On the HRERA Gurugram register, more than 20 housing registrations along Golf Course Extension Road (GCER, Sectors 59 to 67A) show an occupation, completion or part-completion certificate (OC/CC/PCC) document, including Emaar’s Palm Terraces Select and Emerald Estate, M3M Latitude and Route65, Ireo The Corridors, Mahindra Luminare, Pioneer Presidia and Smartworld Orchard. Eight more under-construction projects carry RERA completion dates on or before 30 June 2027, led by Birla Navya Anaika, Anant Raj’s Ashok Estate and Emaar Marbella Phase 7 (31 December 2026) and Trump Towers (28 June 2027).
Updated 20 November 2026. We read every GCER-sector row on the HRERA Gurugram register, noting whether an OC/CC/PCC document is listed and the “registration up to” date. An OC/CC/PCC entry can cover all or only some towers, so open the document for your tower. Resale prices come from portals and change daily, so we do not quote them.
Ready to move and nearing possession on GCER at a glance
Label A = OC/CC/PCC document listed on HRERA. Label B = under construction, RERA completion date by 30 June 2027. Format: Project — Builder — Sector — HRERA no. — Label.
- Palm Terraces Select; Palm Drive & Palm Terrace Select — Emaar — 66 — RERA-GRG-627-2020; RERA-GRG-721-2020 — A
- Marbella (villas) — Emaar — 65/66 — RERA-GRG-610-2020 — A
- Emerald Estate; Emerald Classic — Emaar — 65 — RERA-GRG-442-2019; RERA-GRG-260-2019 — A
- Emerald Hills (plots) — Emaar — 62/65 — RERA-GRG-643-2020 — A
- Emaar Digihomes — Emaar — 62 — RERA-GRG-180-2019 — A
- M3M Latitude (Tower R-01); M3M Heights and Skycity; M3M Route65 — M3M — 65 — RERA-GRG-602-2020; RERA-GRG-1284-2023; RERA-GRG-1548-2024 — A
- Countryside Residences — Countryside Properties — 65 — RERA-GRG-1027-2022 — A
- Presidia (Towers C, D, E); Pioneer group housing — Pioneer Urban — 62 — RERA-GRG-419-2019; RERA-GRG-346-2019 — A
- Luminare Phase I and Phase 2 — Mahindra Homes — 59 — RERA-GRG-512-2019; RERA-GRG-408-2019 — A
- Elevate Phase I and II — Heritage Max Realtech — 59 — RERA-GRG-120-2018; RERA-GRG-710-2020 — A
- Midtown — Pyramid Home Developers — 59 — RERA-GRG-672-2020 — A
- Smartworld Orchard — Suposhaa Realcon (Smartworld) — 61 — RERA-GRG-1121-2022 — A
- Samsara Avasa; Samsara Vilasa & Arya — Adani Brahma Synergy — 63 — RERA-GRG-1150-2022; RERA-GRG-985-2021 — A
- Birla Navya Drisha 1B — Avarna Projects — 63A — RERA-GRG-1011-2022 — A
- Shree Vardhman Mantra — Shree Vardhman Buildprop — 67 — RERA-GRG-946-2021 — A
- The Corridors Phase 1 and 2 — Ireo Grace Realtech — 67A — RERA-GRG-787-2020; RERA-GRG-1644-2024 — A
- Birla Navya Anaika; Ashok Estate; Marbella Phase 7 — 63A/63A/66 — RERA-GRG-1012-2022; RERA-GRG-1085-2022; RERA-GRG-2230-2026 — B (31 Dec 2026)
- Signature Global City 63A — 63A — RERA-GRG-1023-2022; RERA-GRG-1063-2022 — B (24 and 26 Feb 2027)
- Paras Floret — 59 — RERA-GRG-1119-2022 — B (31 Mar 2027)
- Birla Navya Avik Phase 1 — 63A — RERA-GRG-1233-2022 — B (30 Apr 2027)
- Trump Towers Delhi NCR — 65 — RERA-GRG-1388-2023 — B (28 Jun 2027)
- Floret Central — 59 — RERA-GRG-1450-2023 — B (30 Jun 2027)
Emaar Palm Terraces Select, Emerald Estate and Marbella, Sectors 65–66
Emaar (filed as Emaar MGF Land) has the largest cluster of completed registrations on the corridor: Palm Terraces Select (RERA-GRG-627-2020) and Palm Drive & Palm Terrace Select (RERA-GRG-721-2020) in Sector 66, Emerald Estate (RERA-GRG-442-2019, Maidawas) and Emerald Classic (RERA-GRG-260-2019) in Sector 65, the Marbella villas (RERA-GRG-610-2020) and the Emerald Hills plots (RERA-GRG-643-2020). All show an OC/CC/PCC document on HRERA. Our pages: Emaar Palm Terraces Select, Emaar Emerald Estate, Emaar Emerald Classic, Emaar Marbella and Emaar Emerald Hills.
