Namma Metro’s Purple Line has 37 stations over 43.49 km, from Whitefield (Kadugodi) in the east to Challaghatta in the west, and has run end to end since 9 October 2023. Its interchange today is Nadaprabhu Kempegowda station, Majestic, for the Green Line. KR Puram is built for the Blue Line and MG Road for the Pink Line’s underground section, both still under construction. Trains are reported to run from 5 am to 11 pm Monday to Saturday and from 7 am on Sundays.

Updated 18 November 2026. We took the station order, station types and opening dates from the line’s published record, checked the length figures against the section-by-section table, and compared the timings that sites quote. BMRCL’s timetable page showed no table when we checked, so confirm early and late trains in the Namma Metro app.

What are all the Purple Line stations, in order?

From east to west. All stations are elevated except those marked underground (U) or at grade (G).

  • 1. Whitefield (Kadugodi) (terminal; Whitefield railway station)
  • 2. Hopefarm Channasandra
  • 3. Kadugodi Tree Park
  • 4. Pattandur Agrahara
  • 5. Sri Sathya Sai Hospital
  • 6. Nallurhalli
  • 7. Kundalahalli
  • 8. Seetharampalya
  • 9. Hoodi (Hoodi Halt railway)
  • 10. Garudacharpalya
  • 11. Singayyanapalya
  • 12. Krishnarajapura (KR Puram) (future Blue Line interchange; KR Puram railway)
  • 13. Benniganahalli
  • 14. Baiyappanahalli (G; Baiyappanahalli railway)
  • 15. Swami Vivekananda Road
  • 16. Indiranagar
  • 17. Halasuru
  • 18. Trinity
  • 19. Mahatma Gandhi Road (future Pink Line interchange)
  • 20. Cubbon Park (U)
  • 21. Dr. B.R. Ambedkar Station, Vidhana Soudha (U)
  • 22. Sir M. Visvesvaraya Station, Central College (U; approved Red Line interchange)
  • 23. Nadaprabhu Kempegowda Station, Majestic (U; Green Line interchange; KSR railway and Kempegowda bus station)
  • 24. Krantivira Sangolli Rayanna Railway Station (U; KSR Bengaluru)
  • 25. Magadi Road
  • 26. Sri Balagangadharanatha Swamiji Station, Hosahalli
  • 27. Vijayanagara
  • 28. Attiguppe
  • 29. Deepanjali Nagar
  • 30. Mysuru Road
  • 31. Pantharapalya–Nayandahalli
  • 32. Rajarajeshwari Nagar
  • 33. Jnanabharathi (Jnanabharathi Halt railway)
  • 34. Pattanagere
  • 35. Kengeri Bus Terminal
  • 36. Kengeri (Kengeri railway)
  • 37. Challaghatta (western terminal)

When did each Purple Line section open?

  • 20 October 2011: Baiyappanahalli – MG Road (6.70 km), Namma Metro’s first section.
  • 16 November 2015: Magadi Road – Mysuru Road (6.40 km).
  • 30 April 2016: MG Road – Magadi Road, underground (5.12 km).
  • 30 August 2021: Mysuru Road – Kengeri (7.5 km in the section table).
  • 26 March 2023: KR Puram – Whitefield (Kadugodi), 12 stations.
  • 9 October 2023: Baiyappanahalli – KR Puram (Benniganahalli) and Kengeri – Challaghatta, completing the line.

Is the Purple Line 42, 43.5 or 45 km long?

Use 43.49 km. That is the figure in Wikipedia’s infobox and on yometro. Different totals circulate because sections were re-planned: Wikipedia’s own text gives 8.81 km for Mysuru Road–Kengeri where the table says 7.5 km, and 8.03 km for a Baiyappanahalli–Seetharampalya reach that was planned differently. Adding the section table gives 43.58 km, which is within 0.1 km of 43.49 km.

What are the Purple Line timings?

  • Monday to Saturday: first train 5:00 am from both Whitefield (Kadugodi) and Challaghatta; last train 11:00 pm (yometro, updated 18 November 2026).
  • Sunday: first train 7:00 am from both ends; last train 11:00 pm (yometro).
  • Conflict: the same page’s header says 5:30 am. We could not confirm either time on BMRCL’s timings page, which displayed notices but no timetable on 18 November 2026.
  • BMRCL says times may change for planned works and extra trains may run from intermediate stations when demand rises. Helpline: 1800-425-12345.

Which areas and homes does the Purple Line serve?

East of the city centre, the line links Whitefield, Kadugodi, Hoodi and KR Puram to Indiranagar and MG Road. West of Majestic it runs along Magadi Road and Mysuru Road through Vijayanagar to Rajarajeshwari Nagar and Kengeri.

Station pages: /metro/bengaluru/whitefield-kadugodi, /metro/bengaluru/hopefarm-channasandra, /metro/bengaluru/kadugodi-tree-park, /metro/bengaluru/pattandur-agrahara and /metro/bengaluru/rajarajeshwari-nagar. Area pages: Whitefield, Bangalore, Kadugodi, Bangalore, Kr Puram, Bangalore, Indiranagar, Bangalore, Vijayanagar, Bangalore and Kengeri, Bangalore. KR Puram’s future Blue Line change is explained in KR Puram Metro Station Bangalore: Purple-Blue Interchange Guide. RERA-registered projects in our catalogue along the line include Brigade Woods in the east and Sattva Aaranya in the west. More options: Metro Stations Bangalore.

Will the Purple Line be extended?

In November 2023 the Karnataka government said it planned to extend the line east to Hoskote and west to Bidadi and Ramanagara “in the future”, with no timeline. Treat both as proposals. Approved future interchanges on the line are listed at Central College (Red Line), Hosahalli (Grey Line) and Mysuru Road (Orange Line, Phase 3), alongside KR Puram and MG Road.