Nadaprabhu Kempegowda Layout (NPKL) is a Bangalore Development Authority layout in west Bengaluru, near Kengeri, between Mysuru Road and Magadi Road. BDA began it in 2010 and has formed about 29,000 sites. More than 22,000 were allotted between 2016 and 2026, including 9,000 to landowners. A BDA official put infrastructure at nearly 90% complete in November 2026. The nearest Namma Metro stations are on the Purple Line along Mysuru Road: Kengeri Bus Terminal, Kengeri and Challaghatta.
Updated 17 November 2026. We checked BDA's November 2026 auction details as reported by The Hans India, earlier progress figures, the K-RERA order on the layout, the 9 November 2026 incentive-site announcement and Purple Line station records. BDA's website could not be reached, so check block-level works with BDA's West division.
Where is Nadaprabhu Kempegowda Layout?
NPKL lies near Kengeri, between Mysuru Road and Magadi Road. It covers more than ten villages, including Kenchanapura, Seegehalli, Kodigehalli, Manganahalli, Kommagatta, Challagatta and Ramasagara (The Hans India, January 2025). An 11 km Major Arterial Road runs through it from Magadi Road to the Bengaluru–Mysuru highway. Nearby area guides: Kengeri, Bangalore, Rajarajeshwari Nagar, Bangalore and Nagarbhavi, Bangalore.
How big is NPKL, and how do the numbers fit together?
The figures below come from different dates and do not all match. Here they are on one timeline:
- 2010: BDA begins the layout (The Hans India, 11 Nov 2026).
- Phase 1: about 4,040 acres notified, of which about 2,200 acres had been acquired by November 2026 (BDA via The Hans India, 11 Nov 2026).
- January 2025: more than 26,000 plots allotted, described as being built on “more than four thousand acres” (The Hans India, 16 Jan 2025).
- November 2025: works complete on about 2,800 acres, roughly 76% (Construction World, 17 Nov 2025).
- November 2026: about 29,000 sites formed, more than 22,000 allotted between 2016 and 2026, and nearly 90% of infrastructure complete (BDA official via The Hans India, 11 Nov 2026).
- Our read: “2,800 acres developed” and “2,200 acres acquired” cannot both describe the same land. Ask BDA for the figure for your block, and do not rely on headline percentages.
Which metro stations are closest to NPKL?
- Kengeri Bus Terminal (Purple Line): opened 30 August 2021
- Kengeri (Purple Line): opened 30 August 2021, next to Kengeri railway station
- Challaghatta (Purple Line terminus): opened 9 October 2023
- Pattanagere (Purple Line): opened 30 August 2021
- These stations run along Mysuru Road, and NPKL extends from there towards Magadi Road. Walking distance depends on your block, so check it on a map before you assume a metro commute. See /metro/bengaluru.
Who issues khata in NPKL, and is it RERA-registered?
NPKL was not among the eight layouts handed to GBA corporations in January 2026, so it stays a BDA layout. BDA moved its properties to e-khata in 2024; see e-Khata guide, Bangalore. On RERA, Karnataka RERA held in a November 2025 order that BDA is a “promoter” for its layouts and directed it to register NPKL as a real estate project. Look up the registration status on /rera-index.
How can you buy an NPKL site in November 2026?
BDA put 101 residential and commercial corner and intermediate NPKL sites up for e-auction from 17 to 20 November 2026. Registration closed at 5 pm on 16 November. The base price was ₹80,000 per sq m and the EMD ₹4 lakh. Winners pay 25% of the site value minus the EMD within 72 hours of the e-auction advice letter, or lose the EMD. Sites are sold as-is-where-is to Indian citizens. A BDA official put area market rates at ₹9,500 to ₹10,000 per sq ft.
Worked example: a 30x40 ft site is 111.48 sq m. At the base price of ₹80,000 per sq m that is ₹89,18,700. The 25% first payment is ₹22,29,675, and after deducting the ₹4 lakh EMD, ₹18,29,675 is due within 72 hours. Final bids are usually higher than base. Process notes: BDA e-Auction 2026: How to Bid, Reserve Prices and Checks.
What did BDA announce for NPKL landowners on 9 November 2026?
BDA will give one incentive site per acre to farmers who voluntarily surrendered land without litigation, especially for NPKL, subject to the rules. Sites will go wherever available, including in NPKL, with no lucky draw. The deadline is 17 December 2026, and names will appear on a “Wall of Gratitude” in the layout (PTI). Allottees from Arkavathy Layout were also given alternate NPKL sites in November 2025.
Are there RERA-registered apartments near NPKL?
If you would rather buy a flat than build on a site, RERA-registered projects in our catalogue around Kengeri and Mysuru Road include Provident Equinox 6 and Casagrand Aquene. Also see Provident Sunworth City near NICE Junction. Check each project's K-RERA page before booking.





