Sector 37 Gurgaon is quoted as 122004 by NoBroker and 122001 by Aurum PropTech. Both are valid India Post pins. Sector 37, 37A and 37B are three separate sectors west of Hero Honda Chowk, and 37C and 37D are different sectors again. There is no working metro yet. Millennium City Centre is about 12 km by road, but GMRL's Phase 1 line, under construction since November 2025, lists a ‘Sector 37’ station. On the 2026-27 Kadipur list, Sector 37 residential plots are ₹75,900 per sq yd on the sector's own row.

Updated 18 November 2026. We checked the pins on India Post's directory, read the 2026-27 Kadipur sub-tehsil collector list row by row, searched HRERA's registered-projects list for 37, 37A and 37B, and opened GMRL's station list. Sector outlines and distances are from OpenStreetMap and OSRM routing.

What is the pin code of Sector 37, 37A and 37B Gurgaon?

  • 122004: Narsinghpur sub office (branch offices Khandsa, Kherki Daula, Lakhnaula, Sikanderpur, Sikohpur). NoBroker's pin for Sector 37.
  • 122001: Gurgaon Head Office (delivery) and the Khandsa Road sub office. Aurum PropTech's pin.
  • India Post does not map pins to sector numbers, so neither source can be called wrong. 37A and 37B have no separate pins. Use the pin on your allotment letter or factory licence.

Where are Sector 37, 37A and 37B?

OpenStreetMap draws each as its own sector boundary. Measured from Sector 37's centre point:

Many ranking pages mix these up, and Noida also has a Sector 37. Check the sector in the licence or HRERA record, not just the listing title.

Is there a metro station in Sector 37?

Not yet, but one is planned. GMRL's Phase 1 station list includes Sector 37, along with Hero Honda Chowk, Sector 33, Sector 10 and Basai (India TV, 7 July 2025). Piling for the line began at Sector 44 on 27 November 2025, and Phase 1 is targeted for 2028 (Swarajya, 28 November 2025). That supports NoBroker's ‘upcoming metro’ note, but no published source gives an exact distance like ‘1 km’, because station sites are not yet shown on a public plan.

  • Working now: Millennium City Centre, 7.7 km straight line, 12.0 km by road from Sector 37's centre. NoBroker says ‘within 9 km’.
  • IFFCO Chowk: 8.3 km straight line, 12.5 km by road. NoBroker says 10 km.
  • MG Road: 9.3 km straight line, 11.9 km by road.
  • Railway: Basai Dhankot station, 3.8 km straight line, 6.1 km by road.

How far is Sector 37 from Cyber City and the airport?

  • Cyber City (Rapid Metro station): 11.3 km straight line, 14.2 km by road. NoBroker's FAQ says about 13 km.
  • IGI Airport Terminal 3: 15.8 km straight line, 22.9 km by road.
  • Gurgaon railway station: 6.2 km straight line, 7.9 km by road.

What is the collector rate in Sector 37, 37A and 37B for 2026-27?

The Kadipur list (effective 1 April 2026) has two residential rows that cover Sector 37, and they disagree.

  • ‘Sec-37’ row: residential ₹75,900 per sq yd (₹66,000 in 2025-26, up 15%); commercial ₹86,625 (up 75%); industrial ₹66,125 (unchanged).
  • ‘Sector 33, 34, 35, 36, 37, 37A’ row: residential ₹85,800 per sq yd (up 30%); commercial ₹3,54,375 per sq yd (up 75%). This is the only row that names 37A.
  • Flats in licensed group housing in Sectors 33–37A: ₹7,500 per sq ft. Sectors 37C and 37D: ₹6,500 per sq ft.
  • Built industrial property in ‘Pace City, Infocity, Sec-34, 37’: land cost + ₹900 per sq ft.
  • Sector 37B: not named in any row of the Kadipur, Gurugram, Wazirabad, Badshahpur, Manesar or Harsaru lists we read.

Worked example: a 300 sq yd residential plot is 300 × ₹75,900 = ₹2.28 crore on the Sec-37 row, or 300 × ₹85,800 = ₹2.57 crore on the combined row. Ask the sub-registrar which row your khasra falls under before you pay stamp duty. For 37B, ask which village row applies. See Gurgaon circle rates.

Are there RERA-registered projects in Sector 37, 37A or 37B?

HRERA's list (opened 18 November 2026) has one registration addressed to Sector 37 itself, and none to 37A or 37B:

  • Imperia Shopping Central (commercial) — Imperia Wishfield: RERA-GRG-1009-2022, certificate dated 11 July 2022, village Gadoli Khurd, tehsil Kadipur. The list marks it completed.

Most new homes near Hero Honda Chowk are in 37C and 37D. Two examples from the same list are BPTP The Amaario, 37D (RERA-GRG-1470-2023): BPTP The Amaario, and Signature Global Sarvam at DXP Estate, 37D (RERA-GRG-2083-2025, certificate dated 7 November 2025): Signature Global Sarvam. Sector 37's own collector rows, with industrial land and the Pace City and Infocity entry, point to an industrial base rather than housing. For the junction itself, see Hero Honda Chowk to Umang Bhardwaj Chowk Elevated Road.