Chennai Metro · Green Line and Red Line (Corridor 5)
St. Thomas Mount Metro Station: homes within 2 km
St. Thomas Mount is an interchange on the Green Line and Red Line (Corridor 5) of Chennai Metro. The Green Line here has been open end to end since 25 May 2018 (Wikipedia; The Hindu, 25 May 2018; as of October 2026). The Red Line (Corridor 5) here is under construction on the Alandur – Sholinganallur stretch; target around March 2027 (CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026). None of the new-launch or under-construction projects we list is within 2 km of the station yet; 1 ready-to-move project is.
Within 2 km, nearest first
Homes near St. Thomas Mount
None of the new-launch or under-construction homes we list is within 2 km of St. Thomas Mount yet. The nearest stations below, or homes near every Chennai Metro station.
The station
Lines and status
- Green LineOpen
- Open end to end since 25 May 2018Wikipedia; The Hindu, 25 May 2018; as of October 2026
- Red Line (Corridor 5)Under construction
- Alandur – SholinganallurTarget Around March 2027CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
