A site in a Bangalore-area layout can be sold only after the planning authority releases it. Under Section 17(2-C) of the Karnataka Town and Country Planning Act, a developer may opt for two stages. The first 40% of sites, scattered across the layout, are released on provisional approval, after the roads, parks and civic-amenity areas are relinquished, all corner sites are mortgaged to the authority and the project is RERA-registered. The remaining 60% and the corner sites are released with the final layout plan, once all development works are certified complete. Section 17(2-E) bars any khata or e-khata for a site that has not been released.

Updated 17 November 2026. We read the Gazette text of the 2021 amendment that set these stages, a 2025 law that still relies on Section 17(2-E), the 2026 Bill on penalties for incomplete layouts, and two RERA-registered plotted projects’ approval references.

How does the two-stage release work?

The Karnataka Town and Country Planning (Amendment) Ordinance, 2021, published in the Karnataka Gazette on 5 July 2021, substituted Section 17(2-C). It says the planning authority ‘may also permit the release of sites in two stages’ if the applicant wants. Before releasing the first 40%, the authority must:

  • Obtain a registered relinquishment deed giving the park, playground and roads to the local authority, and the civic-amenity (CA) area to the planning authority, without compensation.
  • Obtain a registered mortgage of all corner sites in the layout in its favour.
  • Ensure the project is registered under the Real Estate (Regulation and Development) Act, 2016.
  • Then mark the released 40% on the provisionally approved plan under its seal and send it to the local authority, so khatas can be issued for registration.

When are the remaining 60% of sites released?

Is this still the law? The Karnataka Gram Swaraj and Panchayat Raj (Amendment) Bill, 2025 requires compliance with ‘sub-section (2-E) of the section 17’ before any panchayat issues a new PID or khata, so the provision is still being applied in 2025 law.

  • All development works and infrastructure listed in Section 17(2-A) must be completed and inspected within three years of provisional approval. The authority may extend this by one year, with reasons recorded.
  • On completion certificates, including park, playground and CA development, the authority approves the final layout plan and releases the remaining 60% plus the mortgaged corner sites.
  • If works are not completed in time, the mortgaged corner sites are forfeited to the planning authority.
  • Section 17(2-D): for any provisionally approved layout, works must be finished within three years (extendable by up to one year), or the permission lapses and fresh approval is needed.
  • Section 17(2-E): a site not released ‘shall not be issued any Khata or given property index number (e-khata)’ under the municipal, panchayat or BBMP laws.

How did the rules change over time?

  • Until May 2005, private developers sold all sites once a local planning authority approved the layout (Citizen Matters, 2015).
  • A May 2005 BMRDA circular allowed sale of 60% of sites after approval, with the layout to be finished in five years.
  • Amendments gazetted on 10 September 2015 ended release at the plan-approval stage; sites were to be sold only after development.
  • The 2021 amendment above reintroduced an optional two-stage release, backed by the corner-site mortgage and RERA registration.
  • LA Bill No. 15 of 2026, passed by the Assembly (Govt Press copy dated 20 August 2026), adds Section 18-C. For layouts approved from 2005 until the 2015 amendment with incomplete works, the authority may give final approval and release the remaining sites after a penalty of 3% of the guidance value of those plots for each annual period. See Layout Penalty Karnataka 2026: 3% a Year for 2005-15 Layouts.

How do I read a release order or released layout plan?

  • Issuing authority and reference number: for example, BIAAPA approvals use references like ‘BIAAPA/TP/LAO/72/2025-26’ and STRR approvals like ‘STRRPA/TP/LAO/19/2022-23’.
  • Stage: provisional (first 40%) or final layout plan (balance 60% and corner sites).
  • Seal and list: released sites are marked on the plan under the authority’s seal. Your site number must be among them.
  • Dates: provisional approval date (the three-year clock starts here) and any extension.
  • Conditions: relinquishment deed number, corner-site mortgage, and RERA registration number.
  • Recipient: the copy sent to the local authority for khata issue, which is why the khata office should hold the same plan.

A buyer’s release checklist

  • Get the approval letter and the sealed layout plan, and find your site number on the released list.
  • Avoid corner sites in a provisionally approved layout until the final plan: they are mortgaged to the authority.
  • Confirm the project on K-RERA (rera.karnataka.gov.in) and match the approval reference.
  • Check that the CA site has been relinquished; BMRDA links CA-site notices for most authorities.
  • Confirm a khata can be issued: in panchayat areas use e-Swathu’s ‘Check whether this property can be Registered’; elsewhere see e-Khata guide, Bangalore.
  • Look at the conversion order behind the layout and the RTC history of the survey numbers.
  • Use /rera-index to compare RERA-registered projects.

Examples from RERA-registered plotted projects

These are neutral record facts as listed on our project pages, which reproduce the K-RERA entries. Prestige Marigold Phase II (Prestige Marigold) is registered on K-RERA as PRM/KA/RERA/1250/303/PR/171225/008346 (17 December 2025), with BIAAPA approval BIAAPA/TP/LAO/72/2025-26 dated 3 September 2025; it is under construction. Brigade Oasis Phase 3 (Brigade Oasis) is registered as PRM/KA/RERA/1250/303/PR/220124/006562 (22 January 2024), with approval STRRPA/TP/LAO/19/2022-23 dated 22 December 2023, and is listed as ready to move. In both cases, ask the developer for the sealed plan showing your site as released.

More plotted options around the airport belt are at Devanahalli, Bangalore.