Plan on about 2.2 minutes of in-train time per stop on Namma Metro, plus waiting time at each change. On that basis, Whitefield to Electronic City is 40 stops and about 88 minutes before two changes (Majestic and RV Road), for a ₹90 token; Banashankari to Electronic City is 12 stops and about 26 minutes plus one change, for ₹60; and KR Puram to Kundalahalli (Brigade Tech Gardens, EPIP) is 5 stops and about 11 minutes, for ₹30.

Updated 17 November 2026. Fares are from BMRCL's journey fare calculator on 17 November 2026; stop counts from BMRCL's station lists. BMRCL does not publish run times on its website, so we derived the per-stop time from a reported end-to-end run and checked it against two other lines. Planned lines are listed separately at the end.

How long does each tech-park trip take on the open lines?

Each line: origin to destination station, stops, estimated in-train minutes, interchanges, token fare (smart card off-peak in brackets).

  • Whitefield (Kadugodi) to Kundalahalli (Brigade Tech Gardens, EPIP): 6 stops, about 13 min, direct, ₹30 (₹27).
  • KR Puram to Kundalahalli: 5 stops, about 11 min, direct, ₹30 (₹27).
  • KR Puram to Pattandur Agrahara (ITPL): 8 stops, about 18 min, direct, ₹40 (₹36).
  • Indiranagar to Kundalahalli: 9 stops, about 20 min, direct, ₹50 (₹45).
  • Indiranagar to Baiyappanahalli (Bagmane Tech Park): 2 stops, about 4 min, direct, ₹10 (₹9).
  • Majestic to Baiyappanahalli: 9 stops, about 20 min, direct, ₹50 (₹45).
  • Rajarajeshwari Nagar to Pattandur Agrahara (ITPL): 28 stops, about 62 min, direct, ₹90 (₹81).
  • Kengeri to Kundalahalli: 29 stops, about 64 min, direct, ₹90 (₹81).
  • Yeshwantpur to Kundalahalli: 23 stops, about 51 min, change at Majestic, ₹80 (₹72).
  • Mysore Road to Pattanagere (Sattva Global City): 4 stops, about 9 min, direct, ₹20 (₹18).
  • Jayanagar to Pattanagere: 17 stops, about 37 min, change at Majestic, ₹70 (₹63).
  • Banashankari to Pattanagere: 19 stops, about 42 min, change at Majestic, ₹70 (₹63).
  • Banashankari to Electronic City: 12 stops, about 26 min, change at RV Road, ₹60 (₹54).
  • Jayanagar to Electronic City: 12 stops, about 26 min, change at RV Road, ₹60 (₹54).
  • Silk Institute (Kanakapura Road) to Electronic City: 19 stops, about 42 min, change at RV Road, ₹70 (₹63).
  • Hulimavu to Electronic City: 12 stops, about 26 min, change at Jayadeva Hospital, ₹60 (₹54).
  • Hulimavu to Central Silk Board: 5 stops, about 11 min, change at Jayadeva Hospital, ₹30 (₹27).
  • Banashankari to Central Silk Board: 5 stops, about 11 min, change at RV Road, ₹30 (₹27).
  • Kengeri to Electronic City: 31 stops, about 68 min, changes at Majestic and RV Road, ₹90 (₹81).
  • Whitefield to Electronic City: 40 stops, about 88 min, changes at Majestic and RV Road, ₹90 (₹81).
  • Nagasandra to Peenya Industry: 3 stops, about 7 min, direct, ₹20 (₹18).

How did we get 2.2 minutes per stop?

  • Purple Line: The News Minute reported on 10 October 2023 that Challaghatta to Whitefield took about 1 hour 20 minutes. That run has 36 stop-to-stop hops on BMRCL's station list, which is about 2.2 minutes per hop.
  • Check against BMRCL's average speed: BMRCL lists an average of 34 km/h. Its section lengths add up to about 43.5 km for Challaghatta–Whitefield, which at 34 km/h is about 77 minutes, close to the reported 80.
  • Check against the Pink Line: on its opening day, 14 November 2026, commuters told newkerala the 7.5 km Kalena Agrahara–Tavarekere trip took about 9–10 minutes for 5 hops, or about 2 minutes per hop. Our 2.2 is slightly cautious.
  • What it leaves out: the wait for the first train and the wait at each interchange. On the Pink Line, newkerala reported trains every 8 minutes at peak and every 10 minutes off-peak; check the Namma Metro app for the other lines' headways.

Where are the interchanges for tech-park trips?

  • Majestic (Nadaprabhu Kempegowda station): Purple Line and Green Line.
  • RV Road (Rashtreeya Vidyalaya Road): Green Line and Yellow Line, the route to Electronic City from the south and west.
  • Jayadeva Hospital: Yellow Line and the Pink Line's elevated section, which opened on 14 November 2026 from Kalena Agrahara to Tavarekere (SG Palya). See Jayadeva Interchange: Hulimavu to E-City and Silk Board.
  • Each change adds a platform walk and a wait. That is why a direct 20-stop trip can feel shorter than a 12-stop trip with a change.

What do the fares tell you?

BMRCL's calculator shows four prices for every trip: token, smart card at peak, smart card off-peak and group ticket. Across all 21 trips we checked, the smart-card peak fare was 5% below the token and the off-peak fare 10% below it. The token fare tops out at ₹90 on the longest trips we checked, such as Whitefield or Kengeri to Electronic City.

Which tech-park lines are not open yet?

  • Blue Line Phase 2A, Central Silk Board–KR Puram (19.75 km, 13 stations, BMRCL): serves the Outer Ring Road parks at Bellandur, Kadubeesanahalli and Kodibeesanahalli. Reported target: mid-2027 (Swarajya, 16 August 2026).
  • Blue Line Phase 2B, Kasturi Nagar–KIA via Nagawara and Hebbal (38.44 km, 17 stations, BMRCL): serves Manyata (Nagawara, Veeranna Palya) and Kirloskar Business Park (Kodigehalli).
  • Pink Line underground section, Tavarekere to Nagawara (BMRCL lists 12 underground stations on Phase 2's Pink packages): the elevated part is open; the underground part is not.
  • No minutes are given for these lines because no run has happened in passenger service. For opening timelines, see Bangalore Metro Opening Dates 2026-2028: Every Line.