To check building plan approval online in Bangalore, open the Greater Bengaluru Authority's building-permission portal at bpas.bbmpgov.in and use its Search menu (Citizen Search, Owner Search or the Digitized OC List). For an apartment project, open its page on rera.karnataka.gov.in and read the “Uploaded Documents” tab for the approved building plan and commencement certificate. Then match what is built, including floors, height, setbacks and use, against the sanctioned drawings.

Updated 17 November 2026. We opened the GBA portal's home page, FAQ and OC list, and Karnataka RERA's project search and project tabs. Note that several guides link “bpas.bbmp.gov.in”, which does not load. The working address is bpas.bbmpgov.in, with no dot between “bbmp” and “gov”.

Which portal holds Bangalore building plan approvals?

Inside GBA limits, plans are sanctioned online through the GBA building-permission system. It serves the five city corporations (North, South, Central, East and West) and states that “All Certificates are Online Digital Signed Certificates.” Small owner-built houses can use Nambike Nakshe, the GBA's quick-approval track for owners; that is covered in Nambike Nakshe 2.0: 30-Minute Building Plan Approval (2026). This guide is for the buyer checking someone else's building.

Since 1 July 2025, the portal says e-Khata is mandatory for building licence, plinth certificate and occupancy certificate applications. So an approval issued after that date should tie back to an e-khata; see e-Khata guide, Bangalore.

How do you search a sanctioned plan on the GBA portal?

  • 1. Open https://bpas.bbmpgov.in/BPAMSClient4/NewDefault1.aspx.
  • 2. In the menu, choose Search, then Citizen Search, Owner Search or Digitized OC List.
  • 3. Citizen Search: the portal's FAQ says you can look up a file by file number, applicant name, architect or surveyor name, zone or ward. Ask the seller or builder for the plan's file or LP number first; it is the most reliable key.
  • 4. Open the sanction and note the LP/file number, date, number of floors, and plot and built-up area.
  • 5. Check the commencement certificate (CC). The FAQ's sequence is: sanction, then CC up to plinth, then CC, then occupancy certificate.
  • 6. If you cannot find the file, ask the seller for a copy of the sanctioned plan and sanction order with its number, and verify that number on the portal or at the corporation office.

How do you check approvals for a RERA project?

  • 1. Go to rera.karnataka.gov.in and open the project search. You can search by project name, promoter, application number, registration number, district or taluk.
  • 2. Click “View Project Details”. The tabs are Promoter Details, Project Details, Uploaded Documents, Enquired Documents, Complaints, Quarterly Updates and Completion Details.
  • 3. Under Uploaded Documents, open the Commencement Certificate, Approved Building/Plotting Plan, Approved Layout Plan, Approved Section of Building, NOCs, Encumbrance Certificate and Title Deed.
  • 4. Under Completion Details, see whether an occupancy certificate has been received and its date.
  • 5. Match the registration number on the certificate to the one in the builder's agreement. See /rera-index and Rera Badge.

Which other approvals should a RERA project show?

The building plan is one item in a longer list. At registration, K-RERA's “Uploaded Documents” section has slots for these approvals. A blank or “not applicable” entry is a question to put to the builder in writing:

  • Conversion certificate under Section 95 of the Karnataka Land Revenue Act (land converted from agricultural use)
  • Approval or NOC under Section 14 of the Karnataka Town and Country Planning Act
  • Joint development agreement, where the landowner and developer differ
  • Fire, Airports Authority and other NOCs, where the height or location needs them
  • Proforma agreement for sale and sale deed, which should match what you are asked to sign
  • Encumbrance certificate and title deed for the land

What if the building does not match the sanctioned plan?

Note every difference in writing: extra floors, reduced setbacks, a changed use. GBA's FAQ says the occupancy certificate stage includes “intimation of compounding fee & charges if applicable”. So some deviations are dealt with, and paid for, before an OC is released. That cost falls on the owner or developer, and the OC is what shows it was settled. Ask for the OC, or a written explanation of the deviation, before you sign. Do not accept a verbal promise that it “will be regularised later”.

What should you match between the plan and the building?

  • Number of floors and height. The portal's risk classes depend on them: B1 is a plot up to 150 sq m and below 11.5 m; B5 is 8,000 sq m or more, or 15 m or taller.
  • Setbacks from each boundary and the road, against the dimensioned site plan
  • Use: residential versus commercial on each floor
  • Units per floor and parking, against the floor plans
  • Plot area and survey or site number, against the sale deed and e-khata
  • Any extra floor, penthouse or terrace room not on the sanction

What about BDA layouts and resale houses?

For houses in BDA layouts, check whether the layout is now with a GBA corporation; eight were handed over in January 2026. If so, approvals sit on the GBA portal. For a resale house anywhere, ask for the sanctioned plan and any OC, and see Occupancy Certificate Download Online in Bangalore: Check an OC for finding an OC. Also see Occupancy Certificate vs Completion Certificate in Bengaluru: What to Demand Before You Take Possession for what each certificate proves, and /resale for listings.