Delivery record · from RERA
Is Akshaya reliable?
Per the regulators' own registers, in Tamil Nadu, 2 of 11 registered projects are marked completed, 2 of them without any extension.
11 registrations · checked 6 October 2026
Tamil Nadu · TNRERA
11
Registered projects
2 completed · 8 ongoing
100%
Completed without any extension
2 of 2 completed projects
50%
Needed an extension
5 of 10 projects whose promised date has passed
7
Overdue now
Ongoing projects past their latest RERA date and not marked completed
TNRERA marks projects as completed but publishes the completion date only inside PDF certificates, so we report completions and extensions rather than months of delay.
Every registration
Akshaya projects on RERA
Underlined names are listed on Property Point. Newest registrations first.
| Project | Registered | Promised | Extended to | Outcome |
|---|---|---|---|---|
| The MosaicTamil Nadu | Jun 2023 | Dec 2023 | Mar 2025 (2) | Overdue |
| TangoTamil Nadu | May 2021 | — | None | Completed · no extension |
| RepublicTamil Nadu | Apr 2021 | Dec 2021 | None | Overdue |
| OrlandoTamil Nadu | Dec 2019 | Aug 2020 | Sept 2023 (3) | Registration cancelled (fully or in part) |
| Construction of Stilt floor + 4 Floors Residential Building with 28 dwelling uniTamil Nadu | Nov 2019 | Dec 2022 | None | Overdue |
| Construction of Stilt floor + 4 floors residential building with 312 dwelling unTamil Nadu | Sept 2018 | Aug 2020 | None | Overdue |
| Construction of Stilt floor + 3 floors residential building with 130 dwelling unTamil Nadu | Sept 2018 | May 2020 | Nov 2023 (3) | Overdue |
| Construction of Stilt Floor + 13 Floors for Residential Blocks A & B and GroundTamil Nadu | Aug 2017 | May 2019 | Nov 2024 (5) | Overdue |
| Construction of Multi Storeyed Block B only situated at New Ward-MTamil Nadu | Aug 2017 | May 2022 | None | Overdue |
| Construction of Basement Floor+ Ground Floor+ 6 Floors office building with CafeTamil Nadu | Aug 2017 | Dec 2018 | None | Completed · no extension |
| Construction of Multi Storeyed Block B only at S.No. 355/1ATamil Nadu | Aug 2017 | May 2022 | Nov 2026 (4) | In progress |
Companies these projects are registered under (5)
- AKSHAYA PRIVATE LIMITED · Tamil Nadu
- Akshaya · Tamil Nadu
- Akshaya Leisure Pvt. Ltd. · Tamil Nadu
- Akshaya Pvt. Ltd · Tamil Nadu
- Akshaya Pvt. Ltd. · Tamil Nadu
How we measured
- Promised is the completion date the builder declared when the project was registered with RERA. For projects already under way in 2017, that is the date declared at registration, not the original launch promise.
- Extended to is the latest date allowed after extensions. These include the blanket COVID-19 extensions regulators granted in 2020–21, so part of some delays was not the builder's doing.
- Delay is counted in months between the promised date and completion; a project finished early counts as zero.
- Projects are matched to builders by the registered promoter company and, for joint ventures, by the project name. A registration is left out when the match is uncertain.
Sources
- TNRERA — Tamil Nadu building projects
- Data as filed by builders on each regulator's public register, last checked Oct 2026 (6 October 2026). Registers can lag; verify any figure on the regulator's site before you rely on it.
Good to know
Questions buyers ask
Does Akshaya Pvt Ltd deliver on time?+
Per the regulators' own registers, in Tamil Nadu, 2 of 11 registered projects are marked completed, 2 of them without any extension. "Promised" means the completion date declared at RERA registration; delays include the blanket COVID-19 extensions of 2020–21.
How many Akshaya Pvt Ltd projects are registered with RERA?+
11 with TNRERA (Tamil Nadu building projects). 2 of them are completed and 8 are ongoing.
Which Akshaya Pvt Ltd projects are running late?+
7 ongoing registrations are past the latest date allowed on RERA without a completion on file, including The Mosaic, Republic, Construction of Stilt floor + 4 Floors Residential Building with 28 dwelling uni, Construction of Stilt floor + 4 floors residential building with 312 dwelling un, Construction of Stilt floor + 3 floors residential building with 130 dwelling un. A missing filing can lag the work on site, so check the regulator's page before concluding a project is stalled.
How can I check a Akshaya project's RERA record myself?+
Search the project's registration number on TNRERA (rera.tn.gov.in). Compare the completion date at registration with the current date, read any extension orders, and look for an occupancy or completion certificate.
Compare Akshaya with the other developers we track, or see the Akshaya homes listed now.