Namma Metro’s Green Line has 32 stations over 33.46 km, from Madavara in the north (on Tumakuru Road, near BIEC) to Silk Institute in the south (on Kanakapura Road). You can change to the Purple Line at Nadaprabhu Kempegowda station, Majestic, and to the Yellow Line at Rashtreeya Vidyalaya (RV) Road. The newest section, Nagasandra to Madavara, opened for passengers on 7 November 2024. Trains are reported to run from about 5 am to 11 pm Monday to Saturday and from 7 am on Sundays.

Updated 18 November 2026. We took the station order and section dates from the line’s published records, settled the Madavara opening date from the 2024 opening reports, and compared the timings different sites quote. BMRCL’s timetable page showed no table when we checked it, so confirm times in the Namma Metro app before an early or late trip.

What are all the Green Line stations, in order?

From north to south. Interchanges and underground stations are marked; the other 29 stations are elevated.

  • 1. Madavara (northern terminal, BIEC)
  • 2. Chikkabidarakallu
  • 3. Manjunath Nagar
  • 4. Nagasandra
  • 5. Dasarahalli
  • 6. Jalahalli
  • 7. Peenya Industry
  • 8. Peenya
  • 9. Goraguntepalya
  • 10. Yeshwanthpur
  • 11. Sandal Soap Factory
  • 12. Mahalakshmi
  • 13. Rajajinagara
  • 14. Mahakavi Kuvempu Road
  • 15. Srirampura
  • 16. Mantri Square Sampige Road
  • 17. Nadaprabhu Kempegowda station, Majestic (underground; interchange with Purple Line)
  • 18. Chickpete (underground)
  • 19. Krishna Rajendra Market (underground)
  • 20. National College
  • 21. Lalbagh
  • 22. South End Circle
  • 23. Jayanagara
  • 24. Rashtreeya Vidyalaya Road (interchange with Yellow Line)
  • 25. Banashankari
  • 26. Jaya Prakash Nagar
  • 27. Yelachenahalli
  • 28. Konanakunte Cross
  • 29. Doddakallasandra
  • 30. Vajarahalli
  • 31. Thalaghattapura
  • 32. Silk Institute (southern terminal)

When did each Green Line section open?

Why do some pages give a different Madavara date? The extension was cleared by the Commissioner of Metro Rail Safety after an inspection on 3 October 2024, and commercial service began on 7 November 2024 (Indian Infrastructure, 8 November 2024; NoBroker’s station page gives the same date). Use 7 November 2024. On length, Wikipedia’s infobox and section table say 33.46 km while one paragraph says 34.46 km; the section lengths support 33.46 km.

  • 1 March 2014: Mantri Square Sampige Road – Yeshwanthpur (5.10 km), with Yeshwanthpur – Peenya Industry (4.80 km).
  • 1 May 2015: Peenya Industry – Nagasandra (2.50 km).
  • 18 June 2017: Mantri Square Sampige Road – National College, underground (4.0 km). The table lists National College – RV Road (4.10 km) and RV Road – Yelachenahalli (3.90 km) without separate dates.
  • 15 January 2021: Yelachenahalli – Silk Institute (6.29 km).
  • 7 November 2024: Nagasandra – Madavara (3.14 km), adding Manjunath Nagar, Chikkabidarakallu and Madavara.

What are the Green Line timings?

BMRCL’s metro-timings page carried only notices, not a timetable, when we opened it on 18 November 2026. These are the times other sites report; they agree on the broad pattern but not on Mondays.

  • Monday to Saturday: first train about 5:00 am, last about 11:00 pm (NoBroker, Madavara station page updated 2 April 2026).
  • Sundays and public holidays: first train 7:00 am, last about 11:00 pm (NoBroker).
  • Mondays: Aurum PropTech (17 October 2026) says the first train leaves Madavara at 4:15 am; we could not confirm this from BMRCL.
  • Last trains: Aurum gives about 11:05 pm from both ends; NoBroker lists 10:57 pm for the last Madavara–Majestic run in one place. Plan to reach the platform before 10:45 pm.
  • BMRCL notes that train times may change for planned works and that extra trains may run from intermediate stations at busy times. Helpline: 1800-425-12345.

Which areas does the Green Line serve?

North of Majestic the line follows Tumakuru Road through the Peenya industrial belt to Yeshwanthpur and Rajajinagar. South of Majestic it runs under the old city to Lalbagh and Jayanagar, then along Kanakapura Road past Banashankari and JP Nagar to Silk Institute.

Our station pages: /metro/bengaluru/peenya, /metro/bengaluru/doddakallasandra, /metro/bengaluru/vajarahalli, /metro/bengaluru/thalaghattapura and /metro/bengaluru/silk-institute. Area pages: Yeshwanthpur, Bangalore, Rajajinagar, Bangalore, Jayanagar, Bangalore, Banashankari, Bangalore, Jp Nagar, Bangalore and Kanakapura Road, Bangalore. Homes near stations: Metro Stations Bangalore. RERA-registered projects in our catalogue on this line’s corridors include Salarpuria Sattva Opus on Tumakuru Road and Brigade 7 Gardens on Kanakapura Road.

Will the Green Line be extended to Tumakuru?

A Madavara–Tumakuru metro is a proposal at the study stage, not an approved extension; our status note is Tumakuru Metro 2026: Proposed 59.6 km Line, DPR Status. For the whole network map, see /metro/bengaluru, and for every interchange see Bangalore Metro Interchange Stations: Full List and Status 2026.