Five projects on the NH-48 (Delhi–Jaipur highway) side of Gurgaon, between Sector 36A and Sector 80, were registered with HRERA or launched to buyers in 2026: Max Estates’ The Terraces at Estate 361, Trehan IRIS Omara, Ashiana Aaroham Phase II, Eldeco Terra and Sol, and The Aerth. The only official price is The Terraces from ₹2.4 crore, and RERA completion dates run from 15 January 2031 to 31 October 2033.

Updated 20 November 2026. We read every 2025–26 registration in Sectors 36, 36A, 79 and 80 on the HRERA Gurugram register (certificate, date, address, “registration up to” date), the developers’ launch announcements as reported on the launch dates, and the latest tender news for the NH-48 flyovers and the elevated Southern Peripheral Road. Distances are not quoted because no official source gives them per project.

NH-48 belt new projects 2026 at a glance

Ordered by sector number. Format: Project — Builder — Sector — HRERA no. (certificate date) — Configurations — Verified price — RERA completion date.

  • Estate 361 (incl. The Terraces) — Max Estates — Sector 36A (HRERA: Sector 36, Harsaru) — RERA-GRG-2093-2025 (21 Nov 2025; Terraces launched 14 May 2026) — 120 Terraces units — from ₹2.4 Cr — 30 September 2033
  • The Aerth — Boxacres Developers — Sector 79 (Naurangpur) — RERA-GRG-2231-2026 (2 Jul 2026) — 352 apartments in 4 towers — price not published — 30 April 2033
  • Omara — Trehan IRIS — Sector 80 — RERA-GRG-2092-2025 (22 Jan 2026; launched 30 Jul 2026) — 3.5 and 4.5 BHK, 3,250–4,150 sq ft — price not published — 31 December 2032
  • Ashiana Aaroham Phase II — Ashiana Housing — Sector 80 (GH-04) — RERA-GRG-2134-2025 (27 Jan 2026) — apartments — price not published — 31 October 2033
  • Eldeco Terra and Sol — Eldeco — Sector 80 (Plot 3A) — RERA-GRG-2160-2026 (11 Mar 2026) — price not published — 15 January 2031

Estate 361 and The Terraces, Sector 36A

Max Estates markets Estate 361 as Sector 36A on the Dwarka Expressway–NH-48 side. HRERA registers it as Estate 361 (RERA-GRG-2093-2025, certificate dated 21 November 2025, valid to 30 September 2033) with the address “Village Harsaru, Sector 36” and the promoter Max Estates Gurgaon Two Ltd. Use the HRERA wording on your documents.

Sahi (14 May 2026) reported The Terraces as a new phase of 120 units with a phase-1 GDV of ₹1,200 crore and units starting at ₹2.4 crore, inside a township with a total GDV of about ₹9,000 crore. Max Estates’ earlier Estate 360 next door is RERA-GRG-1675-2024 (valid to 31 August 2030). Our page: Max Estate 361; sector page Sector 36a Gurgaon, Gurgaon.

Omara, Sector 80

Trehan Promoters & Builders registered Omara as RERA-GRG-2092-2025 (certificate GGM/1036/768/2026/08, 22 January 2026), valid to 31 December 2032. Realty N More (30 July 2026) reported the launch: 320 golf-facing residences in three towers on 5.08 acres, 3.5 and 4.5 BHK homes of 3,250–4,150 sq ft, and an estimated project cost of about ₹1,300 crore per the RERA filing. No price was announced. Our page: Trehan IRIS Omara.

Ashiana Aaroham Phase II, Sector 80

Ashiana Housing registered Aaroham in two phases on HSIIDC plot GH-04, Sector 80, IMT Manesar. Phase 1 is RERA-GRG-2020-2025 (25 November 2025) and Phase II is RERA-GRG-2134-2025 (27 January 2026); both are valid to 31 October 2033. Each phase is a separate registration, so the number on your allotment letter must match your tower’s phase. Our page: Ashiana Aaroham.

Eldeco Terra and Sol, Sector 80

Eldeco Infrastructure and Properties Ltd registered Eldeco Terra & Sol as RERA-GRG-2160-2026 (certificate GGM/1048/780/2026/20, 11 March 2026), on Plot 3A, Sector 80. Its RERA completion date, 15 January 2031, is the earliest among the 2026 NH-48 belt registrations. We found no dated launch announcement or official price as of 20 November 2026. Our page: Eldeco Terra & Sol.