M3M Latitude, Heights, Skycity and Route65, Sector 65
M3M’s Sector 65 homes are filed by Manglam Multiplex. M3M Latitude Tower R-01 (RERA-GRG-602-2020), the mixed-use registration covering M3M Heights and M3M Skycity (RERA-GRG-1284-2023) and M3M Route65 (RERA-GRG-1548-2024, which superseded RERA-GRG-1124-2022) all list an OC/CC/PCC document, and the register marks the Skycity/Heights and Route65 registrations as completed. Our page: M3M Latitude.
Ireo The Corridors, Sector 67A
Ireo Grace Realtech’s The Corridors is registered in two phases at Villages Dhumaspur and Maidawas, Sector 67A: Phase 1 (RERA-GRG-787-2020) and Phase 2 (RERA-GRG-1644-2024). Both show an OC/CC/PCC document. Portal listings for this project sometimes still show an old “possession by” date; the HRERA document is the better check.
Mahindra Luminare, Elevate and Midtown, Sector 59
Sector 59 at Village Behrampur has three completed clusters on the register: Mahindra Homes’ Luminare Phase I “Sirius” (RERA-GRG-512-2019) and Phase 2 “Solaris” (RERA-GRG-408-2019); Heritage Max Realtech’s Elevate Phase I (RERA-GRG-120-2018) and Phase II (RERA-GRG-710-2020); and Pyramid Home Developers’ Midtown (RERA-GRG-672-2020, Behrampur and Ullawas). Luminare Phase 3 (Tower B, RERA-GRG-934-2021) is a separate registration, so check which phase a resale flat sits in. Sector page: Sector 59 Gurgaon, Gurgaon.
Pioneer Presidia and Smartworld Orchard, Sectors 61–62
Pioneer Urban’s Presidia (Towers C, D, E and shops, RERA-GRG-419-2019) and its Sector 62 group-housing registration (RERA-GRG-346-2019) both list OC/CC/PCC documents; Pioneer’s new Alura (RERA-GRG-2049-2025) is under construction in the same district. Smartworld Orchard in Sector 61 (RERA-GRG-1121-2022, promoter Suposhaa Realcon) also lists one. Our page: Smartworld Orchard.
Adani Samsara Avasa and Vilasa, Sector 63
Adani Brahma Synergy’s Samsara Avasa (RERA-GRG-1150-2022, Block L, Ullahawas) and Samsara Vilasa & Samsara Arya (RERA-GRG-985-2021) list OC/CC/PCC documents, and both registrations run to 31 December 2026. Ask which towers or floors the certificate covers. Our page: Adani Samsara Vilasa.
Birla Navya Anaika and Avik Phase 1, Sector 63A
Avarna Projects LLP (Birla Estates) has two low-rise registrations finishing soon: Birla Navya Anaika (RERA-GRG-1012-2022), RERA completion 31 December 2026, and Avik Phase 1 (RERA-GRG-1233-2022), 30 April 2027. Its earlier Drisha 1B (RERA-GRG-1011-2022) already lists an OC/CC/PCC document. Our page: Birla Navya.
Ashok Estate and Signature Global City 63A, Sector 63A
Anant Raj’s Ashok Estate (RERA-GRG-1085-2022) carries a RERA completion date of 31 December 2026. Signature Global City 63A’s independent floors at Village Kadarpur are registered as RERA-GRG-1023-2022 (24 February 2027) and RERA-GRG-1063-2022 (26 February 2027). Our page: Signature Global City 63A.
Marbella Phase 7, Sector 66
Emaar India’s Marbella Phase 7 (RERA-GRG-2230-2026) is a 0.647-acre villa phase registered on 5 August 2026 with a RERA completion date of 31 December 2026, the shortest timeline on the corridor. Our page: Emaar Marbella.
Trump Towers Delhi NCR, Sector 65
Trump Towers Delhi NCR is filed by Olive Realcon Pvt Ltd as RERA-GRG-1388-2023, with a RERA completion date of 28 June 2027. It is the corridor’s nearest-term ultra-luxury tower on the register. Our page: Trump Towers Delhi NCR (Gurgaon).
Paras Floret and Floret Central, Sector 59
Two Sector 59 registrations by related companies finish in the first half of 2027: Paras Floret (RERA-GRG-1119-2022, promoter Corona Realtors), 31 March 2027, and Floret Central (RERA-GRG-1450-2023, promoter Cornona Realtors), 30 June 2027. Our page: Paras Floret.
What to check before buying a ready-to-move flat on GCER
- The OC/CC/PCC on HRERA names your tower and floor count. A part-completion certificate may not cover every tower.
- The seller’s chain of title, conveyance deed and any bank charge; for older projects, the original allotment and builder-buyer agreement.
- Society or maintenance-agency dues and the transfer charges the agency levies.
- Price: compare the asking price with recent registered deals and the collector rate for the sector; see Golf Course Extension Road & SPR Collector Rates 2026-27 and run costs through /calculators/gurgaon-total-cost.
- If you can wait a few months, the Label B projects above and Golf Course Extension Road Possession 2027: HRERA List list homes due in 2027. Corridor guide: Golf Course Extension Road 2026: The Buyer's Guide, Sector by Sector.