A Gurgaon household can get up to ₹78,000 in central subsidy under PM Surya Ghar: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. There is no extra central subsidy above 3 kW. Haryana now adds its own help on top. Under the Saur Urja Protsahan Yojana (SUPY), DHBVN gives eligible consumers interest-free financial assistance of up to ₹19,500 per kW for systems up to 5 kW, recovered through 24 monthly (or 12 bi-monthly) electricity bills. On DHBVN’s benchmark cost of ₹55,000 per kW, you pay only 10% upfront.
Updated 19 November 2026. We read three DHBVN sales circulars from 2026: D-05 (SUPY launch, 9 February), D-09 (revised SUPY eligibility, 30 July) and D-10 (net meter cost through the first bill, 10 August). We also checked the PM Surya Ghar subsidy figures on the Delhi Solar Portal, a government page updated 19 November 2026. Several ranking pages still say Haryana has no state top-up. That is out of date.
How much is the PM Surya Ghar subsidy for a Gurgaon home?
- 1 kW: ₹30,000.
- 2 kW: ₹60,000.
- 3 kW or larger: ₹78,000, the cap (₹30,000 × 2 + ₹18,000 × 1).
- Group housing societies and RWAs: ₹18,000 per kW for common facilities, EV charging included, up to 500 kW at 3 kW per house. This limit includes plants that residents install on their own.
- Sizing guide on the same page: 0–150 units a month suits 1–2 kW; 150–300 units suits 2–3 kW; above 300 units suits more than 3 kW.
- MNRE pays the subsidy straight into the consumer’s bank account after commissioning.
Is there a Haryana state solar subsidy in 2026?
Yes, mostly in the form of an interest-free loan. DHBVN’s circular D-05/2026 says the state government approved SUPY to help meet Haryana’s target of 2.22 lakh rooftop solar installations by 31 March 2027. SUPY runs alongside PM Surya Ghar. You check eligibility on the DHBVN portal, apply on the national portal, then enter that reference number back on the DHBVN portal to link the two.
- Category I, non-defaulter consumers, up to 5 kW: since circular D-09 of 30 July 2026, you only need to have paid the bill for the cycle just before you apply. The earlier rule needed three clean years. You must have no default on any connection in your name.
- Category II, state government employees (and HKRN staff with job security), up to 5 kW: same rule, plus your HRMS or HKRN ID.
- Category III, Antyodaya families with Parivar Pehchan income up to ₹3 lakh, up to 2 kW: a state financial assistance (SFA) grant, plus interest-free help for incomes from ₹1.8 lakh to ₹3 lakh.
- Repayment: Category I and II assistance is added to your electricity bill as an EMI over 24 monthly or 12 bi-monthly bills.
What does a 1–5 kW system cost under SUPY?
Circular D-09 works this out on a benchmark installation cost of ₹55,000 per kW, which it attributes to HAREDA. It covers Category I and II consumers. If your vendor quotes more than the benchmark, you pay the difference. Each line shows the benchmark cost, your 10% upfront payment, the central subsidy (CFA), DHBVN’s interest-free assistance, and any extra you pay yourself:
- 1 kW: ₹55,000 → upfront ₹5,500, CFA ₹30,000, DHBVN assistance ₹19,500, extra ₹0.
- 2 kW: ₹1,10,000 → upfront ₹11,000, CFA ₹60,000, assistance ₹39,000, extra ₹0.
- 3 kW: ₹1,65,000 → upfront ₹16,500, CFA ₹78,000, assistance ₹58,500, extra ₹12,000.
- 4 kW: ₹2,20,000 → upfront ₹22,000, CFA ₹78,000, assistance ₹78,000, extra ₹42,000.
- 5 kW: ₹2,75,000 → upfront ₹27,500, CFA ₹78,000, assistance ₹97,500, extra ₹72,000.
How do I apply and get a net meter in Gurgaon?
- Step 1: Log in to the DHBVN portal. A SUPY pop-up lets you check whether you are eligible.
- Step 2: Register and apply on the national PM Surya Ghar portal (pmsuryaghar.gov.in). Pick an empanelled vendor and note the reference number.
- Step 3: Enter that reference number on the DHBVN portal. DHBVN’s solar connection site is esolarconn.dhbvn.org.in. If you want SUPY assistance, upload the signed SUPY agreement.
- Step 4: The vendor installs the system. The SDO (Operations) inspects and commissions it, and the completion report with photos is uploaded.
- Step 5: MNRE pays the CFA into your bank account. DHBVN then releases any SUPY assistance and adds the EMI to your bill from the next cycle.
- Net meter and load: since circular D-10 of 10 August 2026, PM Surya Ghar applicants can pay for the net meter, and the security for raising their load up to the plant’s capacity, either upfront or in the first bill after commissioning.
What will I save on DHBVN bills?
Savings depend on which slab the solar units displace. A Gurgaon home above 5 kW load pays ₹6.50 per unit for its first 500 units and ₹7.15 for units 501–1,000. Full slab table: DHBVN Tariff 2026-27: Electricity Rate Per Unit in Gurgaon. As an illustration, suppose a 3 kW plant offsets 300 units a month. Use your vendor’s generation estimate for your own roof.
- Monthly saving at ₹6.50 per unit: 300 × ₹6.50 = ₹1,950.
- Your money in a 3 kW SUPY system: ₹16,500 upfront + ₹12,000 extra + ₹58,500 repaid through bills = ₹87,000. The ₹78,000 CFA is paid separately.
- Simple payback: ₹87,000 ÷ ₹1,950 ≈ 45 months. During the 24-month EMI period, the ₹58,500 ÷ 24 ≈ ₹2,438 EMI is a little higher than the saving.
- If your use is lower, the offset units come from cheaper slabs, so savings are smaller.
Can I put solar on a builder floor or a society roof?
On a builder floor, the roof usually belongs to whoever bought the terrace rights, often the top-floor owner. Read your sale deed before you install. Lower-floor owners need the terrace owner’s written consent and space allotted by agreement. Each floor has its own DHBVN connection, so each owner applies on their own account. See Builder Floor Terrace Rights in Gurgaon: Roof, Stilt, Land Share.
In a group housing society, the RWA can apply for common-area plants at ₹18,000 per kW. These can power lifts, pumps and EV chargers. The 500 kW cap counts plants that individual residents have installed too. On a single-point connection, the society holds the DHBVN account, so the RWA, not each flat, deals with DHBVN: Single Point Connection Gurgaon: DHBVN Society Power Rules 2026. If you need more load first: DHBVN Load Extension Gurgaon: Apply Online, Charges 2026.