We found seven RERA-registered, under-construction projects on our site within about 1 km, in a straight line, of a Bangalore metro station that is open or about to open, plus Godrej Vanantara on the Pink Line corridor. The closest are Purva Blubelle, about 70 m from Magadi Road on the Purple Line; Sattva Aaranya, about 185 m from Jnanabharathi; and Assetz Meru & Meadow, about 255 m from Doddakallasandra on the Green Line. RERA completion dates for the seven run from March 2028 to January 2031.

Updated 3 November 2026. The pages ranking for this search do not list projects, so we built the list from our own data: map pins for each project, station coordinates for the open lines and the Pink Line, and the Karnataka RERA register. The network grows from 96.1 km to 103.6 km when the first Pink Line section opens (The Hans India, 2 November 2026).

Which new projects are within 1 km of a metro station?

Format: project — nearest station (line) — straight-line distance — price — RERA completion — RERA number. Prices are from our listings, checked October 2026, and are builder figures unless marked.

  • Purva Blubelle, Magadi Road — Magadi Road (Purple, open) — about 70 m — price on request — RERA completion Jun 2029 — PRM/KA/RERA/1251/310/PR/290323/005829 — Purva Blubelle
  • Sattva Aaranya, Mysore Road — Jnanabharathi (Purple, open) — about 185 m — 480 homes, price on request — RERA completion Jan 2031 — PRM/KA/RERA/1251/310/PR/241225/008358 — Sattva Aaranya
  • Assetz Meru & Meadow, Kanakapura Road — Doddakallasandra (Green, open) — about 255 m — 3 BHK 1,897 to 2,111 sq ft from ₹2.74 Cr — RERA completion Nov 2030 — PRM/KA/RERA/1251/310/PR/130625/007828 — Assetz Meru & Meadow
  • Bodhi by Swan Realty, Jayanagar — Jayadeva Hospital (Yellow, open; Pink, opening) — about 670 m — 4 BHK from ₹9.54 Cr — RERA completion Mar 2028 — PRM/KA/RERA/1251/310/PR/170126/008409 — Bodhi
  • Sobha Magnus, Bannerghatta Road — Kalena Agrahara (Pink, opening) — about 810 m — 3 and 4 bed from ₹3.4 Cr — RERA completion May 2030 — PRM/KA/RERA/1251/310/PR/131025/008160 — Sobha Magnus
  • Purva Silversky, Huskur Road — Huskur Road (Yellow, open) — about 820 m — 3 and 4 BHK from ₹2.55 Cr — RERA completion Jul 2030 — PRM/KA/RERA/1251/310/PR/151225/008338 — Purva Silversky
  • Mahindra NewHaven, Singasandra — Singasandra (Yellow, open) — about 950 m — 3, 3.5 and 4 BHK from ₹2.99 Cr — RERA completion Dec 2029 — PRM/KA/RERA/1251/310/PR/160425/007668 — Mahindra NewHaven
  • Godrej Vanantara, Bannerghatta Road — on the Pink Line corridor; our pin is the locality centre, so we give no distance — 2 and 3 BHK from ₹1.49 Cr — RERA completion May 2031 — PRM/KA/RERA/1251/310/PR/130526/008653 — Godrej Vanantara

Every station in this list is on a line that is open today, except Kalena Agrahara, which opens with the Pink Line. Jayadeva Hospital is already a Yellow Line station and becomes a Pink Line interchange too.

Which projects are near the new Pink Line stations?

The Prime Minister is expected to inaugurate the 7.5 km Kalena Agrahara–Tavarekere section in mid-November 2026 (reports of 2 November give 13 and 15 November). Three projects in the list sit on that stretch: Sobha Magnus near Kalena Agrahara, Bodhi near Jayadeva Hospital and Tavarekere, and Godrej Vanantara on Bannerghatta Road. The full opening timeline and the homes by station are in Pink Line Metro Bangalore Opening Date: November 2026.

Are there ready-to-move homes next to a metro station?

Yes, mostly as resale. Two examples from our listings:

  • Prestige Jindal City, Tumkur Road — Chikkabidarakallu (Green) — about 350 m — the builder lists it as sold out, so this is resale; portal asks from about ₹78 L for a 1 BHK (Square Yards, October 2026) — Prestige Jindal City
  • Prestige Elysian, Bannerghatta Road — Kalena Agrahara (Pink, opening) — about 190 m — resale from about ₹1.88 Cr (portal asks, September 2026) — Prestige Elysian

Some projects people search for are just beyond walking distance. Prestige Suncrest on Jigani Road is about 2.3 km from Biocon Hebbagodi on the Yellow Line, so plan on a feeder bus or a short drive.

Which metro lines are open, and which are coming?

  • Open: the Purple Line (Whitefield to Challaghatta), the Green Line (Madavara to Silk Institute) and the Yellow Line (RV Road to Bommasandra).
  • Opening: the Pink Line's elevated section, six stations from Kalena Agrahara to Tavarekere, with the inauguration reported for mid-November 2026.
  • Pink Line underground, Dairy Circle to Nagawara: BMRCL aims to open it by May 2027 (Swarajya, 15 October 2026).
  • Blue Line to the airport: commissioning of Hebbal to KIA is targeted for September 2027 and the full line for March 2028 (Swarajya, 23 August 2026).

If you are buying for a line that is not open yet, use the target date as a planning date, and check the latest BMRCL statement before you book. Our guide to judging homes near future stations is Upcoming Bengaluru Metro Stations: How to Judge Homes Within 1 km.

How close is 'near a metro station'?

Listings use the phrase loosely. We use 1 km in a straight line as the outer limit, because the walking route is usually longer once you follow roads, cross a main road and reach the station entrance. At 70 to 300 m, as with Purva Blubelle, Sattva Aaranya and Assetz Meru & Meadow, you can usually see the station. At 800 m to 1 km, walk the route at peak hour before you decide.

Our station map, with every listed project plotted against the network, is at Metro Stations Bangalore.

Do homes near a metro station cost more in Bangalore?

We have not found an official dataset that measures a metro premium in Bangalore, and we do not forecast prices. The list above shows that location and builder matter more than the station alone: starting prices near a station range from ₹1.49 Cr at Godrej Vanantara to ₹9.54 Cr at Bodhi. Compare carpet area, RERA date and the walking route, not the word 'metro' in the brochure.

What should I check before booking a flat near a metro station?

  • The RERA number and completion date for your tower, on rera.karnataka.gov.in.
  • Which station entrance you will use, and whether the walk crosses a main road.
  • Noise and light from an elevated viaduct if your flat faces the line.
  • Parking: station parking is limited, so check feeder buses for the last kilometre.
  • Whether the line is open now or only targeted. A target date is not an opening date.

Browse all new projects at New Launches, Bangalore.