Nine large Gurgaon townships have HRERA-registered phases active in 2026: M3M’s Gurgaon International City near Manesar (150 acres), DLF Privana on the Southern Peripheral Road (116.30-acre licence), Emaar Marbella and Emerald Hills on Golf Course Extension Road, AIPL Lake City and Sobha City on the Dwarka Expressway, Krisumi City in Sector 36A, Central Park Flower Valley in Sohna, and Birla Navya in Sector 63A. Together they hold 30 active phases in this list, with HRERA completion dates from 9 December 2026 to 31 March 2036. Each phase is registered and dated separately, so the township name alone tells you little about when your home will be ready.
Updated 20 November 2026. We read every phase’s row on the HRERA Gurugram register on 20 November 2026 and opened REP-I forms for licence numbers and licensed areas. Townships are listed alphabetically and phases by completion date. Earlier phases whose dates have passed are not listed.
What is the difference between a township licence and a RERA phase?
The Haryana Department of Town and Country Planning (DTCP) licenses the land for a colony; one licence can cover 100+ acres. HRERA then registers each phase the developer builds and sells on that land, with its own RERA-GRG number, completion date and bank account. Three examples from the REP-I forms:
- DLF Privana Enclave: DTCP licence 219 of 2023 (25 October 2023, valid to 24 October 2028) covers 116.29625 acres; the Enclave phase is 4.662 acres of it.
- Smartworld Nature’s Court I (GIC): licence 168 of 2025 (8 September 2025) covers 139.79 acres; this phase is 8.28 acres.
- Emaar Marbella Phase 2: licences 97 of 2010 and 41 of 2011 cover 107.919 acres; this phase is 12.609 acres.
- What it means for you: check the RERA number of your phase, not the township, and read that phase’s completion date. Licence checks are explained in DTCP Licensed vs Unlicensed Colonies in Gurgaon: How to Verify a Builder & Project Before You Buy.
Township projects in Gurgaon: summary table
Format: Township — Location — Active phases in this list — HRERA completion span — Our page.
- AIPL Lake City — Sector 103, Dwarka Expressway — 2 — 30 Jun 2033 to 31 Mar 2034 — AIPL Riviera at Lake City
- Birla Navya — Sector 63A, Golf Course Extension Road — 3 — 31 Dec 2026 to 30 Apr 2030 — Birla Navya
- Central Park Flower Valley — Sectors 29–33, Sohna — 6 — 9 Dec 2026 to 31 Dec 2032 — Central Park Flower Valley
- DLF Privana — Sectors 76/77, SPR — 4 — 30 Jun 2031 to 30 Sep 2034 — DLF Privana South
- Emaar Emerald Hills — Sectors 62/65 — 1 — 10 Aug 2027 — Emaar Emerald Hills
- Emaar Marbella — Sectors 65/66 — 3 — 31 Dec 2026 to 31 Dec 2031 — Emaar Marbella
- Krisumi City — Sector 36A, Dwarka Expressway — 6 — 31 Dec 2028 to 31 Mar 2036 — Krisumi Waterfall Suites
- M3M Gurgaon International City — Sectors M9–M11, Manesar — 3 — 30 Jun 2033 to 30 Jun 2034 — M3M Forestia West
- Sobha City — Sector 108, Dwarka Expressway — 2 — 31 Dec 2026 to 31 Dec 2028 — Sobha City
AIPL Lake City, Sector 103
- Riviera at AIPL Lake City — RERA-GRG-2085-2025 — 412 REP-I units on 5.14 acres — 30 June 2033 — inaugural ₹17,450 per sq ft (AIPL, May 2026) — AIPL Riviera at Lake City
- Aquaria at AIPL Lake City — RERA-GRG-2207-2026 — 240 REP-I units on 5.11 acres — 31 March 2034 — Aquaria at AIPL Lake City
Birla Navya, Sector 63A
- Anaika — RERA-GRG-1012-2022 — 31 December 2026
- Avik Phase 1 — RERA-GRG-1233-2022 — 30 April 2027
- Avik Phase 2 — RERA-GRG-1829-2024 — 30 April 2030
- Drisha 1B (RERA-GRG-1011-2022) already shows an OC/CC/PCC link on the register. Sector list: Sector 63A Gurgaon Ready to Move Projects: Possession 2026-27
Central Park Flower Valley, Sohna
Central Park’s Sohna township (promoter St. Patricks Realty Pvt Ltd) spans Sectors 29, 30, 32 and 33 and mixes floors, villas, plots and towers.
