Gurgaon has three ‘peripheral’ roads. The Southern Peripheral Road (SPR) runs about 12 km from NH-48 to the Gurgaon–Faridabad road, crossing Sohna Road at Vatika Chowk and passing the Golf Course Extension Road belt. The Northern Peripheral Road (NPR) is the Haryana stretch of the Dwarka Expressway. The Central Peripheral Road (CPR) is a link of about 3.2 km built in the Dwarka Expressway's last package, between the Kherki Daula end and Harsaru.

Updated 17 November 2026. We checked PIB's 2022 Dwarka Expressway release, GMDA's January 2025 SPR corridor figures (via The Tribune), the 8 October 2026 SPR elevated-road tender, the September 2026 CPR service-road proposal and the 2023 CPR opening report. We could not open the Development Plan 2031 drawings today, so we do not quote road widths: reports give 84 m and 90 m for the SPR and we could not settle which is right.

What is the SPR route on the map?

  • Start: NH-48 (Delhi–Jaipur highway), at the Dwarka Expressway cloverleaf end.
  • Vatika Chowk: SPR meets Sohna Road (NH-248A).
  • East towards Ghata: the SPR passes the Golf Course Extension Road belt.
  • End: the Gurgaon–Faridabad road. GMDA gives the NH-48 to Faridabad Road length as 12 km, with a green belt of 80 acres on each side (160 acres in all).

Which sectors are on the SPR?

GMDA's October 2026 tender names the junctions the elevated road is meant to relieve: Sectors 69, 70, 71/72, 70/75, 71/74, 75/75A and 74/74A. Further east the SPR runs past the Golf Course Extension Road sectors. Sector pages: Sector 69 Gurgaon, Gurgaon, Sector 70 Gurgaon, Gurgaon, Sector 70a Gurgaon, Gurgaon, Sector 71 Gurgaon, Gurgaon, Sector 73 Gurgaon, Gurgaon, Sector 76 Gurgaon, Gurgaon and Sector 77 Gurgaon, Gurgaon. Registered projects on the road include Signature Global Cloverdale SPR and DLF Privana South.

What is the SPR elevated road and when could it be built?

  • Phase 1: a 4.23 km elevated road from Vatika Chowk to the Dwarka Expressway cloverleaf on NH-48, estimated at ₹776 crore (Rs 7.76 bn) on EPC, to be built in 30 months from award. Bids were due by 18 November 2026.
  • Design: four elevated lanes each way, 3+3-lane primary service roads and 2+2-lane secondary service roads, access roads towards Sectors 75 and 75A and towards Tulip Chowk, plus ramps, loops and U-turns.
  • Why: GMDA's traffic studies project peak-hour traffic above 10,000 car units at these junctions within 10 years.
  • Phase 2: a grade-separated interchange at Vatika Chowk. Phase 3: an 8.5 km elevated corridor from Vatika Chowk to Ghata. DPRs for both were being prepared as of October 2026.
  • Follow-up after bids close: SPR Elevated Road After 18 Nov 2026: What Happens Next and SPR Gurgaon News: ₹776 Crore Elevated Road Tender, Explained.

What is the Northern Peripheral Road (NPR)?

The NPR is the Dwarka Expressway's Haryana portion. The road ministry said in July 2022 that the Dwarka Expressway is ‘also known as the Northern Peripheral Road in Haryana portion’. That 19 km Haryana section has been open since 11 March 2024 and the Delhi section since 17 August 2025. Sectors 99–115, 36A, 37C/37D and 88–89 front it. See Dwarka Expressway, Gurgaon and Dwarka Expressway area guide.

What is the Central Peripheral Road (CPR)?

A May 2023 report on its opening describes the CPR as about 3.2 km long and part of the Dwarka Expressway's fourth package (Basai road under-bridge to NH-8 near Kherki Daula, 8.76 km, ₹2,182 crore), running from near the Kherki Daula toll plaza to Harsaru village. It was opened to traffic as a temporary measure while loops were completed. The Haryana ward order for MC Manesar (3 November 2023) also refers to a ‘CPR Road’ at the Harsaru–Bamroli village boundary.

Local access is still being added. On 10 September 2026 it was reported that GMDA had sent NHAI a revised proposal to acquire 5.21 acres in Sihi and Mohammadpur Jharsa villages for a 12 m service road along the CPR, from the Elan Mall stretch towards NH-48, so that licensed colonies get direct access. NHAI was reviewing it.

How do the three roads connect?