Under PM Surya Ghar, a BESCOM household in Bangalore gets a central subsidy of ₹30,000 for a 1 kW rooftop plant, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more. You register on the national portal (pmsuryaghar.gov.in), then apply on BESCOM's SRTPV portal, install through a registered vendor, and get a net meter. For subsidised plants commissioned from 25 August 2026, KERC has fixed what BESCOM pays for units you export: ₹1.96 per unit (1–2 kW), ₹2.14 (above 2 up to 3 kW) and ₹2.58 (above 3 kW), for 25 years.
Updated 18 November 2026. We read KERC's DSPV tariff order dated 25 August 2026, BESCOM's SRTPV portal and its 1–10 kW domestic procedure, MNRE's incentive annexure published by PIB and PIB's August 2024 scheme backgrounder. The national portal returned an error when we tried to open it, so check it for any later change.
How much is the PM Surya Ghar subsidy in Bangalore?
- First 2 kW: ₹30,000 per kW (MNRE). So 1 kW = ₹30,000 and 2 kW = ₹60,000.
- The third kW: ₹18,000 (MNRE). So 3 kW = ₹78,000.
- Beyond 3 kW: no extra subsidy; the cap stays ₹78,000.
- Group housing societies and RWAs, for common facilities including EV charging: ₹18,000 per kW, up to 500 kW, counted at 3 kW per house (MNRE).
- Suggested size by use (PIB): 0–150 units a month, 1–2 kW; 150–300 units, 2–3 kW; above 300 units, above 3 kW.
- Collateral-free loans at around 7% are available for residential systems up to 3 kW (PIB, August 2024; confirm the current rate with the bank).
Who is eligible, including flat owners?
PIB lists four conditions: an Indian citizen, owning a house with a roof suitable for solar, a valid electricity connection, and no earlier solar subsidy. MNRE's annexure says any consumer tagged to a residential connection can install on a roof, terrace, balcony or elevated structure. In an apartment, the terrace is usually common property, so an individual owner needs the association's written consent and an allotted roof area. For most complexes the cleaner route is the RWA common-facilities subsidy described below.
How to apply: national portal plus BESCOM, step by step
- 1. Register on pmsuryaghar.gov.in with your BESCOM consumer (account) number and mobile number, and apply (PIB).
- 2. Apply on BESCOM's SRTPV portal under the PM Surya Ghar (subsidy) route; BESCOM's portal says to do this after registering on the national portal.
- 3. On BESCOM's portal, enter rooftop details (capacity, shadow-free area, connection type), pay the application, processing and e-sign fees, and e-sign the power purchase agreement. All three must be done within 15 days or the application is auto-cancelled without refund (BESCOM procedure).
- 4. An approval letter is generated. Install through a registered vendor and upload the work completion report within 150 days of the application (BESCOM procedure).
- 5. BESCOM's sub-divisional officer inspects and commissions within 5 working days of the completion report. If it is not commissioned in 5 days, the officer is liable to pay ₹1,000 a day and the consumer is entitled to deemed generation benefit (BESCOM procedure).
- 6. Billing starts within 30 days of commissioning (BESCOM procedure).
- 7. Get the commissioning certificate on the national portal, submit bank details and a cancelled cheque, and receive the subsidy, which PIB says comes within 30 days.
What does BESCOM pay for exported solar units in 2026?
KERC's order of 25 August 2026 applies to plants whose PPAs are signed or applications submitted and that are commissioned from 25 August 2026 to 30 June 2029, with 25-year PPAs:
- Domestic 1–10 kW without subsidy: ₹3.89 per unit.
- PM Surya Ghar with subsidy, 1 kW up to 2 kW: ₹1.96 per unit.
- Above 2 kW up to 3 kW: ₹2.14 per unit.
- Above 3 kW: ₹2.58 per unit.
- Other net-metering plants up to 1,000 kW (such as common-area plants): ₹3.11 with DCR (Indian-cell) modules, ₹2.34 with non-DCR; virtual or group net metering gets 75% of these.
- KERC's benchmark capital cost for domestic 1–10 kW plants is ₹45,000 per kW including taxes, and it assumes a 19% capacity utilisation factor.
Worked example: payback for a 3 kW plant on a Bengaluru house
- Cost at KERC's benchmark: 3 × ₹45,000 = ₹1,35,000. Less subsidy ₹78,000 = ₹57,000 net. Vendor quotes will vary.
- Output at KERC's 19% factor: 3 kW × 8,760 hours × 19% ≈ 4,993 units a year, about 416 a month (PIB says a 3 kW system can make over 300 units a month).
- Case A, you use it all: at an assumed ₹6 per unit grid rate (check the energy charge on your BESCOM bill), savings ≈ ₹29,959 a year. Payback ≈ 1.9 years.
- Case B, half used, half exported: 2,497 units × ₹6 + 2,497 units × ₹2.14 ≈ ₹20,322 a year. Payback ≈ 2.8 years.
- Without the subsidy: ₹1,35,000 ÷ ₹29,959 ≈ 4.5 years in Case A.
- If your bill is already near zero under a state free-electricity scheme, savings are smaller; size the plant to the units you actually pay for.
Can an apartment association get the solar subsidy?
Yes, for common facilities. MNRE allows ₹18,000 per kW for group housing societies and RWAs, up to 500 kW at 3 kW per house. A 200-flat complex installing 100 kW for lifts, pumps, lighting and EV chargers would qualify for 100 × ₹18,000 = ₹18 lakh. At KERC's DCR benchmark of ₹36,015 per kW, the plant would cost about ₹36 lakh before subsidy, and at 19% it would generate about 1,66,440 units a year. Put it to a general body vote, and see Green & Sustainable Buildings: A Luxury Buyer's Guide for what green features are worth. Buying new? Ask whether the project's common-area solar is in the sanctioned plan; browse Brigade Eternia for an example listing, and check utility set-up costs in BESCOM and BWSSB Charges for a New Flat in Bangalore (2026).