Adani The Marq is Adani Realty's two-tower, 46-storey project in Sectors 102 and 102A on the Dwarka Expressway. Adani's own page puts the starting price at ₹4.60 Cr. HARERA Gurugram registered it on 24 February 2026 as GGM/1042/774/2026/14, for 368 homes on 5.16 acres, with a completion date of 31 December 2031.

Updated 3 November 2026. We read the HARERA registration page and project form, Adani's project page and the ranking portal pages. Portal prices differ from Adani's, and their 'carpet' sizes do not match HARERA's, so we explain both below.

What is the price of Adani The Marq?

Adani Realty's page says prices start at ₹4.60 Cr and does not say whether taxes or charges are included. Our listing uses that figure: from ₹4.60 Cr (our listing, checked November 2026).

Portal pages quote less. Realtyhunting showed an indicative ₹3.85 Cr onwards on 22 September 2026, and Homebazaar showed ₹4 Cr onwards on 27 October 2026. Neither published a dated price list from Adani. Treat these as approximate. The developer's figure is the one to ask about.

Adani gives unit sizes as 2,565 to 3,559 sq ft of 'RERA carpet + exclusive area'. On that basis, ₹4.60 Cr for the smallest home works out to about ₹17,900 per sq ft (our arithmetic). Add GST, stamp duty and registration on top; see Gurgaon stamp duty calculator.

Is Adani The Marq RERA-registered?

Yes. HARERA Gurugram's project page shows:

  • Registration: RC/REP/HARERA/GGM/1042/774/2026/14, dated 24 February 2026; certificate uploaded 2 March 2026
  • Promoter: Adani M2K Realtors LLP, applying as a collaborator with the licensee, Radhey Buildhome Pvt Ltd
  • Site: Sectors 102 and 102A, Tehsil Gurgaon, 5.1625 acres
  • DTCP licences: No. 24 of 2012 (27 March 2012) and No. 131 of 2025 (29 July 2025)
  • Building plan approval: memo ZP-796/SD(RD)/2026/2462, 20 January 2026
  • Proposed construction start: 1 April 2026. Proposed completion: 31 December 2031
  • Estimated project cost: ₹1,197.67 crore, of which land ₹252 crore and apartment construction ₹658.50 crore

What is the launch date of Adani The Marq?

The earliest date The Marq could legally be marketed or booked is its HARERA registration, 24 February 2026; the certificate was uploaded on 2 March 2026. HARERA's form shows a proposed construction start of 1 April 2026. We found no separate launch-event date on Adani's page. Portals list it as a 2026 new launch.

If a broker offers you a 'launch price' for a later phase or a tower that is not in this registration, ask for the HARERA number that covers it.

How much can be built on the site?

HARERA's form gives a permissible FAR of 3.12 and a proposed FAR of 3.1136 on 5.1625 acres. In other words, the design uses almost all of the floor area the licence allows. That fits the two-tower, 46-storey form Adani describes, with three basement levels and a standalone club shown in the uploaded plans. The licensee is Radhey Buildhome Pvt Ltd, and Adani M2K Realtors LLP is the promoter as collaborator. Your agreement for sale should name both.

What sizes and floor plans does The Marq offer?

Adani lists 3 BHK, 3 BHK + study, 3 BHK + study + service personnel room and 4 BHK. Its unit plans are named 4BHK, 3BHK-A, 3BHK-B, 3BHK-B' and 3BHK-A Service Personnel.

HARERA's unit table gives the pure carpet area of each home in square metres. Converted at 10.7639 sq ft per sq m, the 368 homes are:

  • 1,081 sq ft carpet — 8 homes
  • 1,126 sq ft carpet — 8 homes
  • 1,288 to 1,289 sq ft carpet — 176 homes
  • 1,333 sq ft carpet — 47 homes
  • 1,386 sq ft carpet — 37 homes
  • 1,786 sq ft carpet — 92 homes

Adani does not publish which plan matches which size, so ask for the floor plan of the exact unit before you book. The table also lists 74 small units of about 114 to 207 sq ft. These are not homes and are left out of the 368.

