Chennai Metro · Green Line and Yellow Line (Corridor 4)
Vadapalani Metro Station: homes within 2 km
Vadapalani is an interchange on the Green Line and Yellow Line (Corridor 4) of Chennai Metro. The Green Line here has been open end to end since 25 May 2018 (Wikipedia; The Hindu, 25 May 2018; as of October 2026). The Yellow Line (Corridor 4) here has been open since 11 Oct 2026 (status checked 22 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹3.12 Cr, and 1 ready-to-move.
Within 2 km, nearest first
1 new home near Vadapalani
| Project | Distance | From | Homes | Possession |
|---|---|---|---|---|
| Baashyaam SrinivasaBaashyaam · West Mambalam3 and 4 BHK · Dec 2030 | 1.8 km | ₹3.12 Cr | 3 and 4 BHK | Dec 2030 |
Ready-to-move homes within 2 km (1) are not listed here.
The station
Lines and status
- Green LineOpen
- Open end to end since 25 May 2018Wikipedia; The Hindu, 25 May 2018; as of October 2026
- Yellow Line (Corridor 4)Open
- Poonamallee Bypass – VadapalaniSince 11 Oct 2026Status checked 22 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
