For a typical Bangalore flat you need to pay 20% of the price yourself if the loan is up to ₹75 lakh, and 25% if the loan is above ₹75 lakh, because RBI caps how much of a home's value a bank may lend. On top of that, banks may not fund stamp duty and registration (about 7.6% of value for flats above ₹45 lakh in Karnataka), and an under-construction flat adds 5% GST. So a ready ₹1 crore flat needs about ₹32.7 lakh of your own money, and an under-construction one about ₹37.7 lakh.
Updated 20 November 2026. We read the loan-to-value (LTV) table and the stamp-duty rule in RBI's Commercial Banks – Credit Facilities Directions, 2025 (updated as on 1 October 2026), the August 2025 Karnataka registration-fee notification as reported by King Stubb & Kasiva, the GST Council's real-estate rates and Section 13 of the RERA Act, then worked the numbers for three Bangalore price points.
What is the minimum down payment for a home loan in 2026?
RBI sets the minimum through the LTV ratio, the share of the property value a bank may lend. Paragraph 111 of the Credit Facilities Directions lists the current caps. Note that the slab depends on the loan amount, not the flat's price.
- Loan up to ₹30 lakh: LTV up to 90%, so you pay at least 10%.
- Loan above ₹30 lakh and up to ₹75 lakh: LTV up to 80%, so you pay at least 20%.
- Loan above ₹75 lakh: LTV up to 75%, so you pay at least 25%.
- These are ceilings. A bank can lend less after checking your income, age and the property's valuation (see LTV Ratio and FOIR: How Much Home Loan You Will Really Get in 2026).
Why do stamp duty and registration come out of your own pocket?
Paragraph 113 of the same Directions says a bank shall not include stamp duty, registration and other documentation charges in the cost of the house it finances. The only exception is a home costing up to ₹10 lakh, where these charges may be added to the cost for the LTV calculation. Almost no Bangalore flat is that cheap, so plan to pay these in cash.
In Karnataka, stamp duty is 5% for properties above ₹45 lakh (3% for ₹20–45 lakh, 2% below ₹20 lakh), plus a cess of about 10% of the duty and a small surcharge. The registration fee doubled from 1% to 2% of value from 31 August 2025. King Stubb & Kasiva put the combined cost at roughly 7% to 7.6% for urban deals in Bengaluru. Duty is charged on the higher of the sale price and the guidance value (see Bangalore guidance values and Bangalore stamp duty calculator).
How much GST do you pay on an under-construction flat?
Since 1 April 2019, residential flats outside the affordable segment attract an effective 5% GST without input tax credit, and affordable flats attract 1%. An affordable flat in Bengaluru, a metropolitan city in the GST Council's list, is one with a carpet area up to 60 sq m (about 646 sq ft) and a value up to ₹45 lakh. A ready flat sold after the occupancy certificate attracts no GST.
RBI's rule names stamp duty, registration and documentation charges but does not mention GST, and lenders treat it differently. Ask your bank in writing whether the sanction covers the GST on each demand; if not, it is part of your down payment. Rates for each case are in GST on Flat Purchase in Bangalore 2026: 1% vs 5%, Examples.
Down payment for a ₹60 lakh, ₹1 crore and ₹2 crore flat in Bangalore
Each example assumes the bank lends the full RBI cap and the sale value equals the guidance value. Stamp duty is taken at 5.65% (5% duty plus cess and the higher surcharge), so real figures may be slightly lower. Builder charges such as maintenance deposit and club fees are extra.
- ₹60 lakh flat (ready): loan ₹48 lakh (80%); margin ₹12 lakh; stamp duty about ₹3.39 lakh; registration ₹1.2 lakh; own cash about ₹16.6 lakh (28% of price).
- ₹60 lakh flat (under construction): add 5% GST of ₹3 lakh; own cash about ₹19.6 lakh (33%).
- ₹1 crore flat (ready): loan ₹75 lakh (75%); margin ₹25 lakh; stamp duty about ₹5.65 lakh; registration ₹2 lakh; own cash about ₹32.7 lakh.
- ₹1 crore flat (under construction): add GST of ₹5 lakh; own cash about ₹37.7 lakh.
- ₹2 crore flat (ready): loan ₹1.5 crore (75%); margin ₹50 lakh; stamp duty about ₹11.3 lakh; registration ₹4 lakh; own cash about ₹65.3 lakh.
- ₹2 crore flat (under construction): add GST of ₹10 lakh; own cash about ₹75.3 lakh.
Why a ₹95 lakh flat needs more cash than you expect
Because the slab follows the loan amount, the largest loan for flats between ₹93.75 lakh and ₹1 crore is stuck at ₹75 lakh. At ₹93.75 lakh, 80% is exactly ₹75 lakh. At ₹95 lakh, an 80% loan would be ₹76 lakh, which falls in the 75% slab, so the bank can lend either ₹75 lakh (79% of value, within the 80% slab) or 75% of value (₹71.25 lakh). The higher of the two is ₹75 lakh, so every extra rupee of price in this band comes from you.
- ₹90 lakh flat: maximum loan ₹72 lakh; margin ₹18 lakh.
- ₹95 lakh flat: maximum loan ₹75 lakh; margin ₹20 lakh.
- ₹1 crore flat: maximum loan ₹75 lakh; margin ₹25 lakh.
- ₹1.1 crore flat: maximum loan ₹82.5 lakh; margin ₹27.5 lakh.
When do you pay the money: booking, agreement or possession?
Under Section 13(1) of the RERA Act, a builder may not take more than 10% of the flat's cost as an advance or application fee before a written agreement for sale is signed and registered. So the first cheque is capped at 10%; the rest of your margin is paid as construction stages are demanded. Details are in Booking Amount for Flat in Bangalore: The 10% RERA Rule.
For a ready flat, the whole margin, stamp duty and registration are paid at the sale deed. For an under-construction flat, your share and the bank's share are released together against each demand, and GST is charged on each one. A full cost sheet with builder charges is in Flat Cost Sheet in Bangalore: 12 Charges, One Worked Example.
What does a zero down payment flat in Bangalore really mean?
RBI does not allow a bank to lend 100% of a home's value, so an advert for ‘zero down payment’ is a payment plan, not a bigger loan. Usually the builder defers part of your margin until possession, or pays the pre-EMI interest for a period (a subvention plan). Your contribution is postponed, not removed, and stamp duty and registration still have to be paid in cash.
RBI's paragraphs 114 to 116 tell banks that disbursal to individuals must be linked closely to construction stages, and that upfront disbursal shall not be made for incomplete or under-construction projects (government-sponsored projects are the exception). Before you accept such a plan, read who pays the EMI, until when, and what happens if the builder stops paying. See Construction Linked Plan vs Subvention in Bangalore 2026.
How can you lower the cash you need?
- Choose a ready flat with an occupancy certificate: no GST.
- Check whether the flat qualifies as affordable (up to 60 sq m carpet and ₹45 lakh): GST falls to 1% and stamp duty to 3% or less.
- Keep the loan just under a slab line: ₹30 lakh (90% LTV) or ₹75 lakh (80% LTV).
- Ask for the guidance value of the flat before you agree the price, since duty is paid on the higher figure.
- Keep a reserve for the maintenance deposit, corpus and loan processing fee, which banks do not fund. Our first-time buyer guide lists them: First-Time Home Buyer Guide Bangalore 2026: 10 Steps.