This explains the gap with portals. HARERA's carpet area excludes balconies and other exclusive areas. Adani's 2,565 to 3,559 sq ft adds those areas, and portal '2,350 sq ft carpet' figures match neither. When you compare The Marq with another project, compare HARERA carpet with HARERA carpet. Our checklist is at How to Compare Two Residential Projects Like a Professional: The Carpet-Area, RERA and Track-Record Checklist.

When is possession at Adani The Marq?

The HARERA completion date is 31 December 2031, and Adani's page shows the same date as possession. Construction was proposed to start on 1 April 2026, so the filed schedule is about five years and nine months. Homebazaar shows 'May 2031' in one place, which is not on HARERA or Adani's page. Use 31 December 2031 for planning.

Where is Sector 102A and how is it connected?

Adani's page places The Marq at the junction of 60 m and 75 m sector roads with direct access to the Dwarka Expressway. It says the site has quick access to IGI Airport and Aerocity and mentions an upcoming metro, but gives no distances or timeline. Adani's April 2026 blog on Sector 102 refers to a planned metro extension towards Sector 103, again without dates.

Portals add travel times, such as 15 to 20 minutes to IGI Airport. These are their own claims, so test the drive at your usual commute hour. The sector page Sector 102 Gurgaon, Gurgaon and the corridor page Dwarka Expressway, Gurgaon list what is around it.

Is there an Adani The Marq brochure PDF?

Adani's page links unit plans for each type but does not publish a brochure as a direct download. Ask Adani Realty or its sales team for the brochure and a dated price list. For the legal documents, HARERA's project page has the uploaded files, including the building plan approval. Our guide How to Read a RERA Project Page, Step by Step: K-RERA, HRERA Gurugram and TNRERA shows where each one sits.

What are the amenities at The Marq?

Adani lists a G+2 clubhouse called The M Club with squash and badminton courts, a mini theatre, spa room, day café and infinity pool. Other listed facilities include indoor and outdoor pools, a ballroom and banquet hall, a gym and yoga studio, a pickleball court, business centre, salon, creche, kids' play area and event lawn. Morphogenesis is named as architect and Oracle as landscape designer. The clubhouse and towers have separate entry and exit points.

Who is The Marq suited to?

On the filed facts, The Marq suits a buyer who wants a 3 BHK of about 1,288 to 1,386 sq ft carpet, or a 4 BHK of about 1,786 sq ft carpet, in a high-rise on the Dwarka Expressway, and who can wait until the end of 2031. It has 368 homes on 5.16 acres in two towers, with a separate G+2 club.

If you want a low-rise home sooner, Adani's own Samsara Ivana 2.0 floors in Sector 63 show possession in September 2030, at a higher entry price. If you want a lower ticket on the same corridor, compare the Sector 103 and 104 launches below on carpet area, not on headline price.

What else is new near Sector 102?

For the whole corridor, read Dwarka Expressway 2026: A Sector-by-Sector Buyer's Map.

  • AIPL Riviera at Lake City — Sector 103 — from ₹3.94 Cr (portal, approx) — completion Jun 2033 — GGM/1019/751/2025/122. See AIPL Riviera at Lake City
  • Aquaria at AIPL Lake City — Sector 103 — price on request — completion Mar 2034 — GM/1063/795/2026/35. See Aquaria at AIPL Lake City
  • Satya Levante Residences — Sector 104 — from ₹3.03 Cr (portal, approx) — completion Mar 2032 — GGM/1000/732/2025/103. See Satya Levante Residences
  • Adani Samsara Ivana 2.0 — Sector 63, Golf Course Extension Road — 4 BHK floors from ₹6.09 Cr (Adani page) — possession Sep 2030 per Adani. See Adani Samsara Ivana 2.0

What should you check before booking at The Marq?

  • Get Adani's price list in writing, with the area basis (carpet plus exclusive area) and every charge named.
  • Match your unit's HARERA carpet area to the agreement for sale.
  • Pay no more than 10% before the agreement for sale is registered (RERA Act, Section 13).
  • Pay only into the project account shown on HARERA.
  • Plan finances for completion on 31 December 2031.