Wipro's corporate office is at Doddakannelli, Sarjapur Road, Bengaluru 560035. The closest residential pockets by road are Kaikondrahalli (2.4 km), Halanayakanahalli (3.1 km), Kasavanahalli (3.4 km) and Chikkanayakanahalli (4.0 km). Bellandur, Haralur, Kodathi and Carmelaram sit at 5–6 km, and HSR Layout, Gunjur, Koramangala and Marathahalli at 7–9 km. No metro station operates within about 5.7 km of the campus today; the nearest planned one is Bellandur on the Blue Line, about 1.7 km away in a straight line.
Updated 17 November 2026. We checked Wipro's own address, BMRCL's metro network table, the Karnataka RERA project list for eight projects, K-RIDE's May 2026 newsletter and a July 2026 report on Metro Phase 3A, and we computed road distances on OpenStreetMap. For prices and shortlists, see Flats Near Wipro Sarjapur Road 2026: Projects, Prices & Commute; this page is the orientation map.
Where exactly is the Wipro campus on Sarjapur Road?
Wipro's contact page gives the corporate office address as “Wipro Limited, Doddakannelli, Sarjapur Road, Bengaluru – 560 035”. OpenStreetMap places the corporate office at about 12.914° N, 77.686° E, less than 1 km west of Doddakannelli Lake.
That puts the campus on the Sarjapur Road stretch between the Outer Ring Road side (Bellandur, Agara, HSR Layout) and Carmelaram junction further out. Homes on both sides of this stretch can reach it, but crossing Sarjapur Road at peak hours is the slow part of most trips, so check which side a project's gate opens on. For the wider corridor, see Sarjapur Road, Bangalore and Sarjapur Road.
How far are nearby areas by road?
We group areas by road distance rather than minutes. The router's free-flow times (for example 10 minutes to HSR Layout) are far below what you will see at 9 am on Sarjapur Road, so quoting them would mislead. Treat the bands as ‘how much road you must cover’ and test the drive yourself at peak time.
- Band 1, under 5 km: Kaikondrahalli 2.4 km, Halanayakanahalli 3.1 km, Kasavanahalli 3.4 km, Chikkanayakanahalli 4.0 km, Bellandur 5.0 km.
- Band 2, 5–10 km: Haralur 5.3 km, Kodathi 5.5 km, Carmelaram 5.8 km, Gattahalli 6.5 km, HSR Layout 6.8 km, Gunjur 8.1 km, Koramangala 8.9 km, Marathahalli 9.1 km, Dommasandra 9.4 km.
- Band 3, 10–15 km: Varthur 10.8 km, Electronic City 12.3 km, Sarjapura town 13.9 km.
Which RERA-registered projects sit in each band?
Only projects found on the Karnataka RERA list on 17 November 2026 are named. ‘Proposed completion’ is the date the promoter filed with K-RERA. Always open the registration yourself before paying a token; see /rera-index for how.
- Band 1 – Brigade Gem, Chikkanayakanahalli/Doddakannelli (Brigade Gem): PRM/KA/RERA/1251/446/PR/210319/004042, registered 19 March 2021.
- Band 1 – Mana Verdant Terraces, Doddakannelli (Mana Verdant Terraces): PRM/KA/RERA/1251/446/PR/041225/008303, registered 4 December 2025, proposed completion 31 December 2031.
- Band 1 – Mana Cresta, Chikkanayakanahalli (Mana Cresta): PRM/KA/RERA/1251/446/PR/161224/007303, registered 16 December 2024, proposed completion 31 December 2028.
- Band 1 – Salarpuria Sattva Signet, Kasavanahalli (Salarpuria Sattva Signet): PRM/KA/RERA/1251/446/PR/210111/003772, registered 11 January 2021.
- Band 2 – Godrej Lakeside Orchard, Kodathi (Godrej Lakeside Orchard): PRM/KA/RERA/1251/446/PR/300924/007105, registered 30 September 2024, proposed completion 30 September 2030.
- Band 2 – Birla Evara, Kodathi (Birla Evara): PRM/KA/RERA/1251/446/PR/060225/007487, registered 6 February 2025, proposed completion 25 December 2031.
- Band 2 – Mana Dale, Kodathi (Mana Dale): PRM/KA/RERA/1251/446/PR/091123/006409, registered 9 November 2023, proposed completion 31 December 2032.
Is there a metro near Wipro Sarjapur Road?
Not an operating one. The nearest open stations, Kudlu Gate and Singasandra on the Yellow Line, are about 5.7 km away in a straight line and more than 8 km by a walking route. What is coming:
- Blue Line Phase 2A (BMRCL): Central Silk Board to KR Puram, 19.75 km, 13 elevated stations including Agara, Ibbalur, Bellandur and Kadubeesanahalli. Bellandur station is about 1.7 km from the campus in a straight line. Swarajya reported on 16 August 2026 that commercial service was unlikely in 2026 and could come by mid-2027; see Blue Line Metro Trial Run KR Puram to Marathahalli: Nov 2026 for the trial runs.
- Metro Phase 3A, Sarjapur to Hebbal: a 15 July 2026 report said the revised plan is 37.8 km at ₹25,999 crore, Union approval was still pending, and the target is April 2033. The station list we could open does not confirm a stop at Doddakannelli or Wipro, so do not assume one.
- Suburban rail Kanaka line (Corridor 4): Carmelaram station is about 2.7 km from the campus in a straight line. K-RIDE's May 2026 newsletter says barricading and excavation are in progress at Karmelaram station and the raft concrete is complete at Bellandur station.
How should you test the commute before buying?
- Drive the route twice, once between 8.30 and 10 am and once between 6 and 8 pm, from the project gate to the campus gate you will use.
- Check which side of Sarjapur Road the project opens on. A Band 1 home that needs a U-turn across the road can take longer than a Band 2 home on the same side.
- If you plan to use the Blue Line later, measure the distance from the project to Bellandur or Agara station, not to ‘Sarjapur Road’.
- For the Kodathi cluster, compare the Carmelaram suburban station and the Sarjapur Road drive; they serve different directions.




