Chennai Metro · Purple Line (Corridor 3) and Red Line (Corridor 5)
Sholinganallur Metro Station: homes within 2 km
Sholinganallur is an interchange on the Purple Line (Corridor 3) and Red Line (Corridor 5) of Chennai Metro. The Purple Line (Corridor 3) here is under construction; target around March 2027 (CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026). The Red Line (Corridor 5) here is under construction on the Alandur – Sholinganallur stretch; target around March 2027 (CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026). None of the new-launch or under-construction projects we list is within 2 km of the station yet.
Within 2 km, nearest first
Homes near Sholinganallur
None of the new-launch or under-construction homes we list is within 2 km of Sholinganallur yet. The nearest stations below, or homes near every Chennai Metro station.
The station
Lines and status
- Purple Line (Corridor 3)Under construction
- Nehru Nagar – Sholinganallur – SIPCOT (elevated, OMR)Target Around March 2027CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026
- Red Line (Corridor 5)Under construction
- Alandur – SholinganallurTarget Around March 2027CMRL aim for its elevated corridors, via TOI, Feb 2026; status checked 20 October 2026
How we measured
Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.
