higher level. It has 12 entry and exit points, A to L, with lifts at B, E, H and K.
Jayadeva metro timings and frequency
- First Pink Line train, Monday: 4:55 am from Kalena Agrahara; 5:00 am from SG Palya.
- First train, Tuesday to Saturday: 6:00 am from both ends. Sunday: 7:00 am.
- Last train: 10:50 pm from Kalena Agrahara; 10:54 pm from SG Palya.
- Frequency: every 8 minutes at peak and about 10 minutes off-peak and at weekends, with four trains in service and one on standby. BMRCL said frequency may change with demand.
- The two timetable reports differ on Saturday: one says peak every 8 minutes Monday to Saturday, the other says every 10 minutes on Saturdays and Sundays. Check the Namma Metro app for Saturday travel.
- Fares: BMRCL was to notify Pink Line fares; we found no official fare table, so check the app before you travel.
Which stations were renamed?
The Centre approved three new names on 12 November 2026: IIMB is now Bilekahalli-IIMB, JP Nagar 4th Phase is now NS Palya-JP Nagar 4th Phase, and Tavarekere is now SG Palya (Suddaguntepalya). Station boards and the app use the new names, so older maps may not match.
How many stops from Jayadeva on each line?
- Pink Line north: SG Palya (1 stop). The underground section beyond, towards MG Road and Nagawara, is not open; BMRCL’s target is May 2027.
- Pink Line south: NS Palya-JP Nagar 4th Phase (1), Bilekahalli-IIMB (2), Hulimavu (3), Kalena Agrahara (4).
- Yellow Line north: Ragigudda (1), RV Road (2, Green Line interchange).
- Yellow Line south: BTM Layout (1), Central Silk Board (2), Bommanahalli (3), Hongasandra (4), Kudlu Gate (5), Singasandra (6), Electronic City (9), Delta Electronics Bommasandra (13).
- So Hulimavu to Silk Board is 5 stops with one change at Jayadeva, and Kalena Agrahara to Electronic City is 13 stops with one change.
How long does Hulimavu to Jayadeva take?
BMRCL has not published a station-to-station journey-time table for the new stretch that we could find. Two working figures: commuters on the first day said trips that took 20–30 minutes by road took about 9–10 minutes by metro (IANS, 14 November 2026). And BMRCL gives an average Namma Metro speed of 34 km/h, which over the 7.5 km stretch works out to about 13 minutes from Kalena Agrahara to SG Palya. Hulimavu to Jayadeva covers three of the five gaps, so if the gaps are similar expect roughly 8 minutes on the train, plus waiting time of up to 8 minutes at peak.
Access from BTM Layout, JP Nagar and Bannerghatta Road
- BTM Layout: the Yellow Line’s BTM Layout station is one stop south of Jayadeva; Jayadeva itself sits on the BTM Stage 2 edge of the junction.
- JP Nagar: NS Palya-JP Nagar 4th Phase is one Pink Line stop south and will also be the start of the Orange Line. Guide: JP Nagar 4th Phase Metro Bangalore: Pink Open, Orange Line Status
- Bannerghatta Road: Bilekahalli-IIMB, Hulimavu and Kalena Agrahara serve the road further south. Station page: /metro/bengaluru/hulimavu and /metro/bengaluru/kalena-agrahara
Homes within reach of Jayadeva interchange
Straight-line distances are from our project pages, checked on 17 November 2026; those pages were written before the Pink Line opened.
- Total Environment Learning To Fly, Ring Road near Jayadeva Hospital, JP Nagar: completed, first occupancy certificate 5 December 2023. K-RERA PRM/KA/RERA/1251/310/PR/171014/000270; 3 and 4 BHK. Total Environment Learning To Fly
- Godrej Vanantara, Bannerghatta Road: about 800 m from Bilekahalli-IIMB (2 Pink Line stops from Jayadeva). K-RERA PRM/KA/RERA/1251/310/PR/130526/008653; new launch, RERA completion 31 May 2031; from ₹1.49 crore. Godrej Vanantara
- Sobha Magnus, off Bannerghatta Road: about 800 m from Kalena Agrahara (4 stops). K-RERA PRM/KA/RERA/1251/310/PR/131025/008160; RERA completion 31 May 2030; from ₹3.4 crore. Sobha Magnus
- Prestige Park Square, Bannerghatta Main Road, Gottigere: ready to move. K-RERA PRM/KA/RERA/1251/310/PR/180313/002634; 2 to 3.5 BHK. Prestige Park Square
- Area pages: Jp Nagar, Bangalore and Bannerghatta Road, Bangalore