The Aerth, Sector 79 (Naurangpur)

Boxacres Developers Pvt Ltd registered The Aerth as RERA-GRG-2231-2026 on 2 July 2026 (certificate GGM/1076/808/2026/48), valid to 30 April 2033, at Village Naurangpur, Sector 79. The HRERA filing shows four towers with 352 apartments and 10 other units, an estimated project cost of about ₹440 crore, on about 4.6 acres. Our page: Aura The Aerth.

Also on the belt: Elaira Residences Phase 2 and 2A, Sector 80

Registered a few weeks before 2026, Conscient’s Elaira Residences Phase 2 & 2A is RERA-GRG-2101-2025 (8 December 2025), valid to 30 June 2032, at Village Naurangpur, Sector 80. Phase 1 is RERA-GRG-1863-2025 (20 February 2025), valid to 31 March 2031. Our page: Conscient Elaira Residences; more at Conscient Elaira Residences Sector 80: Price, RERA, Phase 2.

NH-48 new launch price: what is verified?

Only Max Estates published a starting price at launch: ₹2.4 crore for The Terraces (14 May 2026). Trehan IRIS announced sizes (3,250–4,150 sq ft) and project cost, not unit prices. Ashiana, Eldeco and Boxacres had no official price we could find. Portal figures for these projects are not used here. For any quote, ask for the carpet area per HRERA and the full cost sheet, then compare with /calculators/gurgaon-total-cost.

RERA completion dates on the NH-48 belt

Nearer-term options in the same sectors: M3M Antalya Hills Phase 1 (RERA-GRG-1242-2022, 30 December 2026; M3M Antalya Hills) and Signature Global City 79B floors (RERA-GRG-1200-2022, 27 April 2027; Signature Global City 79B).

  • 15 January 2031: Eldeco Terra and Sol (RERA-GRG-2160-2026)
  • 30 June 2032: Elaira Residences Phase 2 & 2A (RERA-GRG-2101-2025)
  • 31 December 2032: Omara (RERA-GRG-2092-2025)
  • 30 April 2033: The Aerth (RERA-GRG-2231-2026)
  • 30 September 2033: Estate 361 (RERA-GRG-2093-2025)
  • 31 October 2033: Ashiana Aaroham Phases 1 and II (RERA-GRG-2020-2025, RERA-GRG-2134-2025)

What road projects are coming on NH-48 and SPR?

  • NH-48 flyovers: a foundation stone was laid for four flyovers (Panchgaon Chowk, Rathiwas, near the Hero company and Sahlawas) and nine foot over-bridges, including at Shikhopur and Manesar, at about ₹282 crore with allied works (NBM&CW, 27 August 2025).
  • Elevated SPR, Package 1: GMDA opened bids on 1 October 2026 for a 4.23 km elevated road between NH-48 and Vatika Chowk, about ₹776 crore excluding GST, built over 30 months from award (Construction World, 9 October 2026).
  • Tender reports gave 18 November 2026 as the bid due date; check GMDA’s e-tender page (tender ID 2026_HRY_551863_1) for any extension or award.
  • Toll and junction detail for this stretch is in NH 48 Gurgaon News 2026: Kherki Daula Toll Shift and Flyovers and Pachgaon Gurgaon: KMP–NH 48 Junction, Metro, Toll Plaza Guide.

How do I check an NH-48 belt project on HRERA?

  • Search the RERA-GRG number on haryanarera.gov.in → Registered Projects → Gurugram.
  • Some Sector 80 group-housing sites are industrial-estate plots: Ashiana Aaroham’s HRERA address names “IIDC Plot No GH-04, Sector 80, IMT Manesar”. Make sure your agreement names the same plot.
  • Check the promoter’s legal name: Omara is filed by Trehan Promoters & Builders Pvt Ltd, Estate 361 by Max Estates Gurgaon Two Ltd.
  • For sector context, see Sector 80 Gurgaon, Gurgaon, Sector 79 Gurgaon, Gurgaon and Sector 80 Gurgaon Projects 2026: Prices, RERA, Possession.