- Flower Valley Phase III (floors and villas) — RERA-GRG-997-2021 — 9 December 2026
- Residential plotted colony — RERA-GRG-1559-2024 — 31 January 2027
- Bignonia Towers — RERA-GRG-1618-2024 — 29 June 2028 — Bignonia Towers
- Flower Valley Phase IV (plots) — RERA-GRG-2118-2025 — 30 June 2029 — Central Park Flower Valley Phase IV
- The Selene Tower — RERA-GRG-1946-2025 — 30 June 2030 — Selene
- The Skylo Tower — RERA-GRG-2068-2025 — 31 December 2032
- Area guide: Sohna, Gurgaon
DLF Privana, Sectors 76 and 77 (SPR)
DLF’s Privana township sits on a DTCP licence of 116.29625 acres (licence 219 of 2023, per the Privana Enclave REP-I). Each Privana project is a separate phase.
- DLF Privana South — RERA-GRG-1406-2023 — 30 June 2031 — DLF Privana South; review: DLF Privana South, Sector 77: Review 2026 - Price, Pros, Cons and Who It Suits
- DLF Privana West — RERA-GRG-1540-2024 — 31 December 2031 — DLF Privana West
- Privana Enclave (41 residential plots on 4.662 acres) — RERA-GRG-2236-2026 — 30 April 2033 — DLF Privana Enclave
- DLF Privana North — RERA-GRG-1781-2024 — 30 September 2034 — DLF Privana North
- Corridor: Southern Peripheral Road, Gurgaon
Emaar Marbella and Emerald Hills, Sectors 62, 65 and 66
Emaar’s two Golf Course Extension Road communities are registered mostly as plotted phases: HRERA lists plots, not apartments, for all four phases below.
- Marbella Phase 7 — RERA-GRG-2230-2026 — 12 plots — register date 31 December 2026 (the REP-I form shows 31 December 2031; confirm with Emaar)
- Emerald Hills Phase 2 — RERA-GRG-1342-2023 — 474 plots on 50.6 acres — 10 August 2027 — Emaar Emerald Hills
- Marbella Phase 2 — RERA-GRG-755-2020 — 136 plots on 12.61 acres — 31 December 2027
- Marbella Terraces — RERA-GRG-2228-2026 — 247 plots on 20.24 acres — 31 December 2031 — Marbella Terraces
- Marbella page: Emaar Marbella
Krisumi City, Sector 36A
- Waterfall Suites — RERA-GRG-1302-2023 — 31 December 2028 — Krisumi Waterfall Suites
- Waterside Residences — RERA-GRG-1562-2024 — 14 October 2029 — Krisumi Waterside Residences
- Waterfall Suites II — RERA-GRG-1573-2024 — 31 December 2029
- Waterside Residences The Forest Reserve I and II — RERA-GRG-1886-2025 and 1901-2025 — 30 June 2031 — Krisumi Waterside Residences The Forest Reserve
- Krisumi City Phase 7 (community buildings) — RERA-GRG-2204-2026 — 31 March 2036
- Already showing an OC/CC/PCC link: Waterfall Residence, RERA-GRG-197-2019 — Krisumi Waterfall Residences
M3M Gurgaon International City (GIC), Manesar
M3M describes GIC as a 150-acre integrated development with about ₹7,200 crore of planned investment; Phase 1 (Forestia West, Nature’s Court and industrial plots) recorded about ₹2,000 crore of residential sales and sold out within three days of its November 2025 launch (company release via The Tribune, 25 February 2026).
- Smartworld Nature’s Court I (2.5 BHK; 1,214 REP-I units on 8.28 acres) — RERA-GRG-2126-2025 — 30 June 2033 — Smartworld Nature's Court
- M3M Forestia West I (3 BHK) — RERA-GRG-2124-2025 — 30 June 2034 — M3M Forestia West
- M3M Forestia East I — RERA-GRG-2125-2025 — 30 June 2034 — M3M Forestia East
- More Manesar projects: New Projects in Manesar 2026: HRERA List, Sizes, Dates and Manesar, Gurgaon
Sobha City, Sector 108
- Sobha City Phase 5 — RERA-GRG-701-2020 — 31 December 2026
- Sobha City Phase 6 — RERA-GRG-1152-2022 — 31 December 2028 (part certificate link already shown)
- Phases 1–4 show OC/CC/PCC links on the register — Sobha City
Is a township better than a standalone project?
It depends on what you need; we do not rank formats. A township usually offers more open space, schools or retail planned inside the licence, and a long build-out, so your phase may be finished while construction continues next door. A standalone project is complete in one go but relies on the sector’s outside infrastructure. Whichever you choose, check three things: your phase’s RERA number and completion date, the licence that covers it, and which shared facilities (club, school site, roads) are inside your phase’s registration and which belong to later phases.
- Plot types and licences: HSVP Plots in Gurgaon vs Licensed Colony vs DDJAY Plots Compared
- New HRERA registrations this year: New Hrera Registrations, Gurgaon
- Total cost of a purchase: /calculators/gurgaon-total-cost