58% of the K-RERA housing projects still being built in our Bengaluru dataset (52 of 90) sit outside all five Greater Bengaluru Authority corporations. Inside the GBA, the East and South corporations hold most of the pipeline; the Central corporation has none with a registered completion date after November 2026.
Updated 8 November 2026. We placed every K-RERA project with a checked map pin into the 369-ward map notified on 19 November 2025, and counted projects and registered units per corporation. Elections to the five corporations are due in December 2026 under a Supreme Court order of 17 July 2026 (Deccan Chronicle, 17 July 2026).
How many RERA projects does each GBA corporation have?
Projects under construction means a registered completion date on or after 1 November 2026. Units are the totals K-RERA lists for each project; K-RERA gives a unit count for 67 of the 90, so read the unit column as a floor.
- Outside the GBA: 52 projects under construction (57.8%) · 25,247 units (62.2%) · 84 of all 171 pinned projects
- Bengaluru South: 14 under construction (15.6%) · 4,875 units (12.0%) · 29 of 171
- Bengaluru East: 13 under construction (14.4%) · 6,905 units (17.0%) · 26 of 171
- Bengaluru North: 7 under construction (7.8%) · 2,412 units (5.9%) · 16 of 171
- Bengaluru West: 4 under construction (4.4%) · 1,125 units (2.8%) · 7 of 171
- Bengaluru Central: 0 under construction · 0 units · 9 of 171 (all with registered completion dates before November 2026)
- Total: 90 under construction · 40,564 listed units · 171 pinned projects
Is new housing moving outside the GBA?
Yes, on these numbers. Of the 58 pinned projects registered before 2020, 19 (33%) are outside the five corporations. Of the 36 registered in 2025 and 2026, 25 (69%) are outside. The new registrations cluster around Devanahalli, Bagalur, Budigere Cross, Sarjapur and the Hosur Road belt beyond Electronic City.
That matters for buyers because khata, property tax and building approvals inside the GBA run through your corporation. Outside it, they run through whichever local body covers the site, so check that first. Our guide to the corporations themselves is Greater Bengaluru Authority: 5 Corporations, Khata, Tax 2026.
Which large projects sit in each corporation?
The three largest under-construction projects by K-RERA unit count in each, with the ward our map places them in and the registered completion date.
- East (50 wards): Evergreen @ Prestige Raintree Park, PRM/KA/RERA/1251/446/PR/010126/008374, 2,000 units, Varthur ward, 30 Jun 2030 — Prestige Evergreen; Prestige Raintree Park, PRM/KA/RERA/1251/446/PR/270824/006981, 1,520 units, 31 Dec 2028 — Prestige Raintree Park; Brigade Lakecrest, PRM/KA/RERA/1251/446/PR/240625/007866, 604 units, Bhattarahalli ward, 31 Mar 2030.
- South (72 wards): Prestige Southern Star, PRM/KA/RERA/1251/310/PR/210325/007603, 2,130 units, Beguru ward, 30 Sep 2029 — Prestige Southern Star; Assetz Meru & Meadow, PRM/KA/RERA/1251/310/PR/130625/007828, 520 units, Anjanapura ward, 30 Nov 2030; Casagrand Amor, PRM/KA/RERA/1251/310/PR/140324/006701, 480 units, 23 Feb 2028.
- North (72 wards): Brigade Eternia, PRM/KA/RERA/1251/309/PR/070325/007559, 1,124 units, 31 Mar 2030 — Brigade Eternia; Godrej Woods, PRM/KA/RERA/1251/472/PR/121125/008248, 558 units, Kogilu ward, 30 Nov 2030; Brigade Insignia, PRM/KA/RERA/1251/309/PR/180524/006894, 379 units, 30 Jun 2029.
- West (112 wards): Sattva Aaranya, PRM/KA/RERA/1251/310/PR/241225/008358, 418 units, 23 Jan 2031; Purva Blubelle, PRM/KA/RERA/1251/310/PR/290323/005829, 378 units, 30 Jun 2029; Sobha Royal Crest, PRM/KA/RERA/1251/309/PR/300522/004936, 329 units, 31 Dec 2028.
- Central (63 wards): none under construction in our pinned set.
- Outside the GBA: Prestige Park Grove, PRM/KA/RERA/1251/446/PR/100823/006141, 3,715 units, 31 Dec 2027 — Prestige Park Grove; Sattva City, PRM/KA/RERA/1251/472/PR/270226/008494, 2,477 units, 28 Feb 2032; Barca at Godrej MSR City, PRM/KA/RERA/1250/303/PR/010425/007644, 1,961 units, 31 Mar 2030.
How the corporations compare on wards and voters
Ward counts are from the final 369-ward map; voter counts are the April 2026 figures compiled on Wikipedia's page for the 2026 GBA elections. East has the fewest wards and voters but the second-largest housing pipeline inside the GBA. Its 50 wards cover the K.R. Pura and Mahadevapura constituencies (Wikipedia, Bengaluru East City Corporation).
- Central: 63 wards · 14,25,676 voters
- North: 72 wards · 19,54,272 voters
- South: 72 wards · 17,44,611 voters
- East: 50 wards · 10,41,396 voters
- West: 112 wards · 27,26,573 voters
Data note: how we counted
What we counted: K-RERA project registrations in Property Point's dataset of 341 unique Bengaluru registrations (src/data/rera/projects.json, generated 28 October 2026 from rera.karnataka.gov.in), one record per registration number. We used only the 171 projects whose map pin was placed on the project itself and checked by hand or on Ola Maps on 28 October 2026; 80 projects with only a locality-level pin and 90 with no pin were left out.
How: each pin was tested against the 369 ward polygons in OpenCity's GBA ward map (gba-369-wards-december-2025.kml), which carries the corporation and Assembly constituency of every ward. A pin outside every polygon is counted as outside the GBA. One pin (Meridian Park @ The Prestige City, Sarjapur) was geocoded to a Subramanyapura address; we counted it as outside the GBA, where the project is. It has no effect on the under-construction counts. Under construction means a registered completion date (K-RERA's revised date) on or after 1 November 2026.
Limits: this is a curated dataset of projects we track, not the whole K-RERA register, so the shares describe our dataset. Unit totals cover only projects for which K-RERA lists a unit count. A pin sits at one point; a large site can straddle a ward boundary.
Free to reuse with credit: Property Point Research, mypropertypoint.com/blog/gba-corporations-rera-projects-count-